Multi-story retail building (2+)
135-36 40 ROAD
QUEENS · BIN 4114142
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
C4-2Zoning
6,833 sfGross Floor Area
3Units
2 Open Violations ▸
Multi-story retail building (2+) · Owner of record: LAWLIN REALTY, LLC · 2,730 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction61p · 4 filings · 20 docs
Floor 2Under Construction67p · 3 filings · 20 docs
Floor 1Under Construction7p · 3 filings · 20 docs
CellarUnder Construction78p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WELLS FARGO709/13/2026
LAWLING REALTY LLC14607/08/2026
NEVINS ASSOCIATES2307/08/2026
AWLIN REALTY LLC103/22/2026
RIDGE CONSTRUCTION703/22/2026
LAWNIN REALTY LLC103/22/2026
LANLIN REALTY LLC103/22/2026
OWNER OF THE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.3603/21/2026
NATIONAL SIGN AND LIGHTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIDGE CONSTRUCTION CORPGeneral Contractor2307/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor2103/21/2026
MC SUPERSTRUCTURE INCGeneral Contractor1409/19/2026
NATIONAL MAINTENANCEScaffold607/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor507/08/2026
RRP PLUMBING CORPPlumbing407/08/2026
R.W. DAKE & CO.,INCGeneral Contractor409/07/2026
RRP PLUMBING CORPFire Protection307/08/2026
M&T PLBG AND HTG CO., INCPlumbing209/12/2026
DOUBLE 'R' ELEC'L CONTR'GElectrical103/22/2026
DEYI LINGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SAG ENGINEERING & CONSULT608608/04/2026
METRIC CONSULTING AND INS1803701/30/2026
CATALPA SPECIAL INSPECTIO2004701/07/2026
LANGAN ENG, ENV, SURVEYIN1265212/05/2025
MEP INSPECTIONS, INC1102305/15/2025
Building Lifecycle
All (194)Filed (40)Permit Issued (56)Signed Off (11)Violation (50)Inspection (3)Objection (4)Special Inspection (30)
09/18/2026
Permit issued — Sidewalk Shed
Q01461144-I1-SF
09/18/2026
Permit issued — Supported Scaffold
Q01461144-I1-SH
09/15/2026
Objection raised — Cost
09/15/2026
Objection raised — Admin
09/15/2026
Objection raised — Scope
09/15/2026
Objection raised — Fire_Protection
09/10/2026
Permit issued — Plumbing
Q01406474-S2-PL
09/10/2026
Permit issued — Plumbing
Q01421118-S2-PL
09/01/2026
Permit issued — General Construction
Q01421118-I1-GC
09/01/2026
Permit issued — Mechanical Systems
Q01421118-S1-MS
09/01/2026
Permit issued — Foundation
Q01421118-S4-GC-CX
09/01/2026
Permit issued — General Construction
Q01406474-I1-GC
09/01/2026
Permit issued — Structural
Q01406474-S1-ST
08/04/2026
Filed — Alteration
Installation of new exterior canopy with storm drain piping
Q01406474-S2
08/04/2026
Filed — Alteration
Construction of new reinforced concrete foundation elements, including footings and foundation walls, to support the proposed structural modifications
Q01421118-S2
08/04/2026
Filed — Alteration
Construction of new reinforced concrete foundation elements, including footings and foundation walls, to support the proposed structural modifications
Q01421118-S1
08/03/2026
Filed — Alteration
Construction of new reinforced concrete foundation elements, including footings and foundation walls, to support the proposed structural modifications
Q01421118-S4
08/03/2026
Filed — Alteration
Construction of new reinforced concrete foundation elements, including footings and foundation walls, to support the proposed structural modifications
Q01421118-I1
07/30/2026
Filed — Alteration CO
INTERIOR RENOVATION OF EXISTING 2 STORY BUILDING + CELLAR FOR BUSINESSSOCCUPANCY. SCOPE INCLUDES, NEW ENCLOSED EGRESS STAIR SERVING ALL LEVELS,NEW LULA LIFT SERVING ALL LEVELS, ROOF PATCHING AND REPAIRING, PARTIALEXTERIOR ENVELOPE INFILL AND FENESTRATION
Q01425374-I1
07/30/2026
Special inspection requirement — Sprayed fire-resistant materials
Chester Kowalski
07/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chester Kowalski
07/28/2026
Filed — Alteration
Installation of new exterior canopy with storm drain piping
Q01406474-S1
07/24/2026
Filed — Alteration
Installation of new exterior canopy with storm drain piping
Q01406474-I1
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Chester Kowalski
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Chester Kowalski
07/22/2026
Special inspection requirement — Maintenance information
Chester Kowalski
07/21/2026
Special inspection requirement — Final
Stephen Furnstahl
07/21/2026
Special inspection requirement — Final
Stephen Furnstahl
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chester Kowalski
07/07/2026
Special inspection requirement — Air barrier — testing
Chester Kowalski
07/07/2026
Special inspection requirement — Fenestration air leakage
Chester Kowalski
07/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Chester Kowalski
07/07/2026
Special inspection requirement — Air barrier — testing
Chester Kowalski
07/07/2026
Special inspection requirement — Insulation placement and R values
Chester Kowalski
07/07/2026
Special inspection requirement — Air barrier - visual inspection
Chester Kowalski
07/07/2026
Special inspection requirement — Structural Steel - Welding
Chester Kowalski
07/07/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Chester Kowalski
07/07/2026
Special inspection requirement — Fenestration areas
Chester Kowalski
07/07/2026
Special inspection requirement — Structural Cold-Formed Steel
Chester Kowalski
07/07/2026
Special inspection requirement — Structural Steel - Details
Chester Kowalski
07/07/2026
Special inspection requirement — Fenestration air leakage
Chester Kowalski
07/07/2026
Special inspection requirement — Fenestration areas
Chester Kowalski
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Chester Kowalski
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
07/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Chester Kowalski
06/24/2026
Special inspection requirement — Final
Chester Kowalski
06/24/2026
Special inspection requirement — Footing and Foundation
Chester Kowalski
06/24/2026
Special inspection requirement — Structural Cold-Formed Steel
Chester Kowalski
06/24/2026
Special inspection requirement — Structural Steel - Details
Chester Kowalski
06/24/2026
Special inspection requirement — Masonry
Chester Kowalski
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chester Kowalski
04/20/2026
Signed off — Alteration
Erect temporary construction fence 3 feet from property line.
Q00242127-I1
02/23/2026
Signed off — Alteration
Installation of plumbing fixtures for retail space.
Q00241460-I1
02/03/2026
Signed off — Alteration
Installation of bracing related to partial demo and construction filed under #440612259. Filed in conjunction with ST Q00242103.
Q00453031-I1
01/30/2026
Filed — Alteration
Installation of bracing related to partial demo and construction filed under #440612259. Filed in conjunction with ST Q00242103.
Q00453031-P3
01/26/2026
Signed off — Alteration
Installation of new sprinkler system with related sprinkler heads and piping, connect to existing fire service.
Q00459813-I1
01/12/2026
Filed — Alteration
INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01333983-P1
01/07/2026
Filed — Alteration
Installation of plumbing fixtures for retail space.
Q00241460-P3
12/19/2025
Signed off — Alteration
Installation of mechanical HVAC equipment and ductwork. Duct and equipment installed for new gas furnace.
Q00240689-I1
12/19/2025
Permit issued — Protection and Mechanical Methods
Q01333983-I1-PMM
Latest 60 of 194 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC09/18/2026
DOB NOWSupported ScaffoldPermit IssuedMC SUPERSTRUCTURE INC09/18/2026
DOB NOWPlumbingPermit IssuedM&T PLBG AND HTG CO., INC09/10/2026
DOB NOWPlumbingPermit IssuedM&T PLBG AND HTG CO., INC09/10/2026
DOB NOWGeneral ConstructionPermit IssuedR.W. DAKE & CO.,INC09/01/2026
DOB NOWMechanical SystemsPermit IssuedR.W. DAKE & CO.,INC09/01/2026
DOB NOWFoundationPermit IssuedR.W. DAKE & CO.,INC09/01/2026
DOB NOWGeneral ConstructionPermit IssuedR.W. DAKE & CO.,INC09/01/2026
DOB NOWStructuralPermit IssuedR.W. DAKE & CO.,INC09/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMC SUPERSTRUCTURE INC12/19/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP10/09/2025
DOB NOWStructuralSigned-offRIDGE CONSTRUCTION CORP08/14/2025
DOB NOWMechanical SystemsSigned-offRIDGE CONSTRUCTION CORP08/14/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/08/2025
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/08/2025
DOB NOWConstruction FenceSigned-offRIDGE CONSTRUCTION CORP05/20/2025
DOB NOWSupport of ExcavationSigned-offRIDGE CONSTRUCTION CORP09/23/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC08/09/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC08/05/2024
DOB NOWPlumbingSigned-offRRP PLUMBING CORP07/29/2024
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.07/29/2024
DOB NOWStructuralSigned-offRIDGE CONSTRUCTION CORP07/10/2024
DOB NOWMechanical SystemsSigned-offRIDGE CONSTRUCTION CORP06/24/2024
DOB NOWConstruction FenceSigned-offRIDGE CONSTRUCTION CORP04/05/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC09/01/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC09/01/2023
DOB NOWConstruction FenceSigned-offRIDGE CONSTRUCTION CORP03/30/2023
DOB NOWConstruction FenceSigned-offRIDGE CONSTRUCTION CORP05/18/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/15/2022
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING04/15/2022
DOB NOWSupport of ExcavationSigned-offRIDGE CONSTRUCTION CORP03/28/2022
DOB NOWMechanical SystemsSigned-offRIDGE CONSTRUCTION CORP03/25/2022
DOB NOWStructuralSigned-offRIDGE CONSTRUCTION CORP03/25/2022
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.03/11/2022
DOB NOWPlumbingSigned-offRRP PLUMBING CORP03/11/2022
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.08/11/2021
DOB NOWConstruction FenceSigned-offRIDGE CONSTRUCTION CORP05/07/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING03/31/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING03/31/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING03/31/2021
+ 47 more permits on file
1 project · most recent 08/04/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2026Permit IssuedR.W. DAKE & CO.,INCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Mitsubishi Electric TRUZA0121 12,000 BTU · Split System ×2
Trane 5TEM4D04AC31 47,400 BTU · Fan Coil Indoor ×1
Heating
Trane 5TWA4036A 36,000 BTU · Condensing Unit ×1
2 projects · most recent 08/04/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/04/2026Permit IssuedM&T PLBG AND HTG CO., INCStorm
08/04/2026Permit IssuedM&T PLBG AND HTG CO., INCWater/Sanitary
14 projects · most recent 09/21/2026
General Wiring
FiledStatusContractorScope
09/21/2026Permit IssuedSRM ELECTRICAL SVC INCGeneral Wiring
12/23/2025Permit IssuedSOLAS ELECTRICAL CORP—
11/04/2025CompleteLEBO ELECTRIC LLCGeneral Wiring
01/17/2025CompleteLEBO ELECTRIC LLC—
08/29/2023CompleteNASH ELECTRIC SERVICES IN—
03/10/2022Permit IssuedL&B ELEC'L INTERNATIONALGeneral Wiring
10/02/2019Permit IssuedNATIONAL MAINT. INC—
10/02/2019Permit IssuedNATIONAL MAINT. INC—
10/02/2019Permit IssuedNATIONAL MAINT. INC—
10/02/2019Permit IssuedNATIONAL MAINT. INC—
10/02/2019Permit IssuedNATIONAL MAINT. INC—
10/02/2019Permit IssuedNATIONAL MAINT. INC—
05/16/2018Permit IssuedDOUBLE "R" ELEC'L CONTR'G—
02/08/2018CancelledKJK ELECTRIC INCGeneral Wiring
2 projects · most recent 08/04/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/04/2026Permit IssuedM&T PLBG AND HTG CO., INCSteel, Concrete
08/04/2026Permit IssuedM&T PLBG AND HTG CO., INCSteel, Concrete, Masonry
1 project · most recent 03/12/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/12/2025Signed-offMC SUPERSTRUCTURE INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
07/30/2026Sprayed fire-resistant materialsChester Kowalskispecial
07/29/2026Structural Stability – Alterations of existing buildingsChester Kowalskispecial
07/22/2026HVAC-R and service water heating equipmentChester Kowalskienergy_progress
07/22/2026Maintenance informationChester Kowalskienergy_progress
07/22/2026HVAC-R and service water heating system controlsChester Kowalskienergy_progress
07/21/2026FinalStephen Furnstahlprogress
07/21/2026FinalStephen Furnstahlprogress
07/21/2026Structural Stability – Alterations of existing buildingsChester Kowalskispecial
07/07/2026Air barrier — testing Chester Kowalskienergy_progress
07/07/2026Air barrier - visual inspectionChester Kowalskienergy_progress
07/07/2026Fenestration air leakageChester Kowalskienergy_progress
07/07/2026Structural Steel - WeldingChester Kowalskispecial
07/07/2026Structural Steel - DetailsChester Kowalskispecial
07/07/2026Structural Cold-Formed SteelChester Kowalskispecial
07/07/2026Fenestration air leakageChester Kowalskienergy_progress
07/07/2026Fenestration areasChester Kowalskienergy_progress
07/07/2026Fenestration and door U-factor and product ratingsChester Kowalskienergy_progress
07/07/2026Insulation placement and R valuesChester Kowalskienergy_progress
07/07/2026Fenestration areasChester Kowalskienergy_progress
07/07/2026Air barrier — testing Chester Kowalskienergy_progress
07/07/2026Structural Steel - High Strength BoltingChester Kowalskispecial
07/01/2026Fire-Resistant Penetrations and JointsChester Kowalskispecial
07/01/2026Energy Code Compliance InspectionsChester Kowalskiprogress
07/01/2026Fire-Resistance Rated ConstructionChester Kowalskiprogress
06/24/2026Structural Steel - DetailsChester Kowalskispecial
Latest 25 of 98.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Wf BranchOfficeCellar, Floors 1, 2
Project Q01425374 Alteration CO · Plan Examiner Review · 07/30/2026
Project Q01406474 Alteration · Approved · 07/24/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 407 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch10
08/17/2026Q01333983-P1Request digital key ↗
08/17/2026Q01333983-I1Request digital key ↗
08/16/2026Q01406474-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sign6
08/28/2026Q00208706-I1Request digital key ↗
08/28/2026Q00211117-I1Request digital key ↗
08/28/2026Q00208707-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Support of Excavation4
08/21/2026Q00453031-P3Request digital key ↗
08/21/2026Q00453031-P2Request digital key ↗
08/21/2026Q00453031-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/17/2026Q00241460-I1Request digital key ↗
08/17/2026Q00241460-P2Request digital key ↗
08/17/2026Q00241460-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
08/27/2026Q00430347-I1Request digital key ↗
08/20/2026Q00443757-I1Request digital key ↗
08/20/2026Q00443757-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
08/27/2026Q00430349-I1Request digital key ↗
08/20/2026Q00443757-I1Request digital key ↗
08/20/2026Q00443757-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
08/22/2026Q00242103-P2Request digital key ↗
08/22/2026Q00242103-P1Request digital key ↗
08/22/2026Q00242103-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/22/2026Q00240689-P1Request digital key ↗
08/22/2026Q00240689-P2Request digital key ↗
08/22/2026Q00240689-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/27/2026Q00459813-I1Request digital key ↗
08/27/2026Q00459813-P2Request digital key ↗
08/15/2026Q00459813-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/27/2026Q00430344-I1Request digital key ↗
08/27/2026Q00242127-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION34
02/27/2026440612259Open ↗
02/11/2026440612259Open ↗
01/07/2026440612259Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION17
05/12/2025440612259Open ↗
04/25/2025440612259Open ↗
04/22/2025440612259Open ↗
Showing 3 of 17 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
11/09/2020440612259Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/11/2019421474700Open ↗
▸Seals & Professional Certifications164
▸DOB NOWSpecial Inspector Seal & Signature61
09/26/2026Q00453031-P1Open ↗
09/26/2026Q00453031-P1Open ↗
09/26/2026Q00453031-P1Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
08/28/2026Q00208706-I1Open ↗
08/28/2026Q00211107-I1Open ↗
08/27/2026Q00430349-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/02/2026Q01421118-I1Open ↗
09/02/2026Q01421118-I1Open ↗
09/01/2026Q01425374-I1Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
12/30/2019402461037Open ↗
07/30/2019421893366Open ↗
07/26/2019421893366Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
08/31/2020440612259Open ↗
02/21/2019421893366Open ↗
10/24/2017421474700Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/21/2019421893366Open ↗
10/24/2017421474700Open ↗
10/10/2014421040180Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/31/2020440612259Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/31/2020440612259Open ↗
▸Trade Schedules & Equipment23
▸BISEQUIPMENT USE PERMITS8
09/11/2009410219945Open ↗
09/11/2009410219945Open ↗
09/11/2009410219945Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
02/21/2019421893366Open ↗
06/11/2018421474700Open ↗
10/24/2017421474700Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
06/26/2013420470902Open ↗
05/30/2013420470902Open ↗
03/17/2012420470902Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
09/10/2009410219945Open ↗
09/10/2009410219945Open ↗
05/12/2009410219945Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
11/15/2013420470902Open ↗
08/06/2013420470902Open ↗
▸Safety & Tenant Protection4
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
11/09/2020440612259Open ↗
▸BISTenant Protection Plan and Notes1
02/21/2019421893366Open ↗
▸BISSTREET TREE CHECKLIST1
02/21/2019421893366Open ↗
▸DOB NOWStreet Tree Checklist1
08/16/2026Q01425374-I1Open ↗
▸Environmental & Asbestos29
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/28/2026Q00208706-I1Open ↗
08/28/2026Q00211107-I1Open ↗
08/21/2026Q00453031-P3Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
08/31/2020440612259Open ↗
02/21/2019421893366Open ↗
10/24/2017421474700Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/27/2026Q00459813-I1Open ↗
08/22/2026Q00240689-I1Open ↗
08/17/2026Q00241460-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/28/2021440612259Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
07/30/2019421893366Open ↗
07/29/2019421893366Open ↗
02/21/2019421893366Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/11/2026440612259Open ↗
11/09/2020440612259Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
02/11/2019421474700Open ↗
10/25/2013420884047Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/03/2026440612259Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/30/2011420470902Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/31/2020440612259Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00240689-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
02/10/2026440612259Open ↗
02/10/2026440612259Open ↗
02/03/2026440612259Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/01/2019421893366Open ↗
07/29/2019421893366Open ↗
02/11/2019421474700Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
10/24/2017421474700Open ↗
09/13/2013420884047Open ↗
08/15/2011420470902Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
03/23/2020402461037Open ↗
03/14/2020402461037Open ↗
12/30/2019402461037Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/08/2016420470902Open ↗
10/25/2013420884047Open ↗
09/10/2009410219945Open ↗
▸BISSUPERSEDING LETTER1
04/25/2025440612259Open ↗
▸BISFINAL1
02/11/2026440612259Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT13
08/31/2020440612259Open ↗
07/30/2019421893366Open ↗
07/26/2019421893366Open ↗
Showing 3 of 13 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
12/10/2025440612259Open ↗
04/25/2025440612259Open ↗
04/22/2025440612259Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION12
07/30/2025440612259Open ↗
01/28/2025440612259Open ↗
05/23/2024440612259Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET7
02/21/2019421893366Open ↗
11/15/2017421474700Open ↗
10/28/2016421385968Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
05/12/2025440612259Open ↗
04/25/2025440612259Open ↗
04/22/2025440612259Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/31/2020440612259Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00453031-P1Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/31/2020440612259Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00453031-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01425374-I1Open ↗