Zoned residential, not Manhattan
1355 CLINTON AVENUE
BRONX · BIN 2131017
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · Owner of record: NKLRB LLC · 2,175 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof16p · 1 filing · 20 docs
Floor 412p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALL TO WALL CONSTRUCTION CORP4207/08/2026
ACE GROUP NY CORP.703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2022$290K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRID DRAFTING AND CONSULTING LLC1102/27/2025
VOLUME SPACE CONSULTING INC.102/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GRID DRAFTING AND CONSULTING LLC2203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALL TO WALL CONSTRUCTIO*General Contractor1607/08/2026
ACE GROUP NY CORPGeneral Contractor603/21/2026
DENNISON ELECTRIC CORPElectrical103/22/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795902/27/2025
Building Lifecycle
All (85)Filed (12)Permit Issued (12)Signed Off (9)Violation (5)Inspection (11)Objection (6)Special Inspection (30)
05/22/2026
Signed off — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-I1
04/27/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/01/2026
Signed off — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-S6
02/09/2026
Signed off — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-S4
02/09/2026
Signed off — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-S5
12/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/17/2025
Signed off — Alteration
Construction fence filed for construction of the new building.
X01112795-I1
10/21/2025
Permit issued — Mechanical Systems
X01112721-S6-MS
09/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/27/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/15/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01178923-I1
08/14/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/06/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/01/2025
Signed off — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-S2
08/01/2025
Signed off — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-S3
06/05/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2025
Permit issued — General Construction
X01112721-I1-GC
05/29/2025
Permit issued — Construction Fence
X01112795-I1-FN
04/22/2025
Permit issued — Sprinklers
X01112721-S5-EW-SP
04/04/2025
Violation issued (ECB, closed)
Unknown
04/04/2025
Violation issued (ECB, closed)
Unknown
04/04/2025
Violation issued (ECB, closed)
Site Safety
04/03/2025
Violation issued (ECB, closed)
Unknown
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
03/07/2025
Special inspection requirement — Sprinkler Systems
MICHAEL KARANTINIDIS, P.E.
02/27/2025
Filed — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-P3
02/27/2025
Filed — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-P2
02/27/2025
Signed off — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-S1
02/27/2025
Permit issued — Structural
X01112721-S3-ST
02/27/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
02/26/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MICHAEL KARANTINIDIS, P.E.
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
02/26/2025
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
02/26/2025
Special inspection requirement — Sprinkler Systems
MICHAEL KARANTINIDIS, P.E.
02/11/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01178923-I1
02/11/2025
Permit issued — Sidewalk Shed
X01178923-I1-SF
02/11/2025
Permit issued — Supported Scaffold
X01178923-I1-SH
02/10/2025
Permit issued — Plumbing
X01112721-S4-PL
01/29/2025
Objection resolved — Addressed
01/29/2025
Objection resolved — Addressed
01/28/2025
Objection raised — Structural
01/28/2025
Objection raised — Structural
01/23/2025
Filed — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-S3
01/21/2025
Violation issued (ECB, closed)
Construction
01/16/2025
Objection resolved — Addressed
01/10/2025
Permit issued — General Construction
X01112721-I1-GC
01/09/2025
Filed — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-P1
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/09/2025
Special inspection requirement — Sprinkler Systems
01/08/2025
Permit issued — Support of Excavation
X01112721-S1-SE
01/08/2025
Permit issued — Foundation
X01112721-S2-FO
12/12/2024
Objection raised — Mechanical
12/10/2024
Filed — New Building
Plumbing work in conjunction with NB application #X01112721-I1
X01112721-S6
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWALL TO WALL CONSTRUCTIO*10/21/2025
DOB NOWGeneral ConstructionPermit IssuedWALL TO WALL CONSTRUCTIO*06/04/2025
DOB NOWConstruction FenceSigned-offWALL TO WALL CONSTRUCTIO*05/29/2025
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C04/22/2025
DOB NOWStructuralSigned-offWALL TO WALL CONSTRUCTIO*02/27/2025
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP02/11/2025
DOB NOWSupported ScaffoldSigned-offACE GROUP NY CORP02/11/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/10/2025
DOB NOWGeneral ConstructionPermit IssuedWALL TO WALL CONSTRUCTIO*01/10/2025
DOB NOWSupport of ExcavationSigned-offWALL TO WALL CONSTRUCTIO*01/08/2025
DOB NOWFoundationSigned-offWALL TO WALL CONSTRUCTIO*01/08/2025
DOB NOWConstruction FenceSigned-offWALL TO WALL CONSTRUCTIO*10/15/2024
1 project · most recent 02/27/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/27/2025Signed-offWALL TO WALL CONSTRUCTIO*Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
General Electric AZ65H09DAB 8,100 BTU · Ptac ×9
AZ65H07DAB 6,200 BTU · Ptac ×6
Ventilation
Panasonic FV-0511VKS2 50 CFM · Exhaust Fan ×7
Summit ADAH1624W 100 CFM · Kitchen Exhaust ×7
1 project · most recent 02/27/2025
Sprinkler System
FiledStatusContractorScope
02/27/2025Signed-offGO PRO FIRE PROTECTION CSprinkler System
1 project · most recent 02/27/2025
Storm Water/Sanitary
FiledStatusContractorScope
02/27/2025Signed-offINFINITI ESC PLUMBING CORStorm, Water/Sanitary
1 project · most recent 12/12/2025
General Wiring
FiledStatusContractorScope
12/12/2025CompleteDENNISON ELECTRIC CORPGeneral Wiring
1 project · most recent 02/27/2025
Concrete Masonry
FiledStatusContractorScope
02/27/2025Signed-offWALL TO WALL CONSTRUCTIO*Concrete, Masonry
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/27/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/27/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/06/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/05/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
03/07/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
03/07/2025Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
02/26/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
02/26/2025HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
02/26/2025HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
02/26/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMICHAEL KARANTINIDIS, P.E.special
02/26/2025HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
02/26/2025Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
02/26/2025Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
02/26/2025Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
01/09/2025Fire-Resistant Penetrations and Joints—special
01/09/2025Sprinkler Systems—special
12/06/2024Duct leakage testing, insulation and designMICHAEL KARANTINIDIS, P.E.energy_progress
12/06/2024HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
12/06/2024HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
12/06/2024Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
12/06/2024Shutoff dampersMICHAEL KARANTINIDIS, P.E.energy_progress
12/06/2024HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
11/19/2024MeteringMICHAEL KARANTINIDIS, P.E.energy_progress
11/07/2024Excavations - Sheeting, Shoring, and BracingMICHAEL KARANTINIDIS, P.E.special
11/07/2024Concrete - Cast-In-PlaceMICHAEL KARANTINIDIS, P.E.special
11/07/2024Excavations - Sheeting, Shoring, and BracingMICHAEL KARANTINIDIS, P.E.special
11/07/2024Subsurface Conditions – Fill Placement & In-Place DensityMICHAEL KARANTINIDIS, P.E.special
09/20/2024Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
09/20/2024Energy Code Compliance InspectionsMICHAEL KARANTINIDIS, P.E.progress
Latest 25 of 42.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/20/2026X01112795-I1Request digital key ↗
08/20/2026X01112721-S4Request digital key ↗
08/20/2026X01112721-S3Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
10/09/2025240360907Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X01112721-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01112721-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026X01112721-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature27
08/28/2026X01112721-I1Open ↗
08/28/2026X01112721-I1Open ↗
08/28/2026X01112721-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/28/2026X01112721-I1Open ↗
08/28/2026X01112721-I1Open ↗
08/28/2026X01112721-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/20/2026X01112721-S3Open ↗
08/20/2026X01112721-S2Open ↗
08/20/2026X01112721-S1Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X01112721-I1Open ↗
▸Safety & Tenant Protection5
▸BISBPP: STREET TREES SITE PLAN1
01/03/2025240360907Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01112721-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01112721-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026X01112721-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01112721-I1Open ↗
▸Other Documents5
▸DOB NOWFinal Survey1
08/13/2026X01112721-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X01112721-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X01112721-S1Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026X01112721-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026X01112721-I1Open ↗