← Back
BuildNYC
Miscellaneous one family
135 CLINTON STREET
BROOKLYN · Brooklyn Heights · BIN 3002621
💬 Discuss this project
1850Year Built
3Stories
A9Building Class
R6Zoning
3,300 sfGross Floor Area
1Units
Miscellaneous one family · 1,163 sf lot · 2.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPartial demolition and structural framing46p · 5 filings · 20 docs
Floor 3Partial demolition and structural framing36p · 5 filings · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 1Partial demolition and structural framing36p · 5 filings · 20 docs
CellarPartial demolition and structural framing28p · 5 filings · 20 docs
Basement12p · 1 filing · 20 docs
Sub-BasementPartial demolition and structural framing23p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2020$4.2M—Private party → Private party$1,258/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
The Brooklyn Studio411/17/2025
RJD Engineering402/05/2025
Martos Engineering204/22/2024
Wavic Engineering104/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Callahan Consulting2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pilaster DevelopmentGeneral Contractor603/21/2026
Macreddin Plumbing & HeatingPlumbing307/08/2026
Pilaster Developmentspecialty_contractor307/08/2026
Accurate MechanicalFire Protection207/08/2026
Antonio Ceriello ElectricElectrical103/22/2026
Ranshaw Fuel Oil PLG HeatingPlumbing103/21/2026
Adam Electrical ContrngElectrical103/22/2026
JSS Plumbing & Heating and SprinklerPlumbing105/13/1999
Salto DesGeneral Contractor109/14/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Christian L. Martos Engineering5965411/17/2025
The Brooklyn Studio of AR2684511/17/2025
Ace Structural Engineering496104/18/2023
Building Lifecycle
12/23/2025
Objection raised — Other
12/23/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
12/01/2025
Objection resolved — Addressed
82 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMacreddin Plumbing & Heating10/09/2025
DOB NOWSprinklersSigned-offAccurate Mechanical01/02/2025
DOB NOWGeneral ConstructionPermit IssuedPilaster Development09/12/2024
DOB NOWMechanical SystemsSigned-offPilaster Development09/12/2024
DOB NOWPlumbingSigned-offMacreddin Plumbing & Heating09/10/2024
DOB NOWStructuralSigned-offPilaster Development05/15/2024
DOB NOWSprinklersSigned-offAccurate Mechanical11/08/2023
DOB NOWPlumbingSigned-offMacreddin Plumbing & Heating09/13/2023
DOB NOWMechanical SystemsSigned-offPilaster Development08/22/2023
DOB NOWGeneral ConstructionPermit IssuedPilaster Development08/21/2023
BISPLISSUEDRanshaw Fuel Oil PLG and Heating02/17/2000
BISOTISSUEDSalto Des09/14/1999
BISOTISSUEDN/A05/13/1999
BISPLISSUEDJSS Plumbing & Heating and Sprinkler05/13/1999
3 projects · most recent 10/26/2025
General Wiring
FiledStatusContractorScope
10/26/2025CompleteAdam Electrical ContrngGeneral Wiring
02/17/2025CompleteAdam Electrical Contrng—
03/12/2021CompleteAntonio Ceriello Electric—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/04/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
12/15/2025Structural Stability – Alterations of existing buildingsChristian Martosspecial
11/14/2025Fire-Resistance Rated ConstructionBrendan Coburnprogress
11/14/2025Fire-Resistant Penetrations and JointsBrendan Coburnspecial
10/08/2025Fire-Resistant Penetrations and JointsBrendan Coburnspecial
10/08/2025Fire-Resistance Rated ConstructionBrendan Coburnprogress
02/12/2025Fire-Resistance Rated ConstructionBrendan Coburnprogress
02/12/2025Fire-Resistant Penetrations and JointsBrendan Coburnspecial
04/22/2024Structural Steel - WeldingChristian Martosspecial
04/22/2024Structural Cold-Formed SteelChristian Martosspecial
04/22/2024FinalChristian Martosprogress
04/22/2024Wood – Seismic ResistanceChristian Martosspecial
04/22/2024MasonryChristian Martosspecial
04/22/2024Structural Steel - High Strength BoltingChristian Martosspecial
04/22/2024Structural Steel - DetailsChristian Martosspecial
04/22/2024Concrete - Cast-In-PlaceChristian Martosspecial
04/22/2024Structural Stability – Alterations of existing buildingsChristian Martosspecial
04/22/2024Post-installed AnchorsChristian Martosspecial
08/22/2023Post-installed AnchorsChristian Martosspecial
08/22/2023Concrete - Cast-In-PlaceChristian Martosspecial
08/22/2023MasonryChristian Martosspecial
08/22/2023Structural Cold-Formed SteelChristian Martosspecial
08/22/2023Structural Stability – Alterations of existing buildingsChristian Martosspecial
08/22/2023Structural Steel - DetailsChristian Martosspecial
08/22/2023Structural Steel - High Strength BoltingChristian Martosspecial
08/22/2023Structural Steel - WeldingChristian Martosspecial
Latest 25 of 28.
66 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account