Two stories - detached, small or mid-size
135-32 95 STREET
QUEENS · Ozone Park · BIN 4248427
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R4AZoning
1,036 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR110/10/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281110/10/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
09/22/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 10 Panels, 4.1 kW
Q01122321-I1
10/17/2024
Permit issued — Solar
Q01122321-I1-SL
10/10/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 10 Panels, 4.1 kW
Q01122321-I1
10/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
10/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
10/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
10/04/2024
Special inspection requirement — Final
Mina Makar
10/04/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR10/17/2024
1 project · most recent 10/04/2024
FiledStatusContractorScope
10/04/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/04/2024Fire-Resistant Penetrations and JointsMina Makarspecial
10/04/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
10/04/2024Energy Code Compliance InspectionsMina Makarprogress
10/04/2024FinalMina Makarprogress
10/04/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01122321-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q01122321-I1Open ↗
08/26/2026Q01122321-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01122321-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01122321-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01122321-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01122321-I1Open ↗