← Back
Four families
135 SOUTH 1 STREET
BROOKLYN · Williamsburg · BIN 3062782
💬 Discuss this project
1915Year Built
3Stories
C3Building Class
R6BZoning
3,120 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · Owner of record: AL FRANK 135 SOUTH FIRST LLC · 2,430 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 36p · 2 filings · 20 docs
Floor 214p · 1 filing · 18 docs
Floor 114p · 1 filing · 18 docs
Sub-Basement11p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAX REAL ESTATE1507/08/2026
AL FRANK 135 SOUTH FIRST LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/12/2025$4.3M—135 SOUTH 1ST OWNER LLC → ALIR 135 SOUTH FIRST LLC$1,394/sf building
12/09/2021$2.2M—Private party → 135 SOUTH 1ST OWNER LLC$721/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KUSHNER STUDIOS608/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANKLYLOFTY CONSTRUCTIONGeneral Contractor707/08/2026
SENTER MANAGEMENT LLCGeneral Contractor407/08/2026
WORD OF LIGHT ELECT LLCElectrical203/22/2026
GLENNS PLUMBING SVCS INCPlumbing207/08/2026
AQUA PLUMBING & HTNG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544508/10/2022
Building Lifecycle
All (60)Filed (6)Permit Issued (8)Signed Off (5)Violation (15)Inspection (3)Objection (14)Special Inspection (9)
04/11/2024
Violation issued (HPD, closed)
A
06/01/2023
Signed off — Alteration
INSTALLATION OF NEW DUCTLESS SPLIT AC SYSTEMS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00718608-S1
06/01/2023
Signed off — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENT #3 INCLUDING THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW WALL FINISHES & KITCHEN CABINETS THROUGHOUT UNITS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE OF USE, OCCUPANCY OR EGRESS
B00658209-S1
06/01/2023
Signed off — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENT #3 INCLUDING THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW WALL FINISHES & KITCHEN CABINETS THROUGHOUT UNITS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE OF USE, OCCUPANCY OR EGRESS
B00658209-I1
03/16/2023
Violation issued (HPD, closed)
A
03/16/2023
Violation issued (HPD, closed)
B
03/16/2023
Violation issued (HPD, closed)
B
11/18/2022
Violation issued (HPD, closed)
B
11/18/2022
Violation issued (HPD, closed)
B
11/18/2022
Violation issued (HPD, closed)
C
11/18/2022
Violation issued (HPD, closed)
A
10/31/2022
Signed off — Alteration
INSTALLATION OF NEW DUCTLESS SPLIT AC SYSTEMS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00718608-I1
10/31/2022
Signed off — Alteration
INSTALLATION OF NEW DUCTLESS SPLIT AC SYSTEMS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00718608-S2
10/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/21/2022
Permit issued — Mechanical Systems
B00718608-S2-MS
09/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/30/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/10/2022
Filed — Alteration
INSTALLATION OF NEW DUCTLESS SPLIT AC SYSTEMS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00718608-S2
08/03/2022
Permit issued — Plumbing
B00718608-S1-PL
06/30/2022
Filed — Alteration
INSTALLATION OF NEW DUCTLESS SPLIT AC SYSTEMS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00718608-S1
06/21/2022
Permit issued — Plumbing
B00658209-S1-PL
06/01/2022
Permit issued — General Construction
B00718608-I1-GC
06/01/2022
Permit issued — General Construction
B00658209-I1-GC
05/23/2022
Filed — Alteration
INSTALLATION OF NEW DUCTLESS SPLIT AC SYSTEMS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00718608-P1
05/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
05/06/2022
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
05/06/2022
Special inspection requirement — Final
EUGENE BIFULCO
05/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
05/06/2022
Special inspection requirement — Lighting in dwelling units
EUGENE BIFULCO
04/27/2022
Permit issued — General Construction
B00718608-I1-GC
04/27/2022
Permit issued — Plumbing
B00658209-S1-PL
04/18/2022
Filed — Alteration
INSTALLATION OF NEW DUCTLESS SPLIT AC SYSTEMS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00718608-I1
04/06/2022
Permit issued — General Construction
B00658209-I1-GC
03/22/2022
Filed — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENT #3 INCLUDING THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW WALL FINISHES & KITCHEN CABINETS THROUGHOUT UNITS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE OF USE, OCCUPANCY OR EGRESS
B00658209-S1
03/02/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
02/14/2022
Objection raised — Structural
02/14/2022
Objection resolved — Addressed
02/14/2022
Objection raised — Inspections
02/14/2022
Objection resolved — Addressed
02/14/2022
Objection raised — Other
02/14/2022
Objection resolved — Addressed
02/14/2022
Objection raised — Fire_Protection
02/14/2022
Objection resolved — Addressed
02/14/2022
Objection raised — Fire_Protection
02/14/2022
Objection resolved — Addressed
02/14/2022
Objection raised — Scope
02/14/2022
Objection resolved — Addressed
02/14/2022
Objection raised — Admin
02/14/2022
Objection resolved — Addressed
02/09/2022
Filed — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENT #3 INCLUDING THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW WALL FINISHES & KITCHEN CABINETS THROUGHOUT UNITS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE OF USE, OCCUPANCY OR EGRESS
B00658209-I1
02/07/2022
Special inspection requirement — Lighting in dwelling units
EUGENE BIFULCO
02/01/2022
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
02/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
01/06/2022
Special inspection requirement — Final
EUGENE BIFULCO
04/13/2021
Violation issued (HPD, closed)
A
10/31/2019
Violation issued (HPD, closed)
I
11/29/2017
Violation issued (HPD, closed)
I
11/15/2016
Violation issued (HPD, closed)
I
07/25/1984
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFRANKLYLOFTY CONSTRUCTION09/21/2022
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC08/03/2022
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC06/21/2022
DOB NOWGeneral ConstructionSigned-offFRANKLYLOFTY CONSTRUCTION06/01/2022
DOB NOWGeneral ConstructionSigned-offFRANKLYLOFTY CONSTRUCTION06/01/2022
DOB NOWGeneral ConstructionSigned-offSENTER MANAGEMENT LLC04/27/2022
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP04/27/2022
DOB NOWGeneral ConstructionSigned-offSENTER MANAGEMENT LLC04/06/2022
4 projects · most recent 12/07/2022
General Wiring
FiledStatusContractorScope
12/07/2022CompleteWORD OF LIGHT ELECT LLCGeneral Wiring
06/23/2022CompleteWORD OF LIGHT ELECT LLCGeneral Wiring
06/23/2022CompleteWORD OF LIGHT ELECT LLCGeneral Wiring
04/20/2022CompleteDENMAR ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
05/06/2022Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
05/06/2022Energy Code Compliance InspectionsEUGENE BIFULCOprogress
05/06/2022FinalEUGENE BIFULCOprogress
05/06/2022Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
05/06/2022Lighting in dwelling unitsEUGENE BIFULCOenergy_progress
02/07/2022Lighting in dwelling unitsEUGENE BIFULCOenergy_progress
02/01/2022Energy Code Compliance InspectionsEUGENE BIFULCOprogress
02/01/2022Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
01/06/2022FinalEUGENE BIFULCOprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026B00658209-S1Request digital key ↗
08/29/2026B00718608-P1Request digital key ↗
08/29/2026B00718608-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026B00658209-I1Open ↗
08/31/2026B00658209-S1Open ↗
08/29/2026B00718608-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B00718608-P1Open ↗
09/02/2026B00718608-P1Open ↗
09/01/2026B00658209-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B00718608-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/31/2026B00658209-S1Open ↗
08/29/2026B00718608-P1Open ↗
08/29/2026B00718608-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis3
08/29/2026B00718608-I1Open ↗
08/29/2026B00718608-S2Open ↗
08/15/2026B00658209-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/29/2026B00718608-S2Open ↗