← Back
BuildNYC
Miscellaneous asylum / home
135 WEST 128TH STREET
MANHATTAN · BIN 1057933
💬 Discuss this project
1910Year Built
4Stories
N9Building Class
R7-2Zoning
14,280 sfGross Floor Area
28Units
Rent Stabilized16 Active Violations 7 unresolved · 9 paperwork only ▸
Miscellaneous asylum / home · Owner of record: Create HSG Development FD · 5,795 sf lot · 2.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMechanical work for washer and dryer5p · 1 filing · 4 docs
Floor 1Mechanical work for washer and dryer8p · 2 filings · 6 docs
CellarPlumbing and gas riser work5p · 1 filing · 2 docs
Site & exteriorStucco repair and replacement at front facadeUnder Construction7p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Create903/21/2026
Argus Community503/22/2026
Aio Building Consulting210/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asr Engineering109/27/2026
Always Fast Services105/11/2026
Bazini Engineering208/24/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
East Coast PetroleumGeneral Contractor203/21/2026
Park Contracting GroupScaffold208/05/2026
Manhattan ElectricElectrical103/21/2026
Amp ElectricElectrical103/21/2026
Kingstone General ConstructionGeneral Contractor110/02/2026
East Coast MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808208/24/2021
Building Lifecycle
All (66)Filed (4)Permit Issued (5)Violation (52)Inspection (1)Special Inspection (4)
10/01/2026
Permit issued — General Construction
M01463410-I1-GC
09/27/2026
Filed — Alteration
FILING TO REPAIR AND REPLACE STUCCO AT FRONT FACADE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01463410-I1
09/26/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
AKM RAHMAN
09/22/2026
Special inspection requirement — Final
AKM RAHMAN
08/04/2026
Permit issued — Sidewalk Shed
M01399269-I1-SH
07/06/2026
Violation issued (ECB, open)
Construction
05/11/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01399269-I1
05/11/2026
Permit issued — Sidewalk Shed
M01399269-I1-SH
04/29/2026
Violation issued (HPD, open)
A
03/03/2026
Violation issued (ECB, open)
Construction
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, open)
I
04/02/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, open)
I
12/29/2022
Violation issued (ECB, closed)
Construction
12/29/2022
Violation issued (ECB, closed)
Construction
12/29/2022
Violation issued (ECB, closed)
Construction
12/29/2022
Violation issued (ECB, closed)
Construction
12/29/2022
Violation issued (ECB, closed)
Construction
04/05/2022
Violation issued (ECB, open)
Construction
04/05/2022
Violation issued (ECB, open)
Unknown
04/05/2022
Violation issued (ECB, closed)
Construction
04/05/2022
Violation issued (ECB, open)
Unknown
04/05/2022
Violation issued (ECB, open)
Construction
04/05/2022
Violation issued (ECB, open)
Construction
04/05/2022
Violation issued (ECB, open)
Unknown
02/16/2022
Violation issued (HPD, closed)
A
08/31/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/24/2021
Filed — Alteration
M00528487-I1
08/24/2021
Filed — Alteration
M00528470-I1
08/24/2021
Permit issued — Mechanical Systems
M00528470-I1-MS
08/24/2021
Permit issued — Plumbing
M00528487-I1-PL
05/25/2021
Special inspection requirement — Mechanical Systems
Joseph Bazini
05/25/2021
Special inspection requirement — Final
Joseph Bazini
04/02/2021
Violation issued (HPD, closed)
A
12/23/2020
Violation issued (ECB, closed)
Boilers
10/25/2019
Violation issued (HPD, closed)
I
07/19/2019
Violation issued (ECB, open)
Construction
05/20/2019
Violation issued (ECB, open)
Boilers
10/10/2018
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/17/2017
Violation issued (ECB, closed)
Unknown
03/15/2017
Violation issued (ECB, closed)
Plumbing
03/15/2017
Violation issued (ECB, closed)
Construction
10/27/2016
Violation issued (HPD, closed)
I
02/25/2016
Violation issued (ECB, closed)
Construction
02/25/2016
Violation issued (ECB, closed)
Construction
02/25/2016
Violation issued (ECB, closed)
Construction
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2010
Violation issued (ECB, closed)
Boilers
06/07/2010
Violation issued (HPD, closed)
C
06/07/2010
Violation issued (HPD, closed)
C
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/26/1999
Violation issued (HPD, closed)
A
05/26/1999
Violation issued (HPD, closed)
A
05/26/1999
Violation issued (HPD, closed)
A
05/26/1999
Violation issued (HPD, closed)
C
05/26/1999
Violation issued (HPD, closed)
B
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKingstone General Construction10/01/2026
DOB NOWSidewalk ShedPermit IssuedPark Contracting Group08/04/2026
DOB NOWSidewalk ShedPermit IssuedPark Contracting Group05/11/2026
DOB NOWMechanical SystemsPermit IssuedEast Coast Petroleum08/24/2021
DOB NOWPlumbingPermit IssuedEast Coast Mechanical08/24/2021
BISFPISSUEDMaster Fire Systems11/06/2013
BISBLISSUEDPat Sementa P & H Co03/30/2011
BISBLISSUEDC James Plumbing & Heating03/06/2006
BISPLISSUEDC James Plumbing & Heating03/06/2006
1 project · most recent 08/24/2021
Others
FiledStatusContractorScope
08/24/2021Permit IssuedEast Coast PetroleumOthers
2 projects · most recent 05/11/2026
General Wiring
FiledStatusContractorScope
05/11/2026Permit IssuedRichard Neu—
11/17/2022Permit IssuedAmp ElectricGeneral Wiring
1 project · most recent 05/11/2026
Sidewalk Shed
FiledStatusContractorScope
05/11/2026Permit IssuedPark Contracting GroupSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/31/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/26/2026Exterior Insulation and Finish Systems (EIFS)AKM RAHMANspecial
09/22/2026FinalAKM RAHMANprogress
05/25/2021Mechanical SystemsJoseph Bazinispecial
05/25/2021FinalJoseph Baziniprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
10/04/2026M01463410-I1Request digital key ↗
09/03/2026M00528470-I1Request digital key ↗
09/03/2026M00528487-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/06/2013121822581Open ↗
▸BISWORK PERMIT APPLICATION1
11/08/2013121822581Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION4
12/06/2013121822581Open ↗
11/08/2013121822581Open ↗
04/03/2014121822581Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/02/2026M01463410-I1Open ↗
09/03/2026M00528487-I1Open ↗
08/17/2026M01399269-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
10/02/2026M01463410-I1Open ↗
08/28/2026M00528470-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/02/2026M01463410-I1Open ↗
08/28/2026M00528470-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/06/2013121822581Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/06/2013121822581Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
04/03/2014121822581Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/03/2026M00528487-I1Open ↗
08/13/2026M00528470-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/03/2014121822581Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
04/03/2014121822581Open ↗
03/27/2014121822581Open ↗
12/06/2013121822581Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/06/2013121822581Open ↗