| Owner | Filings | Most Recent |
|---|---|---|
| ESRT | 11 | 09/13/2026 |
| EMPIRE STATE REALTY TRUST | 355 | 07/08/2026 |
| BANCO SANTANDER | 3 | 03/22/2026 |
| 1350 BROADWAY | 111 | 03/22/2026 |
| 1350 BDWY LLC | 1 | 03/22/2026 |
| D.N.A. CONT LLC SUITE 801 | 1 | 03/22/2026 |
| GSL ENTERPRISES | 9 | 03/22/2026 |
| HELMSET SPEAR INC | 1 | 03/22/2026 |
| HELMSLEY SPEAL INC | 1 | 03/22/2026 |
| GSL EMTERPROSES INC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| FL&M ENGINEERING DESIGN &INSPECTION | 3 | 09/09/2026 |
| LAWRENCE K. SHAPIRO & ASSOCIATES | 2 | 07/02/2026 |
| PCS ENGINEERING | 3 | 11/21/2025 |
| GOLDMAN COPELAND ASSOCIATES | 88 | 11/05/2025 |
| SDGA, PLLC | 1 | 11/05/2025 |
| ASHRAF CORP | 2 | 09/23/2025 |
| STUDIO HUJI | 3 | 09/03/2025 |
| LONGO ARCHITECTS & ASSOCIATES, LLC | 2 | 08/15/2025 |
| ANTHONY J. VARANO, PE | 2 | 08/14/2025 |
| NELSON ARCHITECTURE &INTERIORS, INC | 19 | 07/29/2025 |
| THORNTON TOMASETTI | 7 | 07/28/2025 |
| LORING CONSULTING ENGINEERS, INC. | 2 | 07/17/2025 |
| GRM CONSULTANTS LLC | 7 | 06/05/2025 |
| MSM ENGINEERING SERVICES, PLLC | 1 | 04/30/2025 |
| THE ROCK BROOK CONSULTING GROUP, PA | 3 | 04/01/2025 |
| FIFIELD PIAKER ELMAN ARCHITECTS P.C | 2 | 02/27/2025 |
| KAHN ARCHITECTURE & DESIGN PC | 1 | 01/15/2025 |
| LUBRANO CIAVARRA ARCHITECTS, PLLC | 1 | 11/14/2023 |
| THEODORE LAURENCE STRAUSS ASSOC | 4 | 04/10/2023 |
| ALPHA HOME DESIGN LLC | 2 | 12/08/2022 |
| NEWTEC ENGINEERING | 2 | 10/25/2022 |
| BIANCA V. SKVIRSKY, PE | 2 | 07/29/2022 |
| BUROHAPPOLD | 3 | 05/31/2022 |
| GENSLER | 1 | 05/24/2022 |
| GREEN DESIGN | 1 | 04/15/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 134 | 03/21/2026 |
| LOUIS STRIAR | 24 | 03/21/2026 |
| FRANK BUENO EXPEDITING | 8 | 03/21/2026 |
| RIGGING CONSULTANTS | 6 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 4 | 03/21/2026 |
| INDESIGN STUDIO | 4 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| J. PHELAN CONSTRUCTION CO | General Contractor | 30 | 07/08/2026 |
| RINNOVO CONSTRUCTION, LLC | General Contractor | 16 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 16 | 07/08/2026 |
| DENKO MECHANICAL INC | Fire Protection | 16 | 07/08/2026 |
| J.A. JENNINGS, INC | General Contractor | 14 | 07/08/2026 |
| EXCEL INTERIOR CONSTRUCTION | General Contractor | 13 | 07/08/2026 |
| FOLOR INC | General Contractor | 11 | 07/08/2026 |
| L S SIGN | Scaffold | 7 | 07/08/2026 |
| VANGUARD CONSTRUCTION AND | General Contractor | 7 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 7 | 07/08/2026 |
| LEGACY BUILDERS/DEVELOPERS CORP | General Contractor | 7 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 6 | 07/08/2026 |
| FINALY GENL CONTR CORP | General Contractor | 6 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 6 | 07/08/2026 |
| A.G.S IMPROVEMENTS INC | General Contractor | 6 | 03/21/2026 |
| LHOTSE CORP | General Contractor | 5 | 07/08/2026 |
| BEVILACQUA, JOSEPH | Electrical | 5 | 03/21/2026 |
| TORRES, HECTOR | Electrical | 5 | 03/21/2026 |
| PSI PARTNERS, LLC | Fire Protection | 5 | 07/08/2026 |
| URBAN CONSTR & DESIGN LLC | General Contractor | 4 | 07/08/2026 |
| CROSSLAND MECHANICAL INC | General Contractor | 4 | 07/08/2026 |
| EMPIRE STATE ELEC MAINT & | Electrical | 4 | 03/22/2026 |
| PERRY MECHANICAL CONTRACT | General Contractor | 3 | 03/21/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 3 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| DELTA TESTING LABS | 687 | 2 | 07/02/2026 |
| PCS ENGINEERING | 3745 | 3 | 11/21/2025 |
| CODEGREEN | 510 | 104 | 11/05/2025 |
| SAG ENGINEERING & CONSULT | 608 | 5 | 08/14/2025 |
| DOMANI INSPECTION SERVICE | 843 | 1 | 11/17/2023 |
| JOSEPH BOTTA, PE, PC | 1139 | 4 | 04/10/2023 |
| OBAID MIAN | 849 | 1 | 03/22/2022 |
| ESNYC CONSULTING INC | 4099 | 1 | 07/17/2020 |
| AKS ARCHITECTURAL & ENGIN | 1957 | 2 | 05/11/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Signed-off | LHOTSE CORP | 09/03/2026 |
| DOB NOW | Construction Fence | Permit Issued | MC SUPERSTRUCTURE INC | 08/20/2026 |
| DOB NOW | Construction Fence | Permit Issued | MC SUPERSTRUCTURE INC | 08/20/2026 |
| DOB NOW | Sign | Signed-off | ULTIMATE SIGNS&DESIGNS CO | 07/22/2026 |
| DOB NOW | Sign | Permit Issued | ULTIMATE SIGNS&DESIGNS CO | 07/22/2026 |
| DOB NOW | Sign | Signed-off | ULTIMATE SIGNS&DESIGNS CO | 07/22/2026 |
| DOB NOW | Structural | Permit Issued | VANGUARD CONSTRUCTION AND | 07/06/2026 |
| DOB NOW | General Construction | Permit Issued | VANGUARD CONSTRUCTION AND | 07/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | VANGUARD CONSTRUCTION AND | 07/02/2026 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 04/27/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 04/27/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | DYNAMIC HOISTING SCAFF IN | 03/16/2026 |
| DOB NOW | General Construction | Signed-off | WHALEN CONSTRUCTION, INC | 11/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | WHALEN CONSTRUCTION, INC | 11/12/2025 |
| DOB NOW | Sprinklers | Signed-off | FIVE BOROUGH NYC LLC | 11/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | DYNAMIC HOISTING SCAFF IN | 10/22/2025 |
| DOB NOW | Sign | Permit Issued | CAPITOL DESIGN & MAINT IN | 09/17/2025 |
| DOB NOW | Sign | Signed-off | CAPITOL DESIGN & MAINT IN | 09/17/2025 |
| DOB NOW | Sign | Signed-off | CAPITOL DESIGN & MAINT IN | 09/17/2025 |
| DOB NOW | Structural | Signed-off | J PHELAN CONSTRUCTION | 08/13/2025 |
| DOB NOW | General Construction | Permit Issued | J PHELAN CONSTRUCTION | 07/28/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 07/25/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | J PHELAN CONSTRUCTION | 07/25/2025 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 07/08/2025 |
| DOB NOW | General Construction | Permit Issued | LHOTSE CORP | 06/13/2025 |
| DOB NOW | General Construction | Permit Issued | LHOTSE CORP | 06/13/2025 |
| DOB NOW | Sign | Permit Issued | WEINFELD, ELLIOT | 06/11/2025 |
| DOB NOW | Sign | Permit Issued | WEINFELD, ELLIOT | 06/11/2025 |
| DOB NOW | Sign | Permit Issued | WEINFELD, ELLIOT | 06/11/2025 |
| DOB NOW | Sign | Permit Issued | WEINFELD, ELLIOT | 06/11/2025 |
| DOB NOW | Sign | Permit Issued | WEINFELD, ELLIOT | 06/11/2025 |
| DOB NOW | Sign | Permit Issued | WEINFELD, ELLIOT | 06/11/2025 |
| DOB NOW | Sign | Permit Issued | WEINFELD, ELLIOT | 06/11/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | LHOTSE CORP | 06/06/2025 |
| DOB NOW | General Construction | Permit Issued | J PHELAN CONSTRUCTION | 06/03/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 05/01/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 05/01/2025 |
| DOB NOW | Structural | Permit Issued | VANGUARD CONSTRUCTION AND | 04/17/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 04/09/2025 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 04/09/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/14/2025 | Permit Issued | J. PHELAN CONSTRUCTION CO | Heating and Air Conditioning Systems | Heat / Cool Sigma CSC VERTICAL AIR COOLED SDSV-D.1-240 251,000 BTU · Wshp ×4 |
| 01/16/2025 | Permit Issued | RINNOVO CONSTRUCTION, LLC | Air Conditioning Systems, Ventilation Systems | Cooling Aaon V3-ERB-8-0-26FA-12F 232,200 BTU · Fan Coil Indoor ×2 V3-DRB-8-0-26FC-12H 163,600 BTU · Fan Coil Indoor ×1 |
| 06/14/2023 | Permit Issued | EXCEL INTERIOR CONSTRUCTI | Air Conditioning Systems | Cooling Aaon V3-CRB-8-0-24HC-000 84,400 BTU · Fan Coil Indoor ×1 |
| 02/27/2020 | Permit Issued | J.A. JENNINGS, INC | Air Conditioning Systems | Cooling Aaon V3-CRB-8-8 84,480 BTU ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/05/2025 | Signed-off | FIVE BOROUGH NYC LLC | 4 heads |
| 07/29/2025 | Permit Issued | PSI PARTNERS, LLC | 135 heads |
| 07/17/2025 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 4 heads |
| 04/01/2025 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 34 heads |
| 09/25/2023 | — | — | — |
| 09/21/2023 | Permit Issued | DENKO MECHANICAL INC | — |
| 05/31/2022 | Permit Issued | A + SPRINKLER CORP | 140 heads |
| 05/11/2020 | — | — | 3 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/05/2025 | — | — | — |
| 07/17/2025 | — | — | — |
| 05/11/2020 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/10/2026 | Permit Issued | BDS ELECTRIC CORP. | General Wiring |
| 09/04/2026 | Complete | OFF SHORE ELECTRIC CORP | General Wiring |
| 08/19/2026 | Permit Issued | ULTIMATE SIGNS & ELEC COR | — |
| 08/19/2026 | Permit Issued | ULTIMATE SIGNS & ELEC COR | — |
| 08/03/2026 | Permit Issued | NASH ELECTRIC SERVICES IN | — |
| 05/08/2026 | Permit Issued | BIGMAN BROS., INC. | — |
| 03/23/2026 | Complete | RONAN ELECTRICAL LLC | General Wiring |
| 10/15/2025 | Complete | HUNTER ELECTRIC, INC. | — |
| 04/23/2025 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 01/28/2025 | Complete | DENMAR ELECTRIC CORP | General Wiring |
| 10/07/2024 | Complete | HUNTER ELECTRIC, INC. | — |
| 08/23/2024 | Complete | OFF SHORE ELECTRIC CORP | General Wiring |
| 08/09/2024 | Complete | OFF SHORE ELECTRIC CORP | General Wiring |
| 02/02/2024 | Complete | OFF SHORE ELECTRIC CORP | General Wiring |
| 02/02/2024 | Complete | OFF SHORE ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2025 | Permit Issued | VANGUARD CONSTRUCTION AND | Steel |
| 07/12/2022 | Permit Issued | JRM CONSTRUCTION MGMT LLC | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | Permit Issued | MC SUPERSTRUCTURE INC | Fence, Sidewalk Shed |
| 07/02/2026 | — | — | Sidewalk Shed |
| 09/23/2025 | Signed-off | ANDAMIO SCAFFOLDING LLC | Scaffold |
| 08/15/2025 | Permit Issued | VANGUARD CONSTRUCTION AND | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/21/2025 | Signed-off | LHOTSE CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/30/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/15/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/08/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/19/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/08/2025 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 11/10/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/05/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 10/29/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/27/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/23/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 09/22/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/22/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/10/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/09/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/02/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/02/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/19/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/13/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/23/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/23/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/14/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 07/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/13/2026 | Post-installed Anchors | RICHARD GREENWALD | special |
| 11/13/2025 | Alternative Materials - OTCR Buildings Bulletin Number | Michael Walsh | special |
| 11/13/2025 | Post-installed Anchors | Michael Walsh | special |
| 10/30/2025 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 10/22/2025 | Duct leakage testing, insulation and design | HATIM ELSAID | energy_progress |
| 10/22/2025 | Interior lighting power | HATIM ELSAID | energy_progress |
| 10/22/2025 | Lighting controls | HATIM ELSAID | energy_progress |
| 10/22/2025 | Ventilation and air distribution system | HATIM ELSAID | energy_progress |
| 10/22/2025 | Energy Code Compliance Inspections | HATIM ELSAID | progress |
| 10/22/2025 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 10/16/2025 | Alternative Materials - OTCR Buildings Bulletin Number | Michael Walsh | special |
| 10/16/2025 | Post-installed Anchors | Michael Walsh | special |
| 10/14/2025 | Final | HATIM ELSAID | progress |
| 10/14/2025 | Mechanical Systems | HATIM ELSAID | special |
| 10/14/2025 | Sprinkler Systems | HATIM ELSAID | special |
| 10/14/2025 | Final | HATIM ELSAID | progress |
| 09/03/2025 | Final | Ryan Hung | progress |
| 09/03/2025 | Final | Ryan Hung | progress |
| 09/03/2025 | Final | Ryan Hung | progress |
| 08/18/2025 | Post-installed Anchors | Chester Kowalski | special |
| 08/18/2025 | Energy Code Compliance Inspections | Chester Kowalski | progress |
| 08/18/2025 | Structural Steel - Details | Chester Kowalski | special |
| 08/18/2025 | Sprayed fire-resistant materials | Chester Kowalski | special |
| 08/18/2025 | Structural Steel - Welding | Chester Kowalski | special |
| 08/18/2025 | Structural Steel - High Strength Bolting | Chester Kowalski | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Skip Hop | Retail | — | Project M01208756 Project M01208757 Project M01208752 Project M01208753 Project M01208754 Project M01208755 Project M01208758 |
| WF Branch | Retail | Cellar, Floor 1 | Project M01179539 Project M01179556 |
| Carter's | Office | Floor 2 | Project M01167476 Project M01158392 |
| Nutanix | Office | Floor 10 | Project M00215129 |