← Back
Elevator apt, semi-fireproof without stores
135-26 HOOVER AVENUE
QUEENS · Jamaica Hills-Briarwood · BIN 4206536
💬 Discuss this project
1952Year Built
6Stories
D1Building Class
R6AZoning
64,248 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized37 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: CANTERBURY REALTY ASSOC · 35,400 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentCivilGeneral
Roof11p · 2 filings · 20 docs
Floor 64p · 1 filing · 2 docs
Floor 54p · 1 filing · 2 docs
Floor 44p · 1 filing · 2 docs
Floor 34p · 1 filing · 2 docs
Floor 24p · 1 filing · 2 docs
Floor 15p · 2 filings · 20 docs
Site & exterior10p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARGO REAL ESTATE1307/08/2026
CANTERBURY REALTY303/22/2026
MANCHESTER REALTY ASSOC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN A. GOMEZ403/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BRIDGE CORPGeneral Contractor907/08/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor807/08/2026
CENTRAL AIR CONDITIONINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034103/01/2024
RAND ENGINEERING & ARCHIT266203/01/2024
Building Lifecycle
All (116)Filed (5)Permit Issued (11)Signed Off (2)Facade (FISP) (18)Violation (60)Special Inspection (20)
09/07/2026
Violation issued (HPD, open)
C
08/06/2026
Violation issued (HPD, open)
C
07/14/2026
Violation issued (HPD, open)
A
10/04/2025
Violation issued (FDNY_NOV, closed)
07/15/2025
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00295893-I1
08/16/2024
Cycle 9 facade report signed — SAFE
08/09/2024
Cycle 9 facade report signed — SAFE
07/16/2024
Permit issued — Mechanical Systems
Q00504666-S1-MS
06/21/2024
Cycle 9 facade report submitted
06/21/2024
Cycle 9 facade report submitted
06/07/2024
Cycle 9 facade inspection completed
06/07/2024
Cycle 9 facade inspection completed
06/02/2024
Violation issued (HPD, closed)
C
06/02/2024
Violation issued (HPD, closed)
C
05/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
Peter Varsalona
05/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
Peter Varsalona
05/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Peter Varsalona
03/01/2024
Filed — Alteration
Mechanical work related to Replacement of Rooftop Exhaust Fans. No change to use, egress or occupancy.
Q00504666-S1
02/22/2024
Special inspection requirement — Electrical motors and elevators
Peter Varsalona
02/22/2024
Special inspection requirement — Final
Peter Varsalona
02/22/2024
Special inspection requirement — Maintenance information
Peter Varsalona
02/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Peter Varsalona
02/22/2024
Special inspection requirement — Mechanical Systems
Peter Varsalona
02/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
01/24/2024
Permit issued — Structural
Q00504666-I1-GC-CX
01/03/2024
Permit issued — Sidewalk Shed
Q00295893-I1-SH
12/05/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00676747-I1
05/06/2023
Violation issued (HPD, open)
B
05/06/2023
Violation issued (HPD, open)
B
04/03/2023
Violation issued (ECB, closed)
Elevators
02/06/2023
Permit issued — Supported Scaffold
Q00676747-I1-SF
01/30/2023
Permit issued — Sidewalk Shed
Q00295893-I1-SH
01/26/2023
Permit issued — Structural
Q00504666-I1-GC-CX
06/19/2022
Violation issued (HPD, closed)
C
06/01/2022
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00295893-P1
05/11/2022
Violation issued (HPD, open)
B
05/11/2022
Violation issued (HPD, open)
A
05/11/2022
Violation issued (HPD, open)
C
05/11/2022
Violation issued (HPD, closed)
A
05/11/2022
Violation issued (HPD, open)
C
05/11/2022
Violation issued (HPD, open)
A
03/09/2022
Permit issued — Structural
Q00504666-I1-GC-CX
02/25/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00676747-I1
02/25/2022
Permit issued — Supported Scaffold
Q00676747-I1-SF
01/06/2022
Permit issued — Sidewalk Shed
Q00295893-I1-SH
09/27/2021
Filed — Alteration
Mechanical work related to Replacement of Rooftop Exhaust Fans. No change to use, egress or occupancy.
Q00504666-I1
09/27/2021
Special inspection requirement — Fenestration areas
John Monroe
09/27/2021
Special inspection requirement — Energy Code Compliance Inspections
John Monroe
09/27/2021
Special inspection requirement — Fenestration air leakage
John Monroe
09/27/2021
Special inspection requirement — Air barrier - visual inspection
John Monroe
09/27/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
John Monroe
09/27/2021
Special inspection requirement — Insulation placement and R values
John Monroe
09/08/2021
Cycle 9 facade report submitted
09/08/2021
Cycle 9 facade report submitted
09/07/2021
Cycle 9 facade report signed — UNSAFE
09/07/2021
Cycle 9 facade report signed — UNSAFE
08/13/2021
Cycle 9 facade inspection completed
08/13/2021
Cycle 9 facade inspection completed
07/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCENTRAL AIR CONDITIONING07/16/2024
DOB NOWStructuralPermit IssuedLAWRENCE EXTERIOR RESTORA01/24/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/03/2024
DOB NOWSupported ScaffoldSigned-offLAWRENCE EXTERIOR RESTORA02/06/2023
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/30/2023
DOB NOWStructuralPermit IssuedLAWRENCE EXTERIOR RESTORA01/26/2023
DOB NOWStructuralPermit IssuedLAWRENCE EXTERIOR RESTORA03/09/2022
DOB NOWSupported ScaffoldSigned-offLAWRENCE EXTERIOR RESTORA02/25/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/06/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/07/2021
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/15/2020
BISOTISSUEDABILENE INC11/09/2004
BISEQISSUEDM.B WATERPROOFING03/03/1998
BISOTISSUEDM.B WATERPROOFING03/03/1998
BISFSISSUEDABILENE, INC07/19/1996
BISPLISSUEDBELL FUEL OIL, LLC07/19/1996
1 project · most recent 03/01/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/01/2024Permit IssuedCENTRAL AIR CONDITIONINGVentilation Systems
Ventilation
Greenheck GB-330-VG-20 11,000 CFM · Exhaust Fan ×4
2 projects · most recent 03/13/2024
General Wiring
FiledStatusContractorScope
03/13/2024CompleteBELMONT ELECTRICAL, INCGeneral Wiring
01/08/2020CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 03/01/2024
Concrete
FiledStatusContractorScope
03/01/2024Permit IssuedCENTRAL AIR CONDITIONINGConcrete
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/28/2024HVAC-R and service water heating equipmentPeter Varsalonaenergy_progress
05/28/2024HVAC-R and service water heating system controlsPeter Varsalonaenergy_progress
05/28/2024HVAC-R and service water piping design and insulationPeter Varsalonaenergy_progress
02/22/2024Electrical motors and elevatorsPeter Varsalonaenergy_progress
02/22/2024FinalPeter Varsalonaprogress
02/22/2024Maintenance informationPeter Varsalonaenergy_progress
02/22/2024Energy Code Compliance InspectionsPeter Varsalonaprogress
02/22/2024Mechanical SystemsPeter Varsalonaspecial
02/22/2024Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
09/27/2021Fenestration areasJohn Monroeenergy_progress
09/27/2021Energy Code Compliance InspectionsJohn Monroeprogress
09/27/2021Fenestration air leakageJohn Monroeenergy_progress
09/27/2021Air barrier - visual inspectionJohn Monroeenergy_progress
09/27/2021Fenestration and door U-factor and product ratingsJohn Monroeenergy_progress
09/27/2021Insulation placement and R valuesJohn Monroeenergy_progress
04/15/2021Structural Stability – Alterations of existing buildingsJohn Monroespecial
04/15/2021FinalJohn Monroeprogress
04/15/2021Structural Steel - High Strength BoltingJohn Monroespecial
04/15/2021Post-installed AnchorsJohn Monroespecial
04/15/2021MasonryJohn Monroespecial
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/26/2026Q00676747-I1Request digital key ↗
08/23/2026Q00504666-P1Request digital key ↗
08/23/2026Q00504666-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026Q00295893-P1Request digital key ↗
08/26/2026Q00295893-I1Request digital key ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026Q00504666-S1Open ↗
08/31/2026Q00504666-S1Open ↗
08/31/2026Q00504666-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00676747-I1Open ↗
08/26/2026Q00295893-P1Open ↗
08/26/2026Q00295893-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q00504666-S1Open ↗
08/31/2026Q00504666-S1Open ↗
08/31/2026Q00504666-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026Q00295893-I1Open ↗
08/13/2026Q00295893-P1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWDEP Variance (V5) letter2
08/23/2026Q00504666-S1Open ↗
08/23/2026Q00504666-I1Open ↗
▸Other Documents1
▸DOB NOWDHCR Document1
08/13/2026Q00295893-I1Open ↗