← Back
Walk-up apt, over six families with stores
135 LEXINGTON AVENUE
MANHATTAN · BIN 1018226
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
C6-2AZoning
8,027 sfGross Floor Area
16Units
Rent Stabilized20 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 135 LEXINGTON AVENUE LLC · 1,786 sf lot · 4.49 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 51p · 1 filing · 10 docs
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 8 docs
Cellar4p · 2 filings · 20 docs
3 jobs · most recent 05/11/2022
General Wiring
FiledStatusContractorScope
05/11/2022Permit IssuedAMC ELEC'L SERVICES, INC.General Wiring
03/01/2022Permit IssuedAMC ELEC'L SERVICES, INC.—
03/11/2021Permit IssuedECS ELEC'L CONTG SERV INC18 meters, 1 new_meters
Building Lifecycle
All (161)Filed (20)Permit Issued (22)Signed Off (10)Violation (60)Inspection (15)Objection (4)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
09/16/2025
Signed off — Alteration
PROPOSED INTERIOR DEMOLITION (REMOVE NON BEARING PARTITION WALLS AND PLUMBING FIXTURES AND FINISHES) AND MINOR RENOVATION ON 1ST FLOOR AND CELLAR, AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00693595-I1
09/16/2025
Signed off — Alteration
PROPOSED INTERIOR DEMOLITION (REMOVE NON-BEARING PARTITION WALLS AND PLUMBING FIXTURES AND FINISHES) AND MINOR RENOVATION ON 1ST FLOOR AND CELLAR, AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00693313-I1
09/16/2025
Signed off — Alteration
PROPOSED INTERIOR DEMOLITION (REMOVE NON-BEARING PARTITION WALLS AND PLUMBING FIXTURES AND FINISHES) AND MINOR RENOVATION ON 1ST FLOOR AND CELLAR, AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00693313-S1
09/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARIJA RISTIC
08/19/2025
Filed — Alteration
PROPOSED INTERIOR DEMOLITION (REMOVE NON-BEARING PARTITION WALLS AND PLUMBING FIXTURES AND FINISHES) AND MINOR RENOVATION ON 1ST FLOOR AND CELLAR, AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00693313-P6
07/24/2025
Signed off — Alteration
Proposed replacement of the existing Gate with new at Exposure 2. No change in use, egress or occupancy.
M01228827-I1
07/07/2025
Permit issued — General Construction
M01228827-I1-GC
06/04/2025
Violation issued (HPD, open)
A
06/04/2025
Special inspection requirement — Air barrier - visual inspection
MARIJA RISTIC
06/04/2025
Special inspection requirement — Fenestration air leakage
MARIJA RISTIC
06/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MARIJA RISTIC
06/04/2025
Special inspection requirement — Interior lighting power
MARIJA RISTIC
06/04/2025
Special inspection requirement — Fenestration areas
MARIJA RISTIC
06/04/2025
Special inspection requirement — Energy Code Compliance Inspections
MARIJA RISTIC
06/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
MARIJA RISTIC
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARIJA RISTIC
06/04/2025
Special inspection requirement — Lighting controls
MARIJA RISTIC
05/23/2025
Filed — Alteration
PROPOSED INTERIOR DEMOLITION (REMOVE NON-BEARING PARTITION WALLS AND PLUMBING FIXTURES AND FINISHES) AND MINOR RENOVATION ON 1ST FLOOR AND CELLAR, AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00693313-P4
05/20/2025
Filed — Alteration
Proposed replacement of the existing Gate with new at Exposure 2. No change in use, egress or occupancy.
M01228827-I1
05/20/2025
Filed — Alteration
PROPOSED INTERIOR DEMOLITION (REMOVE NON-BEARING PARTITION WALLS AND PLUMBING FIXTURES AND FINISHES) AND MINOR RENOVATION ON 1ST FLOOR AND CELLAR, AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00693313-P5
05/20/2025
Special inspection requirement — Final
MARIJA RISTIC
05/15/2025
Special inspection requirement — Interior lighting power
MARIJA RISTIC
05/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARIJA RISTIC
05/15/2025
Special inspection requirement — Energy Code Compliance Inspections
MARIJA RISTIC
05/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
MARIJA RISTIC
05/15/2025
Special inspection requirement — Air barrier - visual inspection
MARIJA RISTIC
05/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MARIJA RISTIC
05/15/2025
Special inspection requirement — Fenestration air leakage
MARIJA RISTIC
05/15/2025
Special inspection requirement — Fenestration areas
MARIJA RISTIC
05/15/2025
Special inspection requirement — Lighting controls
MARIJA RISTIC
05/07/2025
Violation issued (ECB, closed)
Construction
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARIJA RISTIC
04/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2025
Permit issued — Plumbing
M84414761-I1-PL
02/07/2025
Permit issued — General Construction
M00693313-S1-GC
02/07/2025
Permit issued — General Construction
M00693313-I1-GC
11/22/2024
Violation issued (HPD, open)
I
10/17/2024
Signed off — Alteration
Plumbing work for Proposed minor renovation of 14 apartments, as shown on plans. No change in use, egress or occupancy
M08054810-I1
10/15/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/2024
Signed off — Alteration
PROPOSED INTERIOR DEMOLITION (REMOVE NON-BEARING PARTITION WALLS AND PLUMBING FIXTURES AND FINISHES) AND MINOR RENOVATION ON 1ST FLOOR AND CELLAR, AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00693313-S2
09/16/2024
Special inspection requirement — Mechanical Systems
MARIJA RISTIC
09/16/2024
Special inspection requirement — Final
MARIJA RISTIC
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARIJA RISTIC
09/10/2024
Filed — Alteration
PROPOSED INTERIOR DEMOLITION (REMOVE NON-BEARING PARTITION WALLS AND PLUMBING FIXTURES AND FINISHES) AND MINOR RENOVATION ON 1ST FLOOR AND CELLAR, AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00693313-P3
09/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MARIJA RISTIC
09/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
MARIJA RISTIC
09/09/2024
Special inspection requirement — Final
MARIJA RISTIC
09/09/2024
Special inspection requirement — Mechanical Systems
MARIJA RISTIC
09/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARIJA RISTIC
09/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
MARIJA RISTIC
09/04/2024
Permit issued — General Construction
M08054810-I1-GC
08/30/2024
Signed off — Alteration
Proposed installation of 8' high construction fence. No change is use, egress or occupancy.
M00670254-I1
08/29/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/18/2024
Signed off — Alteration
BOILER REPLACEMENT
M00656575-I1
Latest 60 of 161 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
135 LEXINGTON AVE,LLC803/22/2026
AMARA FOODS, INC. / SHAHE303/22/2026
AMARA FOOD, INC / SHAHEEN203/22/2026
FIRST SERVICE WILLIAMS RE103/22/2026
CHARTER COMMUNICATIONS103/22/2026
135 LEXINGTON ASSOCIATES203/21/2026
135 LEXINGTON ASSO LLC RVE203/21/2026
AMARA FOODS INC DBA SHAHEEN SWEE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MR ARCHITECTS PLLC1408/19/2025
RONALD KRIGSMAN P.E.P.C.602/07/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SM DESIGN AND CONSTRUCTIOGeneral Contractor2407/08/2026
EL-ROC CONTRACTING OF BKPlumbing807/08/2026
AMC ELEC'L SERVICES, INC.Electrical203/22/2026
VAN VASSELLElectrical203/21/2026
HOWARD ZAMKOFFElectrical103/21/2026
CAZES, JACKElectrical103/21/2026
ECS ELEC'L CONTG SERV INCElectrical103/22/2026
ESPOSITO, STEVENElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SM STUDIO81731208/19/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO07/07/2025
DOB NOWPlumbingSigned-offEL-ROC CONTRACTING OF BK02/13/2025
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO02/07/2025
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO02/07/2025
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO09/04/2024
DOB NOWPlumbingSigned-offEL-ROC CONTRACTING OF BK03/15/2024
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO02/27/2024
DOB NOWConstruction FenceSigned-offSM DESIGN AND CONSTRUCTIO02/27/2024
DOB NOWMechanical SystemsSigned-offSM DESIGN AND CONSTRUCTIO11/30/2023
DOB NOWPlumbingSigned-offEL-ROC CONTRACTING OF BK11/15/2023
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO10/18/2023
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO09/14/2023
DOB NOWPlumbingSigned-offEL-ROC CONTRACTING OF BK03/08/2023
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO03/01/2023
DOB NOWConstruction FenceSigned-offSM DESIGN AND CONSTRUCTIO03/01/2023
DOB NOWPlumbingSigned-offEL-ROC CONTRACTING OF BK02/13/2023
DOB NOWPlumbingSigned-offEL-ROC CONTRACTING OF BK12/07/2022
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO10/31/2022
DOB NOWBoiler EquipmentSigned-offEL-ROC CONTRACTING OF BK05/11/2022
DOB NOWPlumbingSigned-offEL-ROC CONTRACTING OF BK03/18/2022
DOB NOWGeneral ConstructionSigned-offSM DESIGN AND CONSTRUCTIO03/11/2022
DOB NOWConstruction FenceSigned-offSM DESIGN AND CONSTRUCTIO02/15/2022
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C05/12/2016
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C05/06/2016
BISOTISSUEDGUSTAV RESTORATION LLC02/03/2016
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C05/21/2015
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C05/21/2015
BISPLISSUEDWAGNER ZIV PLUMBING & HEATING03/21/2005
BIS—ISSUEDNY SIGN CITY01/08/2004
BISFPISSUEDSENTINEL FIRE CONTROL INC05/16/1996
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
09/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/15/2024Pass-Final General Construction Non-Directive 14PassView ↗
08/29/2024Fail-Final General Construction Non-Directive 14FailView ↗
03/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/07/2024Pass-Final Boiler Equipment InspectionPassView ↗
09/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
09/03/2025Fire-Resistant Penetrations and JointsMARIJA RISTICspecial
06/04/2025Air barrier - visual inspectionMARIJA RISTICenergy_progress
06/04/2025Fenestration air leakageMARIJA RISTICenergy_progress
06/04/2025Fenestration and door U-factor and product ratingsMARIJA RISTICenergy_progress
06/04/2025Interior lighting powerMARIJA RISTICenergy_progress
06/04/2025Fenestration areasMARIJA RISTICenergy_progress
06/04/2025Energy Code Compliance InspectionsMARIJA RISTICprogress
06/04/2025Fire-Resistance Rated ConstructionMARIJA RISTICprogress
06/04/2025Fire-Resistant Penetrations and JointsMARIJA RISTICspecial
06/04/2025Lighting controlsMARIJA RISTICenergy_progress
05/20/2025FinalMARIJA RISTICprogress
05/15/2025Interior lighting powerMARIJA RISTICenergy_progress
05/15/2025Fire-Resistant Penetrations and JointsMARIJA RISTICspecial
05/15/2025Energy Code Compliance InspectionsMARIJA RISTICprogress
05/15/2025Fire-Resistance Rated ConstructionMARIJA RISTICprogress
05/15/2025Air barrier - visual inspectionMARIJA RISTICenergy_progress
05/15/2025Fenestration and door U-factor and product ratingsMARIJA RISTICenergy_progress
05/15/2025Fenestration air leakageMARIJA RISTICenergy_progress
05/15/2025Fenestration areasMARIJA RISTICenergy_progress
05/15/2025Lighting controlsMARIJA RISTICenergy_progress
05/07/2025Fire-Resistant Penetrations and JointsMARIJA RISTICspecial
09/16/2024Mechanical SystemsMARIJA RISTICspecial
09/16/2024FinalMARIJA RISTICprogress
09/16/2024Fire-Resistant Penetrations and JointsMARIJA RISTICspecial
09/09/2024HVAC-R and service water piping design and insulationMARIJA RISTICenergy_progress
Latest 25 of 46.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
09/03/2026M00656642-I1Request digital key ↗
09/03/2026M00656642-P2Request digital key ↗
09/03/2026M00656642-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
03/25/2019122611842Open ↗
12/24/2018122611842Open ↗
09/11/2017122611842Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
05/27/2016122402738Open ↗
05/27/2016122409660Open ↗
02/09/2016122611842Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications78
▸DOB NOWProgress Inspector Seal & Signature34
09/20/2026M00656642-P2Open ↗
09/20/2026M00656642-P2Open ↗
09/20/2026M00656642-P2Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/02/2026M00693595-P1Open ↗
09/02/2026M00693595-I1Open ↗
09/01/2026M00693313-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/19/2026M00693313-P4Open ↗
09/02/2026M00693595-P1Open ↗
08/30/2026M00693313-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
04/12/2019122611842Open ↗
04/12/2019122611842Open ↗
11/17/2016122611842Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/28/2015122402738Open ↗
05/28/2015122409660Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/28/2015122402738Open ↗
05/28/2015122409660Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/02/2026M00693595-P1Open ↗
09/02/2026M00693595-I1Open ↗
09/01/2026M00693313-P5Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/07/2015122611842Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/12/2019122611842Open ↗
04/12/2019122611842Open ↗
11/17/2016122611842Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00656575-I1Open ↗
08/13/2026M00656642-I1Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
04/12/2019122611842Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/12/2019122611842Open ↗
▸BISSHED LETTER1
05/27/2016122402738Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/07/2015122611842Open ↗
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM4
04/12/2019122611842Open ↗
03/25/2019122611842Open ↗
12/24/2018122611842Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
05/28/2015122402738Open ↗
05/28/2015122409660Open ↗
▸BISADDITIONAL INFORMATION2
06/21/2017122611842Open ↗
11/17/2016122611842Open ↗