← Back
Five to six families
135 WEST 12 STREET
MANHATTAN · West Village · BIN 1010625
💬 Discuss this project
1828Year Built
4Stories
C2Building Class
R6Zoning
5,760 sfGross Floor Area
5Units
Rent Stabilized0 Open Violations
Five to six families · Owner of record: TRUST B UNDER CASSIM MOHAMED JADWAT REVO CABLE TR · 2,317 sf lot · 2.49 FAR built · Flood zone X
Locations of Work
Structural
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CMJ TRUST B1203/22/2026
TRUST B UNDER CASSIM MOHAMED JADWAT REVO CABLE TR203/22/2026
NEW SCHOOL SOCIAL RSRCH T103/22/2026
Z-DAR CONTRACTING203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JACK GREEN ASSOCIATES406/24/2024
SILMAN109/11/2023
PULLTAB DESIGN207/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN LIGHT EXPEDITING LLC703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Z-DAR CONTRACTING INCGeneral Contractor903/21/2026
FIVE STAR P AND H CO, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHEN ENGINEERING SERVICES1826109/11/2023
PULLTAB DESIGN3110207/13/2023
JACK GREEN ASSOCIATES422106/01/2023
Building Lifecycle
All (46)Filed (7)Permit Issued (4)Signed Off (3)Violation (13)Inspection (4)Objection (7)Special Inspection (8)
04/29/2026
Violation issued (HPD, closed)
A
09/17/2024
Violation issued (ECB, closed)
Local Law
08/22/2024
Signed off — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-S1
08/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/31/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/11/2024
Signed off — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-S3
07/01/2024
Signed off — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-I1
06/24/2024
Filed — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-P4
04/01/2024
Violation issued (HPD, closed)
A
10/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/12/2023
Permit issued — Structural
M00870219-S3-ST
09/11/2023
Filed — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-S3
09/08/2023
Special inspection requirement — Final
HENLIA CHEN
09/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
HENLIA CHEN
09/08/2023
Special inspection requirement — Masonry
HENLIA CHEN
09/08/2023
Special inspection requirement — Structural Steel - Details
HENLIA CHEN
08/30/2023
Permit issued — Mechanical Systems
M00870219-S2-MS
08/24/2023
Filed — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-P3
08/22/2023
Violation issued (ECB, closed)
Construction
08/22/2023
Violation issued (ECB, closed)
Construction
07/31/2023
Permit issued — Plumbing
M00870219-S1-PL
07/24/2023
Objection raised — Scope
07/13/2023
Filed — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-P1
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Handley
07/13/2023
Special inspection requirement — Final
Jon Handley
07/03/2023
Permit issued — General Construction
M00870219-I1-GC
06/22/2023
Objection resolved — Addressed
06/22/2023
Objection resolved — Addressed
06/22/2023
Objection resolved — Addressed
06/20/2023
Objection raised — Scope
06/20/2023
Objection raised — Accessibility
06/08/2023
Violation issued (ECB, closed)
Construction
06/08/2023
Objection raised — Scope
06/01/2023
Filed — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-S1
06/01/2023
Filed — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-S2
05/30/2023
Filed — Alteration
Repair existing masonry arch/wall including new steel lintel at first floor. New post and beam to replace existing wood relieving wall. New steel angle lintel
M00870219-I1
05/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Handley
05/08/2023
Special inspection requirement — Final
Jon Handley
03/15/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
10/26/2016
Violation issued (HPD, closed)
I
08/27/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offZ-DAR CONTRACTING INC10/12/2023
DOB NOWMechanical SystemsPermit IssuedZ-DAR CONTRACTING INC08/30/2023
DOB NOWPlumbingSigned-offFIVE STAR P AND H CO, INC07/31/2023
DOB NOWGeneral ConstructionSigned-offZ-DAR CONTRACTING INC07/03/2023
BISPLISSUEDCALRAY GAS HT CORP08/03/1999
BISBLISSUEDCALRAY GAS HT CORP08/03/1999
BISPLRE-ISSUEDMULLIGAN HTG CO INC06/04/1999
BISOTISSUEDCASSIM M JADWAT11/19/1998
1 project · most recent 06/24/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/24/2024Signed-offFIVE STAR P AND H CO, INCGas, Water/Sanitary
1 project · most recent 04/07/2025
General Wiring
FiledStatusContractorScope
04/07/2025CompleteEIS ELECTRIC CORP DBAGeneral Wiring
1 project · most recent 06/24/2024
Steel Masonry
FiledStatusContractorScope
06/24/2024Signed-offZ-DAR CONTRACTING INCSteel, Masonry
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/08/2023FinalHENLIA CHENprogress
09/08/2023Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
09/08/2023MasonryHENLIA CHENspecial
09/08/2023Structural Steel - DetailsHENLIA CHENspecial
07/13/2023Fire-Resistant Penetrations and JointsJon Handleyspecial
07/13/2023FinalJon Handleyprogress
05/08/2023Fire-Resistant Penetrations and JointsJon Handleyspecial
05/08/2023FinalJon Handleyprogress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026M00870219-S3Request digital key ↗
08/29/2026M00870219-P3Request digital key ↗
08/29/2026M00870219-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/13/2026M00870219-S2Open ↗
08/13/2026M00870219-P4Open ↗
08/13/2026M00870219-P1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026M00870219-P3Open ↗
08/13/2026M00870219-S1Open ↗
08/13/2026M00870219-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026M00870219-I1Open ↗
08/23/2026M00870219-S3Open ↗
08/23/2026M00870219-S3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026M00870219-I1Open ↗
08/23/2026M00870219-S3Open ↗
08/23/2026M00870219-P1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026M00870219-P4Open ↗
08/13/2026M00870219-P3Open ↗
08/13/2026M00870219-I1Open ↗
Showing 3 of 7 on file for this type