← Back
BuildNYC
Elevator apt, semi-fireproof without stores
135 WOODBINE STREET
BROOKLYN · BIN 3326156
💬 Discuss this project
0Year Built
—Stories
D1Building Class
R6Zoning
9,290 sfGross Floor Area
9Units
6 Active Violations 5 unresolved · 1 paperwork only 2 old, status unconfirmed ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Woodbine Ave Partners · 3,000 sf lot · 3.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof22p · 3 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 5Convert Existing 1 Family to 9 Family Dwelling Unit55p · 5 filings · 20 docs
Floor 4Convert Existing 1 Family to 9 Family Dwelling Unit55p · 5 filings · 20 docs
Floor 3Convert Existing 1 Family to 9 Family Dwelling Unit54p · 5 filings · 20 docs
Floor 2Convert Existing 1 Family to 9 Family Dwelling Unit58p · 6 filings · 20 docs
Floor 1Sidewalk shed installation55p · 8 filings · 20 docs
CellarConvert Existing 1 Family to 9 Family Dwelling Unit55p · 6 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
Filed — no permit issued12p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Roy Coleman Trust3207/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM Expediting Drafting Design1403/21/2026
Bealin Groups1203/21/2026
Prime Zone Building Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PJB ConstructionGeneral Contractor1507/08/2026
PJB ConstructionScaffold604/09/2026
NYC Builders & RenovationGeneral Contractor303/21/2026
Maruti ContractingScaffold303/21/2026
AM Expediting DraftingScaffold207/08/2026
Aujla ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Triangle Inspection & Tes7495802/25/2025
NKM Engineering6244310/07/2024
Adroit Engineering8885107/22/2024
Building Lifecycle
10/07/2026
At time of inspection observed: sidewalk shed in place at expo# 1 with permit# B01152542-I1-sh upon review department record it appear permit…
ECB violation · open
10/07/2026
At time of inspection observed: construction fence in place at exposure#1-2-4 with permit# B00284353-I1-fn. Upon reviewing department records it…
ECB violation · open
08/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/30/2026
Permit expired, never signed off — Construction Fence
The city's record still shows this permit as issued, with no sign-off on its filing
B00284353-I1-FN
109 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPJB Construction01/14/2026
DOB NOWConstruction FencePermit IssuedPJB Construction01/05/2026
DOB NOWSupported ScaffoldSigned-offMaruti Contracting07/24/2025
DOB NOWStructuralPermit IssuedPJB Construction07/24/2025
DOB NOWFoundationPermit IssuedPJB Construction07/23/2025
DOB NOWStructuralPermit IssuedPJB Construction03/25/2025
DOB NOWFoundationPermit IssuedPJB Construction03/25/2025
DOB NOWSupport of ExcavationPermit IssuedPJB Construction02/27/2025
DOB NOWStructuralPermit IssuedPJB Construction02/17/2025
DOB NOWSidewalk ShedPermit IssuedPJB Construction12/30/2024
DOB NOWConstruction FencePermit IssuedPJB Construction12/24/2024
DOB NOWFull DemolitionSigned-offPJB Construction12/24/2024
DOB NOWGeneral ConstructionPermit IssuedNYC Builders & Renovation04/09/2024
DOB NOWConstruction FencePermit IssuedAM Expediting Drafting02/15/2024
DOB NOWConstruction FencePermit IssuedAM Expediting Drafting01/29/2020
BISOTISSUEDPJB Construction09/22/2021
BISOTISSUEDAM Expediting Drafting12/18/2019
1 project · most recent 09/04/2019
FiledStatusContractorScope
09/04/2019———
1 project · most recent 09/04/2019
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/04/2019——Gas, Storm, Water/Sanitary
1 project · most recent 01/13/2025
FiledStatusContractorScope
01/13/2025Permit IssuedAujla Electric—
3 projects · most recent 02/25/2025
Steel Masonry
FiledStatusContractorScope
02/25/2025Permit IssuedPJB ConstructionSteel, Masonry
12/07/2023———
08/31/2021——Steel
1 project · most recent 12/09/2024
Sidewalk Shed
FiledStatusContractorScope
12/09/2024Permit IssuedPJB ConstructionSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
03/10/2025Excavations - Sheeting, Shoring, and BracingRajasekhar Sakhamurispecial
03/05/2025Designated Seismic SystemRajasekhar Sakhamurispecial
03/05/2025FinalRajasekhar Sakhamuriprogress
03/05/2025Footing and FoundationRajasekhar Sakhamuriprogress
03/05/2025Concrete - Cast-In-PlaceRajasekhar Sakhamurispecial
03/04/2025Structural Steel - DetailsRajasekhar Sakhamurispecial
03/04/2025FinalRajasekhar Sakhamuriprogress
03/04/2025MasonryRajasekhar Sakhamurispecial
03/04/2025Designated Seismic SystemRajasekhar Sakhamurispecial
03/04/2025Structural Cold-Formed SteelRajasekhar Sakhamurispecial
02/24/2025Designated Seismic System—special
02/21/2025Concrete - Cast-In-PlaceRajasekhar Sakhamurispecial
02/21/2025FinalRajasekhar Sakhamuriprogress
02/21/2025Footing and FoundationRajasekhar Sakhamuriprogress
02/21/2025Excavations - Sheeting, Shoring, and BracingRajasekhar Sakhamurispecial
10/24/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/24/2024Lighting controlsNARESH MAHANGUenergy_progress
10/24/2024Permanent certificateNARESH MAHANGUenergy_progress
10/24/2024Lighting in dwelling unitsNARESH MAHANGUenergy_progress
10/24/2024MeteringNARESH MAHANGUenergy_progress
10/24/2024Fenestration air leakageNARESH MAHANGUenergy_progress
10/24/2024Fenestration areasNARESH MAHANGUenergy_progress
10/24/2024Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
10/24/2024Insulation placement and R valuesNARESH MAHANGUenergy_progress
10/24/2024Interior lighting powerNARESH MAHANGUenergy_progress
Latest 25 of 57.
169 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account