← Back
BuildNYC
Elevator apt, semi-fireproof with stores
135 SOUTH 3RD STREET
BROOKLYN · BIN 3427455
💬 Discuss this project
2024Year Built
5Stories
D7Building Class
R6Zoning
10,833 sfGross Floor Area
10Units
Rent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 333 Bedford Ave · 2,484 sf lot · 4.36 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMontessori13p · 1 filing · 13 docs
Floor 5Montessori12p · 1 filing · 13 docs
Floor 4Montessori12p · 1 filing · 13 docs
Floor 3Montessori12p · 1 filing · 13 docs
Floor 2Montessori23p · 1 filing · 13 docs
Floor 1Montessori22p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
333 Bedford Ave103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2023$3.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Charles Diehl Architect308/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Design Procure BuildersGeneral Contractor204/09/2026
Jpi Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RLC HVAC Controls5082308/19/2025
Building Lifecycle
All (24)Filed (3)Permit Issued (3)Violation (2)Inspection (1)Special Inspection (15)
09/25/2025
Permit issued — General Construction
B01235238-I1-GC
09/25/2025
Permit issued — Mechanical Systems
B01235238-S2-MS
09/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/27/2025
Permit issued — Plumbing
B01235238-S1-PL
08/19/2025
Filed — Alteration CO
INTERIOR RENOVATION WORK TO CONVERT THE1ST FL. RETAIL SPACE & 2ND FL. AMBULATORY MEDICALSPACE INTO AN INSTITUTIONAL OCCUPANCY.THERE WILL BE NO CHANGE IN EGRESS. PLUMBING WORK INCLUDES INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLUMBING PLANS.
B01235238-I1
08/19/2025
Filed — Alteration CO
INTERIOR RENOVATION WORK TO CONVERT THE1ST FL. RETAIL SPACE & 2ND FL. AMBULATORY MEDICALSPACE INTO AN INSTITUTIONAL OCCUPANCY.THERE WILL BE NO CHANGE IN EGRESS. PLUMBING WORK INCLUDES INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLUMBING PLANS.
B01235238-S2
08/19/2025
Filed — Alteration CO
INTERIOR RENOVATION WORK TO CONVERT THE1ST FL. RETAIL SPACE & 2ND FL. AMBULATORY MEDICALSPACE INTO AN INSTITUTIONAL OCCUPANCY.THERE WILL BE NO CHANGE IN EGRESS. PLUMBING WORK INCLUDES INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLUMBING PLANS.
B01235238-S1
08/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
MICHAEL LI
08/16/2025
Special inspection requirement — Shutoff dampers
MICHAEL LI
08/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL LI
08/16/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL LI
08/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL LI
08/16/2025
Special inspection requirement — Maintenance information
MICHAEL LI
08/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL LI
08/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL LI
08/15/2025
Special inspection requirement — Final
MICHAEL LI
08/15/2025
Special inspection requirement — Mechanical Systems
MICHAEL LI
08/14/2025
Special inspection requirement — Lighting controls
MICHAEL LI
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL LI
08/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
MICHAEL LI
08/14/2025
Special inspection requirement — Interior lighting power
MICHAEL LI
08/14/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL LI
10/01/2024
Violation issued (ECB, closed)
Construction
08/26/2005
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDesign Procure Build09/25/2025
DOB NOWMechanical SystemsPermit IssuedDesign Procure Build09/25/2025
DOB NOWPlumbingPermit IssuedJpi Plumbing & Heating08/27/2025
1 project · most recent 08/07/2025
General Wiring
FiledStatusContractorScope
08/07/2025Permit IssuedL J Electrical ServiceGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/17/2025Tenant Protection Plan ComplianceMICHAEL LIspecial
08/16/2025Shutoff dampersMICHAEL LIenergy_progress
08/16/2025Fire-Resistant Penetrations and JointsMICHAEL LIspecial
08/16/2025Energy Code Compliance InspectionsMICHAEL LIprogress
08/16/2025HVAC-R and service water piping design and insulationMICHAEL LIenergy_progress
08/16/2025Maintenance informationMICHAEL LIenergy_progress
08/16/2025HVAC-R and service water heating system controlsMICHAEL LIenergy_progress
08/16/2025HVAC-R and service water heating equipmentMICHAEL LIenergy_progress
08/15/2025FinalMICHAEL LIprogress
08/15/2025Mechanical SystemsMICHAEL LIspecial
08/14/2025Lighting controlsMICHAEL LIenergy_progress
08/14/2025Fire-Resistant Penetrations and JointsMICHAEL LIspecial
08/14/2025Tenant Protection Plan ComplianceMICHAEL LIspecial
08/14/2025Interior lighting powerMICHAEL LIenergy_progress
08/14/2025Energy Code Compliance InspectionsMICHAEL LIprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MontessoriEducationFloors 1–5, Roof
Project B01235238 Alteration CO · Permit Entire · 08/19/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026B01235238-I1Request digital key ↗
08/20/2026B01235238-S1Request digital key ↗
08/20/2026B01235238-S2Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01235238-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01235238-S2Open ↗
09/01/2026B01235238-S2Open ↗
08/28/2026B01235238-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01235238-S2Open ↗
08/20/2026B01235238-S1Open ↗
08/20/2026B01235238-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01235238-S2Open ↗
08/28/2026B01235238-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01235238-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01235238-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/20/2026B01235238-I1Open ↗