DOB12/23/2008V-DOB VIOLATION - ACTIVE
ECB05/07/2012JOB SITE FENCE IS DEFECTIVE. NOTED:10FT SECTION OF FENCE AT REAR EXPOSURE 3 HAS COLLAPSED APP #4025667.Nothing owed — awaiting certificate of correction
ECB03/01/2012JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION. NOTED:AT ALL EXPOSURES SECTIONS OF CONSTRUCTION FENCE HAS FALLEN OVER MISSING SECTIONS UNDER JOB #402566709 EXPIRED 2-21-08. REM:REPAIR &/OR REPLACE FENCE.Nothing owed — awaiting certificate of correction
ECB03/01/2012WORK WITHOUT A PERMIT. NOTED:CONSTRUCTION FENCE UNDER JOB #402566709 EXPIRED 2-21-08 AT VACANT LOT NO WORK/ACTIVITY AT TIME OF INSPECTION. REM:OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITIONS.Nothing owed — awaiting certificate of correction
ECB08/24/2011WORK W/O A PERMIT: ERECTED 8'FT HIGH CONSTRUCTION FENCE UNDER JOB #402566709 EXPIRED 2-21-08,VACANT LOT,NO WORK,NO ACTIVITY AT TIME OF INSPECTION. REMEDY: OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITNothing owed — awaiting certificate of correction
ECB08/24/2011JOBSITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION: UNDER JOB #402566709 EXPIRED 2-21-08,CONSTRUCTION FENCE LEANING OVER,6'FT STOCKADE FENCE BEING USED,SECURE/MAKE FENCE PLUM 8'FT HIGH AT ALL EXPOSURES.Nothing owed — awaiting certificate of correction
ECB10/18/2008JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUB SECTION. NOTED: CONSTRUCTION WOODEN 8'HIGH FENCE IS MISSING A SECTION (4'X3')HIGH BOARD LOCATED AT THE REAR (EXPOSURE 3) LEAVING SITE OPEN. REMEDY: REPAIR AND/ORNothing owed — awaiting certificate of correction
ECB06/17/2008FAILURE TO COMPLY WITH SAFETY REQUIREMENTS DURING BUILDING OPERATIONS.NOTED: CONSTRUCTION SITE UNDER JOB NO.# 402566709 IS OPEN AND UNGUARDED WITH FENCE AT REAR APPROX. 8'LONG COLLAPSE AND FALLEN ONTO PUBLICNothing owed — awaiting certificate of correction
ECB06/11/2008WORK W/O A PERMIT EXP PERMIT AT TIME OF INSPECTION PERMIT FN402566709 HAS EXP AS OF 2/21/08 FOR THE JOB SITE FENCE REMEDY: RENEW PERMITNothing owed — awaiting certificate of correction
ECB06/11/2008JOB SITE FENCE DEFECTIVE AT TIME OF INSPECTION A SECTION OF JOB SITE FENCE APPROX 8FT IS DOWN AT REAR OF PROPERTY ALLOWING UNAUTHORIZED ACCESS INTO SITE WORK AT SITE IS BEING EXECUTED UNDER FENCE PERMIT 4025667Nothing owed — awaiting certificate of correction
ECB05/09/2008FAILURE TO POST CONTRACTORS SIGN JOB NO 402566709 NB NOTED NO CONTRACTORS SIGN POSTED AT JOB SITE AT TIME OF INSPECTION REMEDY: POST CONTRACTORS SIGN AT SITENothing owed — awaiting certificate of correction
ECB05/09/2008DEFECTIVE JOB SITE FENCE NOTED 8 HIGH WOOD CONSTRUCTION FENCE INSTALLED UNDER JOB NO 402566709 IS DEFECTIVE WITH SECTION APPROX 8X8 COLLAPSED AND FALLEN ONTO PUBLIC SIDEWALK COMMUNITY DRIVE REMEDY: STOP ALLNothing owed — awaiting certificate of correction
ECB05/09/2008FAILURE TO COMPLY WITH SAFETY REQUIREMENTS DURING BLDG OPERATIONS NOTED CONSTRUCTION SITE UNDER JOB NO 402566709 IS OPEN AND UNGUARDED WITH FENCE AT REAR OPEN ALLOW UNAUTHORIZED ACCESS TO SITE WITH EXCAVATIONNothing owed — awaiting certificate of correction
ECB05/09/2008FAILURE TO POST PERMITS FOR WORK AT PREMISES JOB NO 402566709NB PERMITS FOR NB AND FN NOT POSTED AT SITE AT TIME OF INSPECTION REMEDY: POST PERMITS FOR WORK AT PREMISESNothing owed — awaiting certificate of correction
ECB01/08/2008FAILURE TO POST CONTRACTOR SIGN JOB 402566709NB NOTED NO CONTRACTOR SIGN POSTED AT JOB SITE 3 MEN WORKING DIGGING OUT FOUNDATION REMEDY: PROVIDE AND POST CONTRACTORS SIGN AT SITENothing owed — awaiting certificate of correction
ECB01/08/2008FAILURE TO POST PERMITS FOR WORK AT PREMISES JOB 402566709NB PERMITS FOR BOTH (NB) AND FN NOT POSTED AT SITE REMEDY: POST PERMITS FOR WORK AT JOB SITENothing owed — awaiting certificate of correction
ECB01/08/2008FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECTION JOB 402566709NB NOTED OBSERVED 3 MEN WORKING WITH EXCAVATIOR MACHINE DIGGING OUT NB FOUNDATION AREA REMEDY: STOP ALL WORK IMMEDIATELY BACKNothing owed — awaiting certificate of correction
ECB01/08/2008FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION OPERATION JOB 402566709NB NOTED OBSERVED 3 MEN AND MACHINE DIGGING OUT FOUNDATION AREA AND UNDERMINNING 135-24 223 ST FOUNDATION FOOTING BY APPROX 12"Nothing owed — awaiting certificate of correction