One story - permanent living quarter
135-19 77 AVENUE
QUEENS · BIN 4142424
💬 Discuss this project
1965Year Built
1Stories
A2Building Class
R2XZoning
1,176 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 4,000 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction41p · 3 filings · 20 docs
Floor 1Under Construction46p · 3 filings · 20 docs
CellarUnder Construction45p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELKANAH103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2015$760K—— → —$646/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC1408/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ZOBUILDEN603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ELKANAH LLCGeneral Contractor507/08/2026
AP PLUMBING & HVAC LLCPlumbing207/08/2026
PAUL M. & SON'S ELECL CONElectrical103/22/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449408/01/2025
IP CONCRETE TESTING AND I6252211/25/2024
Building Lifecycle
All (113)Filed (14)Permit Issued (7)Signed Off (1)Violation (2)Inspection (13)Objection (46)Special Inspection (30)
11/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2025
Filed — Alteration
Filing an amendment for replacement of an interior garage door in cellar for FPSC door and concrete curb only as per Drg # A-100.03 Proposed Cellar Plan and Pured Concrete Deatil to satisfy DOB inspection objection.
Q00678858-P3
07/24/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/22/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/17/2025
Signed off — Alteration
Installation of 8 Feet High Construction Fence
Q00679259-I1
07/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/30/2025
Permit issued — Plumbing
Q00679248-I1-PL
04/15/2025
Filed — Alteration
FILING AMENDET REVISED PLAN P1-100.03.
Q00679248-P5
04/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/07/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
03/14/2025
Permit issued — Construction Fence
Q00679259-I1-FN
03/13/2025
Violation issued (ECB, closed)
Construction
02/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2025
Permit issued — General Construction
Q00678858-I1-GC-CX
01/20/2025
Objection resolved — Addressed
01/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/15/2024
Objection resolved — Addressed
12/12/2024
Objection raised — Scope
11/25/2024
Filed — Alteration
Revision of previously filed and approved set of drawings. Amendment to aproved plans for installation of sprinkler sysrem in one family house.
Q00861761-P2
11/24/2024
Special inspection requirement — Wood – Seismic Resistance
11/22/2024
Filed — Alteration
FILING AMENDET REVISED PLAN P1-100.03.
Q00679248-P4
11/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
Alfred Mierzejewski
11/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Alfred Mierzejewski
11/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
Alfred Mierzejewski
11/22/2024
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Alfred Mierzejewski
10/11/2024
Objection resolved — Addressed
10/09/2024
Objection raised — Scope
10/04/2024
Objection raised — Scope
10/04/2024
Objection resolved — Addressed
09/24/2024
Filed — Alteration
Revision of previously filed and approved set of drawings. Amendment to aproved plans for installation of sprinkler sysrem in one family house.
Q00861761-P1
09/24/2024
Filed — Alteration
FILING AMENDET REVISED PLAN P1-100.03.
Q00679248-P3
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
09/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Alfred Mierzejewski
09/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
Alfred Mierzejewski
09/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
Alfred Mierzejewski
09/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Alfred Mierzejewski
09/24/2024
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
08/06/2024
Permit issued — Sprinklers
Q00861761-I1-EW-SP
07/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/02/2024
Objection raised — Other
06/20/2024
Filed — Alteration
FILING AMENDET REVISED PLAN P1-100.03.
Q00679248-P2
06/20/2024
Filed — Alteration
Filing an amendment for replacement of an interior garage door in cellar for FPSC door and concrete curb only as per Drg # A-100.03 Proposed Cellar Plan and Pured Concrete Deatil to satisfy DOB inspection objection.
Q00678858-P2
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection resolved — Addressed
06/20/2024
Special inspection requirement — Electric vehicle service equipment requirements
Alfred Mierzejewski
06/20/2024
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
06/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
06/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Alfred Mierzejewski
06/20/2024
Special inspection requirement — Final
Alfred Mierzejewski
06/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
Alfred Mierzejewski
06/20/2024
Special inspection requirement — Preliminary
Alfred Mierzejewski
06/20/2024
Special inspection requirement — Structural Wood Frame
Alfred Mierzejewski
06/20/2024
Special inspection requirement — Lighting in dwelling units
Alfred Mierzejewski
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG05/30/2025
DOB NOWConstruction FenceSigned-offELKANAH03/14/2025
DOB NOWGeneral ConstructionPermit IssuedELKANAH01/28/2025
DOB NOWSprinklersPermit IssuedCROSSFIELD PLBG.&HTG.CORP08/06/2024
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG02/29/2024
DOB NOWStructuralPermit IssuedELKANAH02/02/2024
DOB NOWConstruction FenceSigned-offELKANAH02/01/2024
BISOTISSUEDVENTURE HOME SOLAR LLC04/07/2017
1 project · most recent 08/01/2025
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/01/2025Permit IssuedELKANAH LLCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
American Standard American Standard Heating and Airconditioning Model No. 4A7A6042J1000AA, Serial No. 17404K4M5F 16 BTU · Heat Pump Outdoor ×4
Heating
Weil-Mclain Model No. EG-40-SPON; Serial No. 4 50 BTU · Boiler ×4
Ventilation
— Ventilation from kitchen nd bathrooms 150 CFM ×4
Ducts & Piping
American Standard Extension of existing HVAC, which services first floor to the second floor. 16 BTU ×4
1 project · most recent 11/25/2024
FiledStatusContractorScope
11/25/2024Permit IssuedCROSSFIELD PLBG.&HTG.CORP121 heads
1 project · most recent 04/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/15/2025Permit IssuedCROSSFIELD PLBG.&HTGGas, Water/Sanitary
2 projects · most recent 10/01/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
10/01/2025CompleteTEAM H ELECTRIC LLCGeneral Wiring
10/24/2018Permit IssuedPAUL M. & SON'S ELECL CONHVAC Wiring
1 project · most recent 08/01/2025
Wood
FiledStatusContractorScope
08/01/2025Permit IssuedELKANAH LLCWood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
11/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/22/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/07/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
02/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
11/24/2024Wood – Seismic Resistance—special
11/22/2024HVAC-R and service water heating equipmentAlfred Mierzejewskienergy_progress
11/22/2024HVAC-R and service water piping design and insulationAlfred Mierzejewskienergy_progress
11/22/2024HVAC-R and service water heating system controlsAlfred Mierzejewskienergy_progress
11/22/2024Sprinkler SystemsINDARDEO PARBHUNATHspecial
11/22/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
11/22/2024Energy Code Compliance InspectionsAlfred Mierzejewskiprogress
09/24/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
09/24/2024HVAC-R and service water piping design and insulationAlfred Mierzejewskienergy_progress
09/24/2024HVAC-R and service water heating equipmentAlfred Mierzejewskienergy_progress
09/24/2024HVAC-R and service water heating system controlsAlfred Mierzejewskienergy_progress
09/24/2024Energy Code Compliance InspectionsAlfred Mierzejewskiprogress
09/24/2024Sprinkler SystemsINDARDEO PARBHUNATHspecial
06/20/2024Electric vehicle service equipment requirementsAlfred Mierzejewskienergy_progress
06/20/2024Mechanical SystemsMOHAMED MAHMOUDspecial
06/20/2024Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
06/20/2024Energy Code Compliance InspectionsAlfred Mierzejewskiprogress
06/20/2024FinalAlfred Mierzejewskiprogress
06/20/2024Fire-Resistance Rated ConstructionAlfred Mierzejewskiprogress
06/20/2024PreliminaryAlfred Mierzejewskiprogress
06/20/2024Structural Wood FrameAlfred Mierzejewskiprogress
06/20/2024Lighting in dwelling unitsAlfred Mierzejewskienergy_progress
06/20/2024Fenestration air leakageAlfred Mierzejewskienergy_progress
06/20/2024Interior lighting powerAlfred Mierzejewskienergy_progress
06/19/2024Energy Code Compliance InspectionsAlfred Mierzejewskiprogress
Latest 25 of 43.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/26/2026Q00679259-I1Request digital key ↗
08/21/2026Q00861761-P1Request digital key ↗
08/21/2026Q00861761-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/06/2017440396260Open ↗
▸BISWORK PERMIT APPLICATION1
04/06/2017440396260Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00678858-I1Open ↗
08/13/2026Q00678858-P3Open ↗
08/13/2026Q00678858-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00678858-P2Open ↗
08/13/2026Q00678858-P1Open ↗
08/13/2026Q00678858-P3Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026Q00679248-P4Open ↗
09/01/2026Q00679248-P4Open ↗
09/01/2026Q00679248-P4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/21/2026Q00861761-P2Open ↗
08/21/2026Q00861761-P1Open ↗
08/21/2026Q00861761-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026Q00861761-P2Open ↗
09/02/2026Q00861761-P2Open ↗
08/24/2026Q00861761-P1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/06/2017440396260Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/06/2017440396260Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/06/2017440396260Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
04/06/2017440396260Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/21/2026Q00861761-P1Open ↗
08/21/2026Q00861761-I1Open ↗
08/21/2026Q00861761-P2Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/06/2017440396260Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/09/2018440396260Open ↗
04/06/2017440396260Open ↗
04/06/2017440396260Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/06/2017440396260Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/09/2018440396260Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
01/09/2018440396260Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/06/2017440396260Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/09/2018440396260Open ↗
01/09/2018440396260Open ↗
04/06/2017440396260Open ↗
Showing 3 of 4 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/06/2017440396260Open ↗
▸Approvals, Objections & Sign-offs2
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
01/09/2018440396260Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/09/2018440396260Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/09/2018440396260Open ↗
04/06/2017440396260Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
01/18/2018440396260Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/06/2017440396260Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial4
08/13/2026Q00678858-I1Open ↗
08/13/2026Q00678858-P3Open ↗
08/13/2026Q00678858-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00678858-P3Open ↗
08/13/2026Q00678858-P2Open ↗
08/13/2026Q00678858-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00678858-P1Open ↗
08/13/2026Q00678858-P2Open ↗
08/13/2026Q00678858-P3Open ↗
Showing 3 of 4 on file for this type