← Back
Two family converted from one family
135-35 232 STREET
QUEENS · BIN 4282928
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3AZoning
1,322 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family converted from one family · Owner of record: RAI REAL ESTATE HOLDINGS INC · 3,142 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 19 docs
Cellar3p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RAI REAL ESTATE HOLDINGS INC2207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/24/2021$390K—Private party → RAI REAL ESTATE HOLDINGS INC$295/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC808/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUSTOMBUILT HOMES INCGeneral Contractor207/08/2026
AJIT ONE MECH&GEN'L CONTRPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NASIR J. KHANZADA LLC1527808/06/2024
Building Lifecycle
All (81)Filed (8)Permit Issued (4)Signed Off (2)Violation (29)Inspection (9)Objection (16)Special Inspection (13)
11/25/2025
Violation issued (HPD, open)
I
04/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/06/2024
Signed off — Alteration
SUBSEQUENT FILING TO RENOVATE THE CELLAR WITH 2 PIECE BATHROOM AND COMBI BOILER AND RECONNECT THE GAS CONNECTION.
Q00577369-S1
09/04/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
08/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
08/14/2024
Objection resolved — Addressed
08/13/2024
Objection raised — Scope
08/06/2024
Filed — Alteration
SUBSEQUENT FILING TO RENOVATE THE CELLAR WITH 2 PIECE BATHROOM AND COMBI BOILER AND RECONNECT THE GAS CONNECTION.
Q00577369-P2
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
08/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
08/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
07/31/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/11/2024
Objection resolved — Addressed
07/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
07/09/2024
Objection raised — Other
07/01/2024
Filed — Alteration
PLUMBING FILING IN CONJUNCTIONWITH ALT-1 FILING FOR MINOR INTERIOR RENOVATION ON SECOND FLOOR TO RESOLVE VIOLATION # 35409632JDOB NOW JOB NO. Q00577369-I1
Q00676312-P3
07/01/2024
Filed — Alteration
SUBSEQUENT FILING TO RENOVATE THE CELLAR WITH 2 PIECE BATHROOM AND COMBI BOILER AND RECONNECT THE GAS CONNECTION.
Q00577369-P1
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
07/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
07/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
06/27/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/21/2024
Permit issued — Plumbing
Q00676312-I1-PL
06/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/12/2024
Filed — Alteration
PLUMBING FILING IN CONJUNCTIONWITH ALT-1 FILING FOR MINOR INTERIOR RENOVATION ON SECOND FLOOR TO RESOLVE VIOLATION # 35409632JDOB NOW JOB NO. Q00577369-I1
Q00676312-P2
03/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
02/23/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/12/2024
Signed off — Alteration
SUBSEQUENT FILING TO RENOVATE THE CELLAR WITH 2 PIECE BATHROOM AND COMBI BOILER AND RECONNECT THE GAS CONNECTION.
Q00577369-I1
11/29/2023
Violation issued (HPD, closed)
I
04/04/2023
Permit issued — General Construction
Q00577369-S1-GC
02/24/2023
Objection resolved — Addressed
02/13/2023
Objection raised — Scope
02/10/2023
Filed — Alteration
SUBSEQUENT FILING TO RENOVATE THE CELLAR WITH 2 PIECE BATHROOM AND COMBI BOILER AND RECONNECT THE GAS CONNECTION.
Q00577369-S1
02/09/2023
Permit issued — Plumbing
Q00676312-I1-PL
02/08/2023
Violation issued (HPD, closed)
C
02/08/2023
Violation issued (HPD, closed)
C
01/17/2023
Objection resolved — Addressed
01/13/2023
Objection resolved — Addressed
01/13/2023
Objection resolved — Addressed
01/10/2023
Objection raised — Scope
01/10/2023
Objection raised — Scope
01/10/2023
Objection raised — Other
01/06/2023
Filed — Alteration
PLUMBING FILING IN CONJUNCTIONWITH ALT-1 FILING FOR MINOR INTERIOR RENOVATION ON SECOND FLOOR TO RESOLVE VIOLATION # 35409632JDOB NOW JOB NO. Q00577369-I1
Q00676312-P1
12/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
12/14/2022
Violation issued (HPD, closed)
C
12/14/2022
Violation issued (HPD, closed)
B
12/14/2022
Violation issued (HPD, closed)
C
12/14/2022
Violation issued (HPD, closed)
B
12/14/2022
Violation issued (HPD, closed)
C
12/14/2022
Violation issued (HPD, closed)
C
11/18/2022
Violation issued (HPD, closed)
I
02/11/2022
Filed — Alteration
PLUMBING FILING IN CONJUNCTIONWITH ALT-1 FILING FOR MINOR INTERIOR RENOVATION ON SECOND FLOOR TO RESOLVE VIOLATION # 35409632JDOB NOW JOB NO. Q00577369-I1
Q00676312-I1
02/04/2022
Violation issued (HPD, closed)
C
02/04/2022
Violation issued (HPD, closed)
B
02/04/2022
Violation issued (HPD, closed)
B
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHAR JI PLUMBING& HEAT COR06/21/2024
DOB NOWGeneral ConstructionSigned-offCUSTOMBUILT HOMES INC04/04/2023
DOB NOWPlumbingSigned-offHAR JI PLUMBING& HEAT COR02/09/2023
DOB NOWGeneral ConstructionSigned-offCUSTOMBUILT HOMES INC12/22/2021
1 project · most recent 07/01/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/01/2024Signed-offAJIT ONE MECH&GEN'L CONTRGas, Water/Sanitary
1 project · most recent 01/26/2022
General Wiring
FiledStatusContractorScope
01/26/2022Permit IssuedSCOTT ELEC'L SERVICE, LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/04/2024Pass-Final General Construction Non-Directive 14PassView ↗
07/31/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/27/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/23/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/23/2024Fire-Resistance Rated ConstructionNasir Khanzadaprogress
08/23/2024Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
08/23/2024Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
08/05/2024Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
08/05/2024Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
08/05/2024Fire-Resistance Rated ConstructionNasir Khanzadaprogress
07/10/2024Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
07/01/2024Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
07/01/2024Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
07/01/2024Fire-Resistance Rated ConstructionNasir Khanzadaprogress
07/01/2024Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
03/12/2024Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
12/27/2022Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026Q00676312-P1Request digital key ↗
08/22/2026Q00676312-I1Request digital key ↗
08/22/2026Q00676312-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026Q00577369-P2Open ↗
08/22/2026Q00577369-P1Open ↗
08/22/2026Q00577369-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026Q00676312-I1Open ↗
08/26/2026Q00676312-P1Open ↗
08/25/2026Q00577369-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q00577369-P1Open ↗
08/23/2026Q00577369-P2Open ↗
08/23/2026Q00577369-S1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026Q00676312-P1Open ↗
08/22/2026Q00676312-I1Open ↗
08/22/2026Q00676312-P3Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00577369-I1Open ↗