Two family converted from one family
135-53 234 STREET
QUEENS · BIN 4283860
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3AZoning
1,352 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 3,142 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction8p · 1 filing · 20 docs
Floor 1
1 job · most recent 06/04/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/04/2026Permit IssuedMOKEN HOME IMPROVEMENTAir Conditioning Systems, Heating Systems
Cooling
Fujitsu A0U36RLXFZH 36,400 BTU · Heat Pump Outdoor ×1
AOU36RLXFZH 36,400 BTU · Heat Pump Outdoor ×1
Heating
Navien NCB-150E 56 BTU · Boiler ×2
1 job · most recent 06/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/04/2026Permit IssuedROCK E SMALL PLBG&HTG INCGas, Water/Sanitary
2 jobs · most recent 04/27/2025
General Wiring
FiledStatusContractorScope
04/27/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
03/03/2020CompleteBERGER QUALITY ELEC'L CON—
1 job · most recent 06/04/2026
Wood
FiledStatusContractorScope
06/04/2026Permit IssuedMOKEN HOME IMPROVEMENTWood
1 job · most recent 06/04/2026
Fence
FiledStatusContractorScope
06/04/2026Permit IssuedMOKEN HOME IMPROVEMENTFence
Building Lifecycle
All (100)Filed (8)Permit Issued (3)Violation (4)Inspection (9)Objection (46)Special Inspection (30)
08/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/20/2026
Special inspection requirement — Interior lighting power
Andrew Inga
07/20/2026
Special inspection requirement — Insulation placement and R values
Andrew Inga
07/20/2026
Special inspection requirement — Fenestration air leakage
Andrew Inga
07/20/2026
Special inspection requirement — Final
Andrew Inga
07/20/2026
Special inspection requirement — Structural Wood Frame
Andrew Inga
07/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
Andrew Inga
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Andrew Inga
07/20/2026
Special inspection requirement — Post-installed Anchors
CHRISTIAN LOZADA
07/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
07/20/2026
Special inspection requirement — Wood – Seismic Resistance
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTIAN LOZADA
07/20/2026
Special inspection requirement — Air barrier - visual inspection
Andrew Inga
07/20/2026
Special inspection requirement — Fenestration areas
Andrew Inga
07/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Andrew Inga
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
06/04/2026
Filed — Alteration
REAR AND FRONT EXTENSION OF AN EXISTING TWO FAMILY DWELLING AND THE INTERIOR RENOVATION OF THE EXISTING BUILDING. NO CHANGE TO USE.
Q01025529-P3
06/03/2026
Filed — Alteration
REAR AND FRONT EXTENSION OF AN EXISTING TWO FAMILY DWELLING AND THE INTERIOR RENOVATION OF THE EXISTING BUILDING. NO CHANGE TO USE.
Q01025529-P4
06/03/2026
Special inspection requirement — Wood – Seismic Resistance
05/21/2026
Special inspection requirement — Air barrier - visual inspection
Andrew Inga
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/21/2026
Special inspection requirement — Post-installed Anchors
CHRISTIAN LOZADA
05/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
05/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTIAN LOZADA
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Andrew Inga
05/21/2026
Special inspection requirement — Final
Andrew Inga
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Andrew Inga
05/21/2026
Special inspection requirement — Structural Wood Frame
Andrew Inga
05/21/2026
Special inspection requirement — Insulation placement and R values
Andrew Inga
05/21/2026
Special inspection requirement — Fenestration air leakage
Andrew Inga
05/21/2026
Special inspection requirement — Fenestration areas
Andrew Inga
04/16/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/10/2026
Inspection — No Access-Final PL - Underground
No Access
View inspection ↗
04/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2026
Objection resolved — Addressed
01/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2026
Objection raised — Scope
12/17/2025
Filed — Alteration
REAR AND FRONT EXTENSION OF AN EXISTING TWO FAMILY DWELLING AND THE INTERIOR RENOVATION OF THE EXISTING BUILDING. NO CHANGE TO USE.
Q01025529-P2
10/27/2025
Permit issued — Construction Fence
Q01025529-S3-FN
10/15/2025
Permit issued — Plumbing
Q01025529-S2-PL
09/26/2025
Permit issued — Structural
Q01025529-I1-GC-CX
08/30/2025
Filed — Alteration
REAR AND FRONT EXTENSION OF AN EXISTING TWO FAMILY DWELLING AND THE INTERIOR RENOVATION OF THE EXISTING BUILDING. NO CHANGE TO USE.
Q01025529-S3
07/31/2025
Objection resolved — Addressed
07/08/2025
Violation issued (ECB, closed)
Construction
07/07/2025
Violation issued (ECB, closed)
Construction
06/30/2025
Objection raised — Zoning
06/16/2025
Filed — Alteration
REAR AND FRONT EXTENSION OF AN EXISTING TWO FAMILY DWELLING AND THE INTERIOR RENOVATION OF THE EXISTING BUILDING. NO CHANGE TO USE.
Q01025529-P1
05/31/2025
Objection resolved — Addressed
05/31/2025
Objection resolved — Addressed
01/15/2025
Objection resolved — Addressed
01/05/2025
Objection resolved — Addressed
12/21/2024
Objection resolved — Addressed
11/15/2024
Objection raised — Zoning
11/15/2024
Objection raised — Scope
Latest 60 of 100 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2019$680K—KANDAHAR DHAKA LLC → Private party$503/sf building
03/28/2018$430K—Private party → KANDAHAR DHAKA LLC$318/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FIGURATIVE SPACE ARCHITECTURE, PLLC806/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOKEN HOME IMPROVEMENTGeneral Contractor207/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781506/04/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMOKEN HOME IMPROVEMENT10/27/2025
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC10/15/2025
DOB NOWStructuralSigned-offMOKEN HOME IMPROVEMENT09/26/2025
BISOTISSUEDKAMTECH RESTORATION CORP02/22/2020
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/16/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/10/2026No Access-Final PL - UndergroundNo AccessView ↗
04/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/20/2026Interior lighting powerAndrew Ingaenergy_progress
07/20/2026Insulation placement and R valuesAndrew Ingaenergy_progress
07/20/2026Fenestration air leakageAndrew Ingaenergy_progress
07/20/2026FinalAndrew Ingaprogress
07/20/2026Structural Wood FrameAndrew Ingaprogress
07/20/2026Fire-Resistance Rated ConstructionAndrew Ingaprogress
07/20/2026Energy Code Compliance InspectionsAndrew Ingaprogress
07/20/2026Post-installed AnchorsCHRISTIAN LOZADAspecial
07/20/2026Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
07/20/2026Wood – Seismic Resistance—special
07/20/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/20/2026Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
07/20/2026Air barrier - visual inspectionAndrew Ingaenergy_progress
07/20/2026Fenestration areasAndrew Ingaenergy_progress
07/20/2026Fenestration and door U-factor and product ratingsAndrew Ingaenergy_progress
07/01/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/01/2026Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/03/2026Wood – Seismic Resistance—special
05/21/2026Air barrier - visual inspectionAndrew Ingaenergy_progress
05/21/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/21/2026Post-installed AnchorsCHRISTIAN LOZADAspecial
05/21/2026Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
05/21/2026Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
05/21/2026Energy Code Compliance InspectionsAndrew Ingaprogress
05/21/2026FinalAndrew Ingaprogress
Latest 25 of 47.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/16/2026Q01025529-S1Request digital key ↗
08/16/2026Q01025529-S2Request digital key ↗
08/16/2026Q01025529-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/11/2020440584841Open ↗
▸BISWORK PERMIT APPLICATION1
02/22/2020440584841Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
08/16/2026Q01025529-I1Open ↗
08/16/2026Q01025529-P3Open ↗
08/13/2026Q01025529-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/16/2026Q01025529-I1Open ↗
08/16/2026Q01025529-P3Open ↗
08/16/2026Q01025529-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/30/2026Q01025529-S2Open ↗
08/29/2026Q01025529-P2Open ↗
08/29/2026Q01025529-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026Q01025529-S2Open ↗
08/29/2026Q01025529-P2Open ↗
08/26/2026Q01025529-P3Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/11/2020440584841Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
02/11/2020440584841Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026Q01025529-I1Open ↗
08/16/2026Q01025529-P3Open ↗
08/16/2026Q01025529-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/11/2020440584841Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/29/2020440584841Open ↗
02/11/2020440584841Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/29/2020440584841Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/11/2020440584841Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
07/29/2020440584841Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/29/2020440584841Open ↗
02/11/2020440584841Open ↗
▸Approvals, Objections & Sign-offs3
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
07/29/2020440584841Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/29/2020440584841Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
07/29/2020440584841Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/29/2020440584841Open ↗
02/11/2020440584841Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
02/19/2020440584841Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/11/2020440584841Open ↗
▸Other Documents12
▸DOB NOWPlot Diagram4
08/16/2026Q01025529-P1Open ↗
08/16/2026Q01025529-I1Open ↗
08/16/2026Q01025529-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/16/2026Q01025529-P1Open ↗
08/16/2026Q01025529-I1Open ↗
08/16/2026Q01025529-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/16/2026Q01025529-P3Open ↗
08/16/2026Q01025529-I1Open ↗
08/16/2026Q01025529-P1Open ↗
Showing 3 of 4 on file for this type