← Back
BuildNYC
Elevator apt, semi-fireproof without stores
135-05 HOOVER AVENUE
QUEENS · BIN 4206550
💬 Discuss this project
1952Year Built
6Stories
D1Building Class
R5DZoning
61,218 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized16 Active Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · 31,260 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofArgo Real Estate21p · 2 filings · 18 docs
BulkheadArgo Kew Gardens FISP Repair Program2p · 1 filing · 16 docs
Floor 1Argo Kew Gardens FISP Repair Program13p · 1 filing · 16 docs
CellarArgo Real Estate4p · 1 filing · 2 docs
Site & exteriorArgo Real Estate27p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Argo Real Estate1407/08/2026
Biltmore Realty Associates603/22/2026
The Argo103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
Rand Engineering & Arch403/21/2026
Synergy Building Consultants303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BridgeScaffold807/08/2026
Lawrence Exterior Restorationspecialty_contractor407/08/2026
Lawrence Exterior RestorationScaffold207/08/2026
Irwin Electr'l Contractors, IElectrical103/21/2026
Central Air Conditioningspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Building Consulting Engineering1034103/01/2024
Rand Engineering & Architects266203/01/2024
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
07/31/2026
Elevator Category 1 inspection report filed
01/27/2026
Boiler inspection report filed
Initial · no defects · Accepted
08/27/2025
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 1st…
HPD violation · open
08/27/2025
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE THE BATHTUB WITH PORCELAIN PAINT IN THE BATHROOM LOCATED…
HPD violation · open
138 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCentral Air Conditioning07/01/2024
DOB NOWStructuralPermit IssuedLawrence Exterior Restoration05/14/2024
DOB NOWSidewalk ShedSigned-offCS Bridge01/02/2024
DOB NOWSupported ScaffoldSigned-offLawrence Exterior Restoration02/02/2023
DOB NOWStructuralPermit IssuedLawrence Exterior Restoration01/26/2023
DOB NOWSidewalk ShedSigned-offCS Bridge01/05/2023
DOB NOWSupported ScaffoldSigned-offLawrence Exterior Restoration08/01/2022
DOB NOWGeneral ConstructionPermit IssuedLawrence Exterior Restoration04/27/2022
DOB NOWSidewalk ShedSigned-offCS Bridge01/05/2022
DOB NOWSidewalk ShedSigned-offCS Bridge01/06/2021
DOB NOWSidewalk ShedSigned-offCS Bridge01/10/2020
BISOTISSUEDAbilene11/09/2004
BISOTISSUEDNational Microwave Contractor08/06/1998
BISEQISSUEDM.B. Waterproofing03/03/1998
BISOTISSUEDM.B. Waterproofing03/03/1998
BISFSISSUEDAbilene07/31/1996
1 project · most recent 03/01/2024
Ventilation Systems
FiledStatusContractorScope
03/01/2024Permit IssuedCentral Air ConditioningVentilation Systems
3 projects · most recent 01/07/2025
General Wiring
FiledStatusContractorScope
01/07/2025CompleteVilanova Electrical Conts—
03/13/2024CompleteBelmont ElectricalGeneral Wiring
01/08/2020CompleteNash Electric Services—
1 project · most recent 03/01/2024
Concrete
FiledStatusContractorScope
03/01/2024Permit IssuedCentral Air ConditioningConcrete
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/25/2024Shutoff dampersPeter Varsalonaenergy_progress
03/01/2024Energy Code Compliance InspectionsPeter Varsalonaprogress
02/22/2024FinalPeter Varsalonaprogress
02/22/2024Electrical motors and elevatorsPeter Varsalonaenergy_progress
02/22/2024Mechanical SystemsPeter Varsalonaspecial
02/22/2024Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
02/22/2024Maintenance informationPeter Varsalonaenergy_progress
10/01/2021Fenestration and door U-factor and product ratingsJohn Monroeenergy_progress
10/01/2021Energy Code Compliance InspectionsJohn Monroeprogress
10/01/2021Fenestration areasJohn Monroeenergy_progress
10/01/2021Air barrier - visual inspectionJohn Monroeenergy_progress
10/01/2021Fenestration air leakageJohn Monroeenergy_progress
10/01/2021Insulation placement and R valuesJohn Monroeenergy_progress
04/15/2021MasonryJohn Monroespecial
04/15/2021FinalJohn Monroeprogress
04/15/2021Structural Stability – Alterations of existing buildingsJohn Monroespecial
04/15/2021Structural Steel - High Strength BoltingJohn Monroespecial
04/15/2021Post-installed AnchorsJohn Monroespecial
29 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account