← Back
Auto body / collision or auto repair
135-15 130 PLACE
QUEENS · South Ozone Park · BIN 4257419
💬 Discuss this project
1975Year Built
1Stories
G2Building Class
R3-2Zoning
3,600 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Auto body / collision or auto repair · 3,686 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction22p · 1 filing · 20 docs
Floor 1Under Construction33p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DGJ CONTRACTING803/22/2026
RUNWAY COLLLISION SPECIALISTS, INC.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/811/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FIRE VIOLATION SERVICES1403/21/2026
ASHOK ARCHITECTURE DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DGJ CONTRACTING INCGeneral Contractor1107/08/2026
LEFKES WATER WORKS INCPlumbing307/08/2026
PAPPAS & FODERA ELECT'LElectrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHOK ARCHITECTURE DESIGN6027711/13/2025
Building Lifecycle
All (67)Filed (8)Permit Issued (8)Violation (11)Inspection (8)Objection (2)Special Inspection (30)
01/15/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
12/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
12/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
12/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
12/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
11/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INCREASE EXITING GAS METER TO 1.5MBTU ROTARY METER FOR GAS BURN TO SPRAY BOOTH. Plumbing Work for Two ADA Bathrooms each with Toilet and Lavatory. New Floor Drains and New Roof Drains.
Q00805955-P4
11/13/2025
Permit issued — Plumbing
Q00805955-S2-PL
11/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
11/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
11/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
11/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
07/08/2025
Permit issued — Plumbing
Q00805955-S2-PL
11/25/2024
Permit issued — Mechanical Systems
Q00805955-I1-GC
10/10/2024
Special inspection requirement — Fenestration areas
Ashish Patel
10/10/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ashish Patel
10/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
10/10/2024
Special inspection requirement — Shutoff dampers
Ashish Patel
10/10/2024
Special inspection requirement — Insulation placement and R values
Ashish Patel
10/10/2024
Special inspection requirement — Fenestration air leakage
Ashish Patel
10/10/2024
Special inspection requirement — Lighting controls
Ashish Patel
10/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
10/10/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Ashish Patel
10/10/2024
Special inspection requirement — Masonry
Ashish Patel
10/10/2024
Special inspection requirement — Final
Ashish Patel
10/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
10/10/2024
Special inspection requirement — Exterior lighting power
Ashish Patel
10/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
10/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
10/10/2024
Special inspection requirement — Subgrade Inspections
Ashish Patel
10/10/2024
Special inspection requirement — Interior lighting power
Ashish Patel
10/10/2024
Special inspection requirement — Air barrier - visual inspection
Ashish Patel
10/10/2024
Special inspection requirement — Sprayed fire-resistant materials
Ashish Patel
09/25/2024
Permit issued — Structural
Q00805955-S3-ST
08/22/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INCREASE EXITING GAS METER TO 1.5MBTU ROTARY METER FOR GAS BURN TO SPRAY BOOTH. Plumbing Work for Two ADA Bathrooms each with Toilet and Lavatory. New Floor Drains and New Roof Drains.
Q00805955-P3
08/21/2024
Violation issued (ECB, open)
Construction
08/08/2024
Permit issued — General Construction
Q00805955-I1-GC
07/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/08/2024
Violation issued (ECB, closed)
Construction
12/17/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
INCREASE EXITING GAS METER TO 1.5MBTU ROTARY METER FOR GAS BURN TO SPRAY BOOTH. Plumbing Work for Two ADA Bathrooms each with Toilet and Lavatory. New Floor Drains and New Roof Drains.
Q00805955-P1
11/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/22/2023
Violation issued (ECB, closed)
Construction
10/26/2023
Objection resolved — Addressed
10/24/2023
Objection raised — Zoning
10/18/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
INCREASE EXITING GAS METER TO 1.5MBTU ROTARY METER FOR GAS BURN TO SPRAY BOOTH. Plumbing Work for Two ADA Bathrooms each with Toilet and Lavatory. New Floor Drains and New Roof Drains.
Q00805955-P2
10/05/2023
Permit issued — Plumbing
Q00805955-S2-PL
06/20/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
INCREASE EXITING GAS METER TO 1.5MBTU ROTARY METER FOR GAS BURN TO SPRAY BOOTH. Plumbing Work for Two ADA Bathrooms each with Toilet and Lavatory. New Floor Drains and New Roof Drains.
Q00805955-S3
06/08/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
INCREASE EXITING GAS METER TO 1.5MBTU ROTARY METER FOR GAS BURN TO SPRAY BOOTH. Plumbing Work for Two ADA Bathrooms each with Toilet and Lavatory. New Floor Drains and New Roof Drains.
Q00805955-S2
06/02/2023
Violation issued (ECB, closed)
Construction
06/02/2023
Violation issued (ECB, closed)
Construction
06/02/2023
Violation issued (ECB, open)
Construction
06/02/2023
Violation issued (ECB, closed)
Unknown
06/02/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedLEFKES WATER WORKS INC11/13/2025
DOB NOWPlumbingPermit IssuedLEFKES WATER WORKS INC07/08/2025
DOB NOWMechanical SystemsPermit IssuedDGJ CONTRACTING INC11/25/2024
DOB NOWStructuralPermit IssuedDGJ CONTRACTING INC09/25/2024
DOB NOWGeneral ConstructionPermit IssuedDGJ CONTRACTING INC08/08/2024
DOB NOWPlumbingPermit IssuedLEFKES WATER WORKS INC10/05/2023
DOB NOWGeneral ConstructionPermit IssuedDGJ CONTRACTING INC05/12/2023
DOB NOWConstruction FencePermit IssuedDGJ CONTRACTING INC03/30/2023
1 project · most recent 11/13/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/13/2025Permit IssuedDGJ CONTRACTING INCVentilation Systems
Ventilation
Usi Italia USI Italia 19,000 CFM ×1
1 project · most recent 11/13/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/13/2025Permit IssuedLEFKES WATER WORKS INCGas, Storm, Water/Sanitary
1 project · most recent 02/17/2025
General Wiring
FiledStatusContractorScope
02/17/2025Permit IssuedPAPPAS & FODERA ELECT'LGeneral Wiring
1 project · most recent 11/13/2025
FiledStatusContractorScope
11/13/2025Permit IssuedLEFKES WATER WORKS INC1 scope_items
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/15/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
12/01/2025Fire-Resistant Penetrations and JointsAshish Patelspecial
12/01/2025HVAC-R and service water heating system controlsAshish Patelenergy_progress
12/01/2025HVAC-R and service water heating equipmentAshish Patelenergy_progress
12/01/2025HVAC-R and service water piping design and insulationAshish Patelenergy_progress
12/01/2025Energy Code Compliance InspectionsAshish Patelprogress
11/13/2025Fire-Resistant Penetrations and JointsAshish Patelspecial
11/13/2025Energy Code Compliance InspectionsAshish Patelprogress
11/13/2025HVAC-R and service water piping design and insulationAshish Patelenergy_progress
11/13/2025HVAC-R and service water heating equipmentAshish Patelenergy_progress
11/13/2025HVAC-R and service water heating system controlsAshish Patelenergy_progress
10/10/2024FinalAshish Patelprogress
10/10/2024Energy Code Compliance InspectionsAshish Patelprogress
10/10/2024Fire-Resistance Rated ConstructionAshish Patelprogress
10/10/2024Fenestration and door U-factor and product ratingsAshish Patelenergy_progress
10/10/2024Exterior lighting powerAshish Patelenergy_progress
10/10/2024HVAC-R and service water piping design and insulationAshish Patelenergy_progress
10/10/2024HVAC-R and service water heating system controlsAshish Patelenergy_progress
10/10/2024Duct leakage testing, insulation and designAshish Patelenergy_progress
10/10/2024Insulation placement and R valuesAshish Patelenergy_progress
10/10/2024Interior lighting powerAshish Patelenergy_progress
10/10/2024HVAC-R and service water heating equipmentAshish Patelenergy_progress
10/10/2024Air barrier - visual inspectionAshish Patelenergy_progress
10/10/2024Shutoff dampersAshish Patelenergy_progress
10/10/2024Lighting controlsAshish Patelenergy_progress
10/10/2024Fenestration air leakageAshish Patelenergy_progress
Latest 25 of 94.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026Q00805955-P4Request digital key ↗
08/24/2026Q00805955-P3Request digital key ↗
08/24/2026Q00805955-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
05/26/2019440501556Open ↗
08/21/2018440501556Open ↗
▸Seals & Professional Certifications102
▸DOB NOWProgress Inspector Seal & Signature60
09/01/2026Q00805955-P2Open ↗
09/01/2026Q00805955-P2Open ↗
09/01/2026Q00805955-P2Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature34
09/01/2026Q00805955-P2Open ↗
09/01/2026Q00805955-P4Open ↗
08/28/2026Q00805955-S2Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00805955-I1Open ↗
08/24/2026Q00805955-P3Open ↗
08/24/2026Q00805955-P2Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/21/2018440501556Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/21/2018440501556Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00805955-P4Open ↗
08/24/2026Q00805955-P3Open ↗
08/24/2026Q00805955-P1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/04/2019440501556Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/04/2019440501556Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/21/2018440501556Open ↗
▸BISADDITIONAL INFORMATION1
03/04/2019440501556Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00805955-P3Open ↗
08/24/2026Q00805955-P1Open ↗
08/24/2026Q00805955-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00805955-I1Open ↗
08/13/2026Q00805955-P3Open ↗
08/13/2026Q00805955-P1Open ↗