← Back
BuildNYC
Two family frame
135-02 87TH AVENUE
QUEENS · Kew Gardens · BIN 4206362
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R4AZoning
2,358 sfGross Floor Area
2Units
5 Active Violations ▸FDNY Report ↗
Two family frame · 4,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
AtticRemoval of Violations and Swo By Legalizing Interior Renovat1p · 2 filings · 14 docs
Floor 1Removal of Violations and Swo By Legalizing Interior Renovat1 filing · 6 docs
CellarRemoval of Violations and Swo By Legalizing Interior Renovat2p · 2 filings · 14 docs
Site & exteriorRemoval of Violations and Swo By Legalizing Interior Renovat1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Barry J. Bank, P.E., Consulting Engineering308/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Johnny's P&H ContractingPlumbing207/08/2026
Assured BuildersGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Barry J. Bank, P.E1868308/23/2023
Building Lifecycle
All (51)Filed (3)Permit Issued (3)Signed Off (3)Violation (14)Inspection (6)Objection (8)Special Inspection (14)
10/13/2023
Signed off — Alteration
Filed to propose replacement boiler in conjunction with legalization application.
Q08038100-I1
10/13/2023
Signed off — Alteration
Filed to propose replacement boiler in conjunction with legalization application.
Q08038100-S1
09/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/04/2023
Permit issued — Plumbing
Q08038100-S1-PL
08/23/2023
Filed — Alteration
Filed to propose replacement boiler in conjunction with legalization application.
Q08038100-S1
07/14/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/23/2023
Signed off — Alteration
Q08038096-I1
04/03/2023
Permit issued — General Construction
Q08038096-I1-GC
03/16/2023
Permit issued — Plumbing
Q08038100-I1-PL
01/11/2023
Objection raised — Accessibility
01/11/2023
Objection resolved — Addressed
12/07/2022
Objection raised — Admin
12/07/2022
Objection resolved — Addressed
12/07/2022
Objection raised — Cost
12/07/2022
Objection resolved — Addressed
12/07/2022
Objection raised — Accessibility
12/07/2022
Objection resolved — Addressed
12/06/2022
Filed — Alteration
Filed to propose replacement boiler in conjunction with legalization application.
Q08038100-I1
12/06/2022
Filed — Alteration
Q08038096-I1
12/05/2022
Special inspection requirement — Maintenance information
Barry Bank, P.E.
12/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
Barry Bank, P.E.
12/05/2022
Special inspection requirement — Interior lighting power
Barry Bank, P.E.
12/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Barry Bank, P.E.
12/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
Barry Bank, P.E.
12/02/2022
Special inspection requirement — Ventilation and air distribution system
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Air barrier - visual inspection
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fenestration areas
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Final
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fenestration air leakage
Barry Bank, P.E.
11/10/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Barry Bank, P.E.
09/21/2022
Violation issued (ECB, closed)
Construction
09/20/2022
Violation issued (ECB, closed)
Construction
04/02/2015
Violation issued (HPD, open)
B
04/02/2015
Violation issued (HPD, open)
B
04/02/2015
Violation issued (HPD, open)
B
06/30/2012
Violation issued (ECB, closed)
Construction
06/22/2012
Violation issued (ECB, closed)
Construction
06/22/2012
Violation issued (ECB, closed)
Construction
12/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2011
Violation issued (ECB, closed)
Construction
06/20/2011
Violation issued (HPD, open)
I
06/02/2011
Violation issued (HPD, open)
C
05/05/2006
Violation issued (ECB, closed)
Construction
12/02/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohnny Nanhu09/04/2023
DOB NOWGeneral ConstructionSigned-offAssured Builders04/03/2023
DOB NOWPlumbingSigned-offJohnny Nanhu03/16/2023
1 project · most recent 01/12/2023
General Wiring
FiledStatusContractorScope
01/12/2023CompleteC & A ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
12/05/2022Maintenance informationBarry Bank, P.E.energy_progress
12/05/2022HVAC-R and service water heating system controlsBarry Bank, P.E.energy_progress
12/05/2022Interior lighting powerBarry Bank, P.E.energy_progress
12/05/2022HVAC-R and service water piping design and insulationBarry Bank, P.E.energy_progress
12/05/2022HVAC-R and service water heating equipmentBarry Bank, P.E.energy_progress
12/02/2022Ventilation and air distribution systemBarry Bank, P.E.energy_progress
11/10/2022Air barrier - visual inspectionBarry Bank, P.E.energy_progress
11/10/2022Fire-Resistant Penetrations and JointsBarry Bank, P.E.special
11/10/2022Fenestration areasBarry Bank, P.E.energy_progress
11/10/2022Fire-Resistant Penetrations and JointsBarry Bank, P.E.special
11/10/2022FinalBarry Bank, P.E.progress
11/10/2022Energy Code Compliance InspectionsBarry Bank, P.E.progress
11/10/2022Fenestration air leakageBarry Bank, P.E.energy_progress
11/10/2022Fenestration and door U-factor and product ratingsBarry Bank, P.E.energy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q08038100-I1Request digital key ↗
08/25/2026Q08038100-S1Request digital key ↗
08/15/2026Q08038096-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q08038096-I1Open ↗
08/13/2026Q08038100-I1Open ↗
08/13/2026Q08038100-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026Q08038096-I1Open ↗
08/28/2026Q08038096-I1Open ↗
08/23/2026Q08038100-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q08038096-I1Open ↗
08/23/2026Q08038100-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q08038096-I1Open ↗
08/13/2026Q08038100-I1Open ↗
08/13/2026Q08038100-S1Open ↗