1963Year Built
23Stories
O4Building Class
C6-6.5Zoning
865,759 sfGross Floor Area
52Units
LL97 Covered3 Active Violations 2 likely answered ▸FISP: UNSAFE
Office, 20+ stories, with or without commercial - converting to residential (32 apartments filed) · Owner of record: 135 West 50th Street Ground Owner · 48,200 sf lot · 17.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofGCS & UBSUnder Construction18p · 4 filings · 20 docs
BulkheadGeorge Comfort & Sons, INC.1p · 1 filing · 2 docs
Floor 24GCS & UBS10p · 1 filing · 20 docs
Floor 23GCS & UBS10p · 1 filing · 20 docs
Floor 22GCS & UBS34p · 3 filings · 20 docs
Floor 21
Floor 20
Floor 19Mazars, GCS & UBS40p · 4 filings · 20 docs
Floor 18Mazars, GCS & UBS51p · 5 filings · 20 docs
Floor 17Mazars, GCS & UBS40p · 4 filings · 20 docs
Floor 16Mazars, GCS & UBS58p · 10 filings · 20 docs
Floor 15GCS & UBS2p · 5 filings · 18 docs
Floor 14GCS & UBS17p · 3 filings · 18 docs
Floor 13GCS & UBS17p · 3 filings · 18 docs
Floor 12GCS & UBS16p · 3 filings · 18 docs
Floor 11
Floor 10GCS & UBS9p · 3 filings · 19 docs
Floor 9George Comfort & Sons, INC.Under Construction76p · 9 filings · 20 docs
Floor 8George Comfort & Sons, INC.56p · 7 filings · 20 docs
Floor 7
Floor 6GCS & UBS17p · 3 filings · 18 docs
Floor 5GCS & UBS17p · 3 filings · 18 docs
Floor 4R2Net39p · 5 filings · 20 docs
Floor 3Bobby Van's Grill23p · 2 filings · 20 docs
Floor 2Bobby Van's Grill, GCS & UBS +1Under Construction13p · 16 filings · 20 docs
Floor 1Ground Central, Bobby Van's Grill +3Under Construction220p · 28 filings · 20 docs
Mezzanine135 West 50th Street Ground Owner LLCUnder Construction17p · 1 filing · 6 docs
CellarBobby Van's Grill, UrbanspaceUnder Construction191p · 20 filings · 20 docs
Sub-CellarGeorge Comfort & Sons, INC.65p · 7 filings · 20 docs
Site & exteriorUrban HawkerUnder Construction32p · 15 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
George Comfort & Sons49907/08/2026
135 W 50th Owner11007/02/2026
Royal Realty Corp Agent10803/21/2026
135 West 50th St Investors C/O9107/08/2026
135 West 50th St8703/21/2026
Cassidy Turley5003/21/2026
Murray Hill Properties2003/21/2026
DTZ1403/21/2026
135 W 50 St LLC C Omurray Hill P903/21/2026
135 West 50th Associates703/21/2026
Westwood Management Co503/21/2026
135 W 50th St Associates Grubb Elli503/21/2026
135WEST50STR Owner LLC Murray H403/21/2026
Bocca403/21/2026
Axiom Realty As Agent403/21/2026
135 W 50th Street203/21/2026
Axiom Real Estate Manangerment203/21/2026
Total Line Construction103/21/2026
Quantum Design103/21/2026
Durst Partners103/21/2026
DC Associates103/21/2026
E.S. Gordon Co103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2019$285.0M—— → —$329/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants17703/21/2026
Seay-Yarbrough603/21/2026
AE Design Solution1203/21/2026
Building Brothers403/21/2026
JP Expedite1603/21/2026
Spring Scaffolding803/21/2026
Green Studio203/21/2026
Skyline Access103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FolorGeneral Contractor2807/08/2026
Allertonfox ConstructionGeneral Contractor2307/08/2026
P & D MechanicalFire Protection1807/08/2026
Spring ScaffoldingScaffold1507/08/2026
Signs CadSign hanger1307/08/2026
Atlas Construction of NYScaffold1107/08/2026
Anesis ServicesFire Protection807/08/2026
Hydrokinetic Plumbing & Heating IPlumbing707/08/2026
JT Magen & CompanyGeneral Contractor707/08/2026
CM PlumbingPlumbing607/08/2026
Atlas Construction of NYGeneral Contractor607/08/2026
Everest ScaffoldingScaffold507/08/2026
Tower Fire ProtectionFire Protection507/08/2026
Allstate Electrical ContElectrical403/22/2026
A&A PlumbingPlumbing407/08/2026
Ashland PlumbingPlumbing307/08/2026
George Breslaw PlumbingPlumbing207/08/2026
Andamio ScaffoldingScaffold207/08/2026
Mac FelderPlumbing207/08/2026
Mackler Master FireFire Protection207/08/2026
Innovative Electrical ServiceElectrical203/21/2026
Active SignsSign hanger207/08/2026
Shaw MechanicalPlumbing207/08/2026
Standard Fire ProtectionFire Protection207/08/2026
Star Electrical ContractorsElectrical203/22/2026
L.E.A. ElectricElectrical103/21/2026
A.S.K. ElectricalElectrical103/21/2026
Axcel Electric CoElectrical103/22/2026
PSI PartnersFire Protection107/08/2026
Black Bull BuldersGeneral Contractor107/08/2026
Par Plumbing Co., Inc.oFire Protection103/21/2026
Core Four ConstructionGeneral Contractor107/08/2026
DoriaGeneral Contractor107/08/2026
Polo Electric Corp D/B/AElectrical103/21/2026
Northeast Specialist GroupGeneral Contractor107/02/2026
Corp Electrical TechnologiesElectrical103/21/2026
Adco ElectricalElectrical103/21/2026
Stat ElectricElectrical103/21/2026
Ampere Electrical ServicesElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JS Building Consulting4959105/12/2026
Leo Y Lee Associates2481311/08/2024
Alan Margolin & Associates4235203/15/2023
Milrose Consultants2003702/16/2023
Special Inspection Services1200202/15/2023
Brian Ill Development1402203/15/2022
AK Engineering678805/27/2021
Building Lifecycle
All (300)Filed (67)Permit Issued (80)Signed Off (43)Facade (FISP) (15)Violation (15)Inspection (36)Objection (14)Special Inspection (30)
06/30/2026
Permit issued — General Construction
M01400622-I1-GC
06/05/2026
Permit issued — Structural
M00772358-I1-GC
06/05/2026
Permit issued — Supported Scaffold
M00864378-I1-SF
06/05/2026
Permit issued — Protection and Mechanical Methods
M00866835-I1-PMM
06/04/2026
Permit issued — Suspended Scaffold
M01135012-I1-SC
05/22/2026
Objection resolved — Addressed
05/15/2026
Objection raised — Other
05/12/2026
Filed — Alteration CO
Mechanical work associated with the conversion of this floor.
M01400622-I1
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Julian Saavedra
05/11/2026
Special inspection requirement — Sprayed fire-resistant materials
Julian Saavedra
04/20/2026
Violation issued (ECB, open)
Local Law
03/30/2026
Cycle 9 facade report submitted
03/27/2026
Cycle 9 facade report signed — UNSAFE
03/26/2026
Cycle 9 facade inspection completed
09/25/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00889933-I1
06/11/2025
Permit issued — Suspended Scaffold
M01135012-I1-SC
06/11/2025
Permit issued — Protection and Mechanical Methods
M00866835-I1-PMM
06/11/2025
Permit issued — Supported Scaffold
M00864378-I1-SF
06/11/2025
Permit issued — General Construction
M00772358-I1-GC
06/03/2025
Cycle 9 facade report signed — UNSAFE
05/30/2025
Cycle 9 facade report submitted
05/29/2025
Cycle 9 facade inspection completed
01/08/2025
Cycle 9 facade report submitted
01/02/2025
Cycle 9 facade report signed — UNSAFE
12/20/2024
Cycle 9 facade inspection completed
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2024
Permit issued — Suspended Scaffold
M01135012-I1-SC
11/08/2024
Filed — Alteration
M01135012-I1
08/20/2024
Permit issued — Suspended Scaffold
M01088621-I1-SC
08/13/2024
Filed — Alteration
IRA to assist with. Condition Assessment
M01088621-I1
08/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/17/2024
Permit issued — Sidewalk Shed
M00889933-I1-SH
06/06/2024
Permit issued — Structural
M00772358-I1-GC
06/05/2024
Permit issued — Protection and Mechanical Methods
M00866835-I1-PMM
06/05/2024
Permit issued — Supported Scaffold
M00864378-I1-SF
06/05/2024
Permit issued — Structural
M00772358-I1-ST
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade report signed — UNSAFE
02/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/15/2024
Cycle 9 facade inspection completed
01/30/2024
Permit issued — Standpipe
M00740860-I1-PL
01/25/2024
Signed off — Alteration
Installation of new fuel oil system with Fuel oil room including 5000 tank located in the sub-cellar and 330 gallon day tank located on the 9th floor.
M00227888-S1
01/23/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/19/2024
Signed off — Alteration
Filing an alteration type 2 for the marketing center of an existing 23-story office building. No change to use, egress or occupancy. Marketing center to include non-structural partitions, ceiling, lighting at elevator lobby on 10th floor, as well as floor
M00699675-I1
01/10/2024
Permit issued — Suspended Scaffold
M00985429-I1-SC
01/04/2024
Filed — Alteration
Renewal of SR23/1844
M00985429-I1
12/06/2023
Permit issued — Mechanical Systems
M00233403-I1-MS
11/13/2023
Signed off — Alteration
Demolition of pantries, ADA & core restrooms; Disconnecting the sprinkler systems serving the space and replacing them with temporary sprinkler loops around the core.
M00756664-I1
11/13/2023
Signed off — Alteration
Temporary sprinkler head.New sprinkler main from street pressure. No change to use, egress or occupancy.
M00791922-I1
10/23/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/18/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/16/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/26/2023
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (URBAN HAWKER)
M00793535-I1
09/26/2023
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (URBAN HAWKER)
M00793549-I1
08/30/2023
Signed off — Alteration
Full mechanical demolition of existing space, and installing (1) 11 T water cooled AC unit. No change to use, egress or occupancy.
M00791841-I1
08/30/2023
Signed off — Alteration
DEMISING WALL, AND EXIT STOREFRONT RETAIL DOOR ADDITION. APPROXIMATE SCOPE SIZE 1557 SF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00791826-I1
08/08/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/03/2023
Permit issued — General Construction
M00772358-I1-GC
08/03/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/02/2023
Permit issued — General Construction
M00772358-I1-ST
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNortheast Specialist Group06/30/2026
DOB NOWStructuralPermit IssuedAtlas Construction of NY06/05/2026
DOB NOWSupported ScaffoldPermit IssuedAtlas Construction of NY06/05/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedAtlas Construction of NY06/05/2026
DOB NOWSuspended ScaffoldPermit IssuedAtlas Construction of NY06/04/2026
DOB NOWSupported ScaffoldPermit IssuedAtlas Construction of NY06/11/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedAtlas Construction of NY06/11/2025
DOB NOWGeneral ConstructionPermit IssuedAtlas Construction of NY06/11/2025
DOB NOWSuspended ScaffoldPermit IssuedAtlas Construction of NY06/11/2025
DOB NOWSuspended ScaffoldPermit IssuedAtlas Construction of NY11/14/2024
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration08/20/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding07/17/2024
DOB NOWStructuralPermit IssuedAtlas Construction of NY06/06/2024
DOB NOWStructuralPermit IssuedAtlas Construction of NY06/05/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedAtlas Construction of NY06/05/2024
DOB NOWSupported ScaffoldPermit IssuedAtlas Construction of NY06/05/2024
DOB NOWPlumbingPermit IssuedGeorge Breslaw Plumbing01/30/2024
DOB NOWSuspended ScaffoldPermit IssuedAtlas Construction of NY01/10/2024
DOB NOWMechanical SystemsPermit IssuedFolor12/06/2023
DOB NOWGeneral ConstructionPermit IssuedAtlas Construction of NY08/03/2023
DOB NOWGeneral ConstructionPermit IssuedAtlas Construction of NY08/02/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedAtlas Construction of NY06/29/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding06/19/2023
DOB NOWSupported ScaffoldPermit IssuedAtlas Construction of NY06/07/2023
DOB NOWBoiler EquipmentSigned-offChampion Combustion05/04/2023
DOB NOWSprinklersSigned-offP & D Mechanical02/22/2023
DOB NOWConstruction FenceSigned-offSpring Scaffolding02/07/2023
DOB NOWPlumbingPermit IssuedGeorge Breslaw Plumbing02/03/2023
DOB NOWSprinklersSigned-offP & D Mechanical01/10/2023
DOB NOWStandpipeSigned-offP & D Mechanical01/10/2023
DOB NOWSprinklersSigned-offMackler Master Fire12/27/2022
DOB NOWSprinklersSigned-offMackler Master Fire12/26/2022
DOB NOWPlumbingSigned-offA&A Plumbing12/16/2022
DOB NOWPlumbingSigned-offJames Cruz11/09/2022
DOB NOWGeneral ConstructionSigned-offFolor10/27/2022
DOB NOWStructuralSigned-offAllertonfox Construction10/25/2022
DOB NOWMechanical SystemsSigned-offAllertonfox Construction10/25/2022
DOB NOWMechanical SystemsSigned-offFolor10/25/2022
DOB NOWGeneral ConstructionSigned-offAllertonfox Construction10/25/2022
DOB NOWPlumbingSigned-offJames Cruz10/21/2022
+ 60 more permits on file
2 projects · most recent 08/02/2022
Others Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/02/2022Permit IssuedFolorOthers
Other
N/A N/A
12/22/2020Permit IssuedFolorAir Conditioning Systems
Cooling
Mitsubishi Electric PUMY-P48NKMU2 48,000 BTU · Vrf Outdoor ×4
Aaon RN-016-8-0-EB09-12A 199,410 BTU · Rooftop Unit ×2
2 projects · most recent 02/15/2023
FiledStatusContractorScope
02/15/2023Signed-offStandard Fire Protection—
04/26/2022———
2 projects · most recent 02/15/2023
Water/Sanitary Gas
FiledStatusContractorScope
02/15/2023Permit IssuedGeorge Breslaw PlumbingGas, Water/Sanitary
08/02/2022——Water/Sanitary
25 projects · most recent 09/01/2026
General Wiring Lighting
FiledStatusContractorScope
09/01/2026Permit IssuedM.C. Electrical NY—
04/10/2026CompleteAxcel Electric Co—
06/19/2024CompleteEmpire State Electric Maintenance—
03/23/2024CompleteAxcel Electric CoGeneral Wiring
11/03/2023CompleteM.C. Electrical NY—
08/11/2023CompleteAxcel Electric Co—
06/15/2023CompleteBorowide Elect'l Contractors—
11/02/2022Permit IssuedM.C. Electrical NYGeneral Wiring
10/24/2022CompleteEco Electrical ServcsGeneral Wiring, Lighting
09/21/2022Permit IssuedRainbow Electric Co—
09/21/2022Permit IssuedRainbow Electric Co—
06/30/2022Permit IssuedAllcom ElectricGeneral Wiring
06/22/2022Permit IssuedAll State Electric CnstctGeneral Wiring
01/03/2022CompleteSigns Cad—
08/27/2021CompleteSigns Cad—
1 project · most recent 05/26/2021
FiledStatusContractorScope
05/26/2021Permit IssuedDoria1 scope_items
1 project · most recent 06/07/2023
Scaffold
FiledStatusContractorScope
06/07/2023Permit IssuedAtlas Construction of NYScaffold
2 projects · most recent 08/13/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/13/2024Permit Issued——
01/04/2024Permit IssuedAtlas Construction of NYSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 36
DateTypeResultReport
01/23/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/31/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
05/18/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/16/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/08/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
01/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/12/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/07/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/07/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/21/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/16/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
Latest 25 of 36.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/11/2026Sprayed fire-resistant materialsJulian Saavedraspecial
05/11/2026Fire-Resistant Penetrations and JointsJulian Saavedraspecial
06/23/2023Post-installed AnchorsLeo Leespecial
04/04/2023Shutoff dampersYoung Suhenergy_progress
04/04/2023HVAC and service water heating system controls Young Suhenergy_progress
04/04/2023Mechanical SystemsYoung Suhspecial
04/04/2023FinalYoung Suhprogress
04/04/2023Electrical motorsYoung Suhenergy_progress
04/04/2023HVAC and service water heating equipment Young Suhenergy_progress
04/04/2023HVAC insulation and sealing Young Suhenergy_progress
04/04/2023Maintenance informationYoung Suhenergy_progress
02/16/2023High-Pressure Fuel-Gas Piping (Welding)Christopher Drutjonsspecial
02/16/2023HVAC-R and service water heating system controlsCAESAR BUSTAMANTEenergy_progress
02/16/2023Duct leakage testing, insulation and designCAESAR BUSTAMANTEenergy_progress
02/16/2023Lighting controlsCAESAR BUSTAMANTEenergy_progress
02/16/2023Interior lighting powerCAESAR BUSTAMANTEenergy_progress
02/16/2023HVAC-R and service water heating equipmentCAESAR BUSTAMANTEenergy_progress
02/16/2023HVAC-R and service water piping design and insulationCAESAR BUSTAMANTEenergy_progress
02/16/2023FinalCAESAR BUSTAMANTEprogress
02/16/2023Energy Code Compliance InspectionsCAESAR BUSTAMANTEprogress
02/16/2023Mechanical SystemsCAESAR BUSTAMANTEspecial
02/15/2023FinalJay Lubowprogress
02/15/2023Standpipe SystemsChristopher Drutjonsspecial
02/15/2023Sprinkler SystemsChristopher Drutjonsspecial
02/15/2023Fire-Resistant Penetrations and JointsCAESAR BUSTAMANTEspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
GCS & UBSOfficeFloors 1, 2, 5, 6, 10, 12–19, 22–24, Roof
Project M00739676 Alteration · LOC Issued · 10/25/2022
Project M00791826 Alteration · LOC Issued · 10/17/2022
Project M00696489 Alteration · Approved · 08/03/2022
Project M00696453 Alteration · Permit Entire · 08/02/2022
Project M00698807 Alteration · Approved · 08/02/2022
Project M00705515 Alteration · Approved · 08/02/2022
Project M00727810 Alteration · Approved · 08/02/2022
Project M00699675 Alteration · LOC Issued · 04/26/2022
Project M00700501 Alteration · Approved · 04/26/2022
Project M00233403 Alteration · Permit Entire · 11/12/2020
Project M00392567 Alteration · LOC Issued · 09/15/2020
Project M00392580 Alteration · LOC Issued · 09/15/2020
Bobby Van's GrillRestaurant / Food ServiceCellar, Floors 1–3
Project M00791841 Alteration · LOC Issued · 10/13/2022
Project M00791918 Alteration · LOC Issued · 10/13/2022
Project M00791922 Alteration · LOC Issued · 10/13/2022
Project M00534562 Alteration · LOC Issued · 06/23/2021
Project M00534564 Alteration · LOC Issued · 06/22/2021
Ground CentralRestaurant / Food ServiceFloor 1
Project M07997637 Alteration · LOC Issued · 09/12/2022
Project M00632402 Alteration · LOC Issued · 03/15/2022
Project M00632449 Alteration · LOC Issued · 03/15/2022
Urban HawkerRestaurant / Food Service—
Project M00793535 Alteration · LOC Issued · 09/02/2022
R2NetOfficeFloor 4
Project M00722378 Alteration · LOC Issued · 05/25/2022
Project M00721783 Alteration · LOC Issued · 05/24/2022
Project M00722187 Alteration · LOC Issued · 05/24/2022
UrbanspaceRestaurant / Food ServiceCellar, Floor 1
Project M00528671 No Work · Approved · 01/11/2022
Project M00532994 Alteration · LOC Issued · 08/30/2021
Project M00536296 Alteration · LOC Issued · 06/18/2021
Project M00524749 Alteration · LOC Issued · 06/17/2021
Project M00522440 Alteration · LOC Issued · 06/14/2021
Project M00522486 Alteration · LOC Issued · 06/14/2021
Project M00524793 Alteration · LOC Issued · 06/14/2021
Melt ShopRestaurant / Food ServiceFloor 1
Project M00631457 Alteration · LOC Issued · 11/19/2021
MazarsOfficeFloors 16–19
Project M00423820 Alteration · LOC Issued · 11/22/2020
Project M00423774 Alteration · LOC Issued · 11/20/2020
Project M00345851 Alteration · LOC Issued · 06/04/2020
Project M00346944 Alteration · LOC Issued · 06/04/2020
IndustriousOfficeFloor 2
Project M00428012 Alteration · LOC Issued · 11/20/2020
Project M00386532 Alteration · LOC Issued · 09/08/2020
Project M00388252 Alteration · LOC Issued · 09/08/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,178 on file (BIS + DOB NOW)
▸Plans & Drawings131
▸DOB NOWPlans/Sketch61
09/06/2026M00002926-I1Request digital key ↗
09/06/2026M00028717-I1Request digital key ↗
09/06/2026M00084442-I1Request digital key ↗
Showing 3 of 61 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler16
09/05/2026M00229780-P1Request digital key ↗
09/05/2026M00229780-I1Request digital key ↗
09/05/2026M00229411-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Plumbing15
09/05/2026M00230785-I1Request digital key ↗
09/04/2026M00346944-I1Request digital key ↗
09/04/2026M00366262-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems14
09/05/2026M00229360-P1Request digital key ↗
09/05/2026M00229360-I1Request digital key ↗
09/05/2026M00295620-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Standpipe7
09/05/2026M00229411-P1Request digital key ↗
09/05/2026M00229411-I1Request digital key ↗
09/05/2026M00296179-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly6
09/04/2026M00426758-P1Request digital key ↗
09/04/2026M00426758-P3Request digital key ↗
09/04/2026M00426758-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/04/2026M00401222-I1Request digital key ↗
09/04/2026M00401228-I1Request digital key ↗
09/04/2026M00401202-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
09/03/2026M00536267-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/04/2026M00227888-S1Request digital key ↗
09/04/2026M00227888-I1Request digital key ↗
09/04/2026M00227888-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00158008-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00237822-I1Request digital key ↗
▸Applications & Permits548
▸BISPLAN / WORK APPROVAL APPLICATION323
09/05/2023123849791Open ↗
08/02/2023123687484Open ↗
03/22/2023123858227Open ↗
Showing 3 of 323 on file for this type
▸BISWORK PERMIT APPLICATION215
06/17/2021141002938Open ↗
12/21/2020140971367Open ↗
12/12/2020140982328Open ↗
Showing 3 of 215 on file for this type
▸BISPLACE OF ASSEMBLY5
06/15/2021121688986Open ↗
05/20/2021121688986Open ↗
Showing 2 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION5
07/20/2021140971367Open ↗
03/29/2021121205427Open ↗
Showing 2 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM3
12/23/2021121205427Open ↗
Showing 1 of 3 on file for this type
▸Seals & Professional Certifications893
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION364
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 364 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature121
09/06/2026M00002926-I1Open ↗
09/06/2026M00028717-I1Open ↗
09/05/2026M00229780-I1Open ↗
Showing 3 of 121 on file for this type
▸DOB NOWProgress Inspector Seal & Signature105
09/29/2026M00295680-I1Open ↗
09/23/2026M00229360-I1Open ↗
09/23/2026M00229360-I1Open ↗
Showing 3 of 105 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST85
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 85 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature78
10/04/2026M00524793-P1Open ↗
09/23/2026M00229360-I1Open ↗
09/23/2026M00632449-I1Open ↗
Showing 3 of 78 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT77
06/15/2021141002938Open ↗
11/25/2020140982328Open ↗
Showing 2 of 77 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
06/15/2021141002938Open ↗
Showing 1 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
06/15/2021141002938Open ↗
11/25/2020140982328Open ↗
Showing 2 of 8 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment253
▸BISSELF-CERT PLUMBING NOTICE68
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 68 on file for this type
▸BISSCHEDULE B - PLUMBING58
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 58 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA27
04/20/2022123457963Open ↗
Showing 1 of 27 on file for this type
▸BISEQUIPMENT USE PERMITS21
07/27/2021123780462Open ↗
07/27/2021123780462Open ↗
07/27/2021123780462Open ↗
Showing 3 of 21 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT19
07/27/2021123780462Open ↗
07/20/2021123780462Open ↗
Showing 2 of 19 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8511
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSIGN HANGER CERTIFICATE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST8
12/21/2020140971367Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos248
▸BISASBESTOS: CERTIFICATION (DEP ACP5)104
11/25/2020140982328Open ↗
Showing 1 of 104 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report85
09/06/2026M00002926-I1Open ↗
09/05/2026M00229780-I1Open ↗
09/05/2026M00229780-P1Open ↗
Showing 3 of 85 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'36
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 36 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/02/2026M00722187-I1Open ↗
09/02/2026M00722378-I1Open ↗
Showing 2 of 4 on file for this type
▸Energy Compliance172
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS68
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 68 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS34
08/18/2022123821007Open ↗
08/13/2021140907605Open ↗
08/12/2021140982328Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY24
08/18/2022123821007Open ↗
01/25/2022141002938Open ↗
11/22/2021140971367Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: ENERGY12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS8
06/15/2021141002938Open ↗
11/25/2020140982328Open ↗
Showing 2 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)7
03/29/2023123849791Open ↗
02/22/2023123687475Open ↗
02/22/2023123858227Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis5
09/02/2026M00632449-I1Open ↗
09/02/2026M00699675-I1Open ↗
09/02/2026M00722187-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS4
03/29/2023123760849Open ↗
02/22/2023123858227Open ↗
02/22/2023123731603Open ↗
Showing 3 of 4 on file for this type
▸BISFENESTRATION AREAS2
02/22/2023123858227Open ↗
02/22/2023123858227Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports54
▸BISTECHNICAL REPORT: RESPONSIBILITY48
03/02/2023123731603Open ↗
02/23/2023123731603Open ↗
08/18/2022123821007Open ↗
Showing 3 of 48 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
03/29/2023123849791Open ↗
02/22/2023123687475Open ↗
09/26/2022123760849Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Approvals, Objections & Sign-offs215
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST122
09/05/2023123849791Open ↗
03/23/2023123687475Open ↗
03/23/2023123858227Open ↗
Showing 3 of 122 on file for this type
▸BISADMINISTRATIVE OBJECTIONS46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE20
08/24/2022140971367Open ↗
07/20/2022140971367Open ↗
08/11/2021121205427Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL4
08/02/2023123849791Open ↗
02/22/2023123858227Open ↗
02/22/2023123731603Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership291
▸BISCOST AFFIDAVIT280
08/18/2022123821007Open ↗
04/28/2022123457963Open ↗
04/28/2022123457963Open ↗
Showing 3 of 280 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
08/02/2023123849791Open ↗
03/29/2023123760849Open ↗
02/22/2023123687475Open ↗
Showing 3 of 8 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
10/06/2022123916450Open ↗
10/06/2022123916450Open ↗
Showing 2 of 3 on file for this type
▸Filing & Intake Forms269
▸BISEFILING COVER SHEET137
10/06/2022123916450Open ↗
Showing 1 of 137 on file for this type
▸BISBOROUGH INTAKE FORM77
10/06/2022123916450Open ↗
Showing 1 of 77 on file for this type
▸BISADDITIONAL INFORMATION46
09/07/2022140971367Open ↗
08/22/2022140971367Open ↗
07/20/2022140971367Open ↗
Showing 3 of 46 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
06/15/2021141002938Open ↗
Showing 1 of 9 on file for this type
▸Other Documents47
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION28
11/07/2022123916450Open ↗
11/07/2022123916450Open ↗
11/01/2022123916450Open ↗
Showing 3 of 28 on file for this type
▸BISPLOT DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAI-1 ACCEPTED3
02/16/2021121205427Open ↗
02/16/2021121205427Open ↗
02/16/2021121205427Open ↗
▸DOB NOWAlternate Plan 32
09/04/2026M00426758-P3Open ↗
09/04/2026M00426758-I1Open ↗
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 22
09/04/2026M00426758-P3Open ↗
09/04/2026M00426758-I1Open ↗
▸DOB NOWSupporting Document 11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSupporting Document 21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type