← Back
BuildNYC
Two stories - detached, small or mid-size
135-36 FRANCIS LEWIS BOULEVARD
QUEENS · Laurelton · BIN 4282840
💬 Discuss this project
1945Year Built
1.5Stories
A1Building Class
R3AZoning
1,250 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation3p · 1 filing · 9 docs
Floor 1Photovoltaic solar panel installation1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Evangelical Lutheran Church303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering112/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272112/17/2024
Building Lifecycle
03/03/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01154451-I1
12/23/2024
Permit issued — Solar
Q01154451-I1-SL
12/17/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01154451-I1
12/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service12/23/2024
1 project · most recent 12/17/2024
FiledStatusContractorScope
12/17/2024CompleteSunrun Solar Electl—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/11/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/11/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/11/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/11/2024FinalWalid Abdullaprogress
12/11/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account