| Owner | Filings | Most Recent |
|---|---|---|
| ESRT | 21 | 09/24/2026 |
| EMPIRE STATE REALTY TRUST | 419 | 07/08/2026 |
| ESRT 1359 BROADWAY | 64 | 03/22/2026 |
| ERST 1359 BROADWAY | 1 | 03/22/2026 |
| SERVICE SIGN ERECTORS | 1 | 03/22/2026 |
| MARLBORO BUILDING ASSOCIATES | 168 | 03/22/2026 |
| NEWMARK COMPANY REAL ESTATE | 12 | 03/22/2026 |
| NEWMARK & COMPANY | 5 | 03/22/2026 |
| DNA CONTRACTING LLC | 1 | 03/22/2026 |
| NEWMARK KNIGHT FRANK | 119 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/07/2013 | $160.3M | — | MARLBORO BUILDING ASSOCIATES L.L.C. → ESRT 1359 BROADWAY, L.L.C. | $403/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| SY ENGINEERING PLLC | 14 | 04/23/2026 |
| GOLDMAN COPELAND ASSOCIATES | 82 | 09/15/2025 |
| JEFFREY DONAHUE ENG P.C. | 1 | 09/02/2025 |
| ANASTASIO ARCHITECTS | 1 | 08/28/2025 |
| ENV ARCHITECTS, DPC | 4 | 07/23/2025 |
| GILSANZ MURRAY STEFICEK LLP | 2 | 06/27/2025 |
| THORNTON TOMASETTI | 6 | 05/19/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 2 | 11/19/2024 |
| CATAPANO ENGINEERING PC | 13 | 10/22/2024 |
| ASHRAF CORP | 5 | 10/17/2024 |
| PCS ENGINEERING | 2 | 09/10/2024 |
| TPG ARCHITECTURE, LLP | 2 | 06/13/2024 |
| NELSON ARCHITECTURE &INTERIORS, INC | 9 | 01/02/2024 |
| VOCON | 4 | 10/23/2023 |
| IW ARCHITECTURE, PLLC | 3 | 08/31/2023 |
| SCHRIMMER DESIGN GROUP | 1 | 08/14/2023 |
| ROBERT DERECTOR ASSOCIATES | 2 | 07/12/2023 |
| APPLIED DESIGN INITIATIVE, LLC | 1 | 07/11/2023 |
| ENTHINK ENGINEERS LLC | 1 | 06/21/2023 |
| FIFIELD PIAKER ELMAN ARCHITECTS P.C | 2 | 09/01/2022 |
| ABEL DESIGN GROUP | 1 | 05/19/2022 |
| SHAABAN ENGINEERING, LLC | 2 | 08/20/2021 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 1 | 07/15/2021 |
| WILLIAM F. COLLINS ARCHITECTS | 2 | 04/08/2021 |
| MG ENGINEERING D.P.C. | 4 | 01/03/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 137 | 03/21/2026 |
| NEW YORK SIGN CONSULTANTS | 6 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 2 | 03/21/2026 |
| RIGGING CONSULTANTS | 6 | 03/21/2026 |
| CATAPANO ENGINEERING | 26 | 03/21/2026 |
| NATIONAL MAINTENANCE | 4 | 03/21/2026 |
| BUILDING BROTHERS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| FINALY GENL CONTR CORP | General Contractor | 19 | 07/08/2026 |
| RINNOVO CONSTRUCTION, LLC | General Contractor | 17 | 07/08/2026 |
| J.A. JENNINGS, INC | General Contractor | 13 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 12 | 07/08/2026 |
| DENKO MECHANICAL INC | Fire Protection | 10 | 07/08/2026 |
| FOLOR INC | General Contractor | 10 | 03/21/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 8 | 07/08/2026 |
| ALCHEMY DEVELOPMENT | General Contractor | 8 | 07/08/2026 |
| A.W. & S. CONSTRUCTION CO | General Contractor | 7 | 06/28/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 6 | 07/08/2026 |
| EXCEL INTERIOR CONSTRUCTION | General Contractor | 6 | 07/08/2026 |
| EVERGREEN BUILDERS & CON* | General Contractor | 6 | 03/21/2026 |
| BH DRYWALL & PAINTING INC | General Contractor | 6 | 07/08/2026 |
| MAUCERI SIGN | Scaffold | 6 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 5 | 07/08/2026 |
| GABE CONSTRUCTION AND DEVELOP | General Contractor | 4 | 03/21/2026 |
| JC ELITE CONSTRUCTION SER | General Contractor | 3 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 3 | 09/24/2026 |
| FAIRMONT INDUSTRIES CORP | General Contractor | 3 | 03/21/2026 |
| PAR PLUMBING CO., INC | Plumbing | 3 | 07/08/2026 |
| CUAN CORP | General Contractor | 3 | 07/08/2026 |
| OFF SHORE ELECTRIC CORP | Electrical | 3 | 03/22/2026 |
| PRECISION BUILDING & CONS | General Contractor | 3 | 03/21/2026 |
| EMPIRE STATE ELEC MAINT & | Electrical | 3 | 03/22/2026 |
| UNITY CONSTRUCTION GROUP | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CHONG ENGINEERING P.C. | 7411 | 10 | 03/26/2026 |
| CODEGREEN | 510 | 92 | 09/15/2025 |
| DOMANI INSPECTION SERVICE | 843 | 2 | 09/02/2025 |
| GILSANZ MURRAY STEFICEK | 240 | 1 | 06/27/2025 |
| LOMBARDO PROF ENGINEERING | 8566 | 2 | 11/19/2024 |
| CATAPANO ENGINEERING & AR | 3235 | 12 | 10/22/2024 |
| C.M. TESTING LABORATORY, | 1352 | 5 | 09/12/2024 |
| PCS ENGINEERING | 3745 | 3 | 08/08/2024 |
| AK ENGINEERING PC | 678 | 2 | 07/12/2023 |
| AUTOGRAPHIC CO | 1579 | 1 | 07/21/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/23/2026 |
| DOB NOW | Structural | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/22/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/22/2026 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 05/20/2026 |
| DOB NOW | Sprinklers | Signed-off | A PLUS PLUMBING CORP | 05/20/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STARCO CONSTRUCTION CORP | 11/12/2025 |
| DOB NOW | General Construction | Signed-off | STARCO CONSTRUCTION CORP | 09/03/2025 |
| DOB NOW | General Construction | Signed-off | A.W. & S. CONSTRUCTION CO | 07/29/2025 |
| DOB NOW | Mechanical Systems | Signed-off | A.W. & S. CONSTRUCTION CO | 07/29/2025 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 07/03/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | A.W. & S. CONSTRUCTION CO | 07/03/2025 |
| DOB NOW | Structural | Permit Issued | A.W. & S. CONSTRUCTION CO | 07/03/2025 |
| DOB NOW | Sign | Signed-off | POLSINELLI, HENRY | 06/02/2025 |
| DOB NOW | General Construction | Permit Issued | MAUCERI SIGN SYSTEMS LLC | 05/30/2025 |
| DOB NOW | Sign | Signed-off | POLSINELLI, HENRY | 05/30/2025 |
| DOB NOW | Sign | Signed-off | POLSINELLI, HENRY | 05/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | BH DRYWALL & PAINTING INC | 04/10/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 02/18/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 02/14/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | LHOTSE CORP | 02/11/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | LHOTSE CORP | 02/03/2025 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 01/06/2025 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 12/18/2024 |
| DOB NOW | General Construction | Signed-off | FINALY GENL CONTR | 12/16/2024 |
| DOB NOW | General Construction | Signed-off | FAIRMONT INDUSTRIES CORP | 12/03/2024 |
| DOB NOW | Sprinklers | Signed-off | AVON PLBG & HTG INC | 12/03/2024 |
| DOB NOW | Plumbing | Signed-off | I DO PLUMBING & HTG INC | 12/03/2024 |
| DOB NOW | Mechanical Systems | Signed-off | FINALY GENL CONTR | 11/29/2024 |
| DOB NOW | General Construction | Signed-off | FINALY GENL CONTR | 11/27/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | SKYTRAC ACCESS GROUP LLC | 11/08/2024 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 09/23/2024 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 09/18/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | LHOTSE CORP | 09/11/2024 |
| DOB NOW | General Construction | Signed-off | HD HVAC OF NY INC | 09/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | HD HVAC OF NY INC | 09/10/2024 |
| DOB NOW | Structural | Signed-off | ALCHEMY DEVELOPMENT | 09/06/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | LHOTSE CORP | 08/23/2024 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 08/13/2024 |
| DOB NOW | Sign | Signed-off | MAUCERI SIGN CO., INC | 08/02/2024 |
| DOB NOW | Sign | Signed-off | MAUCERI SIGN CO., INC | 08/02/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/26/2026 | Signed-off | HD HVAC OF NY INC | Air Conditioning Systems, Refrigeration Systems, Ventilation Systems | |
| 11/01/2022 | Permit Issued | RINNOVO CONSTRUCTION, LLC | Air Conditioning Systems | Cooling Task Applied Products TGE033-RA-HE 37,000 BTU · Split System ×3 |
| 07/27/2022 | Permit Issued | JC ELITE CONSTRUCTION SER | Air Conditioning Systems | Cooling Task Applied Products TGU153VAV-HE 176,600 BTU · Packaged Unit ×2 TGC033-CAV 36,600 BTU · Split System ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/01/2025 | — | — | 238 heads |
| 12/21/2023 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/12/2025 | Signed-off | I DO PLUMBING & HTG INC | Gas, Water/Sanitary |
| 07/24/2025 | Signed-off | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 07/01/2025 | — | — | — |
| 07/01/2025 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/23/2026 | Permit Issued | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 10/08/2025 | Complete | SCIENTIFIC ELECTL CONTS L | General Wiring |
| 07/10/2025 | Permit Issued | LMEC ELECTRIC INC | General Wiring, Lighting |
| 02/20/2025 | Permit Issued | Y.S ELECTRIC | General Wiring, Lighting |
| 08/21/2024 | Complete | TIKVAH ELECTRIC CO, INC. | General Wiring |
| 08/08/2024 | Permit Issued | MRD ELEC'L SERVICES, INC | General Wiring |
| 06/24/2024 | Complete | NION ELECTRIC CORP | General Wiring |
| 06/04/2024 | Complete | NION ELECTRIC CORP | General Wiring |
| 06/04/2024 | Complete | NION ELECTRIC CORP | General Wiring |
| 05/15/2024 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 02/09/2024 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 12/12/2023 | Complete | NYCOM ELECTRICAL CORP | — |
| 10/18/2023 | Permit Issued | ALLIANCE ELEVATOR COMPANY | — |
| 09/07/2023 | Permit Issued | DENMAR ELECTRIC CORP | General Wiring |
| 06/21/2023 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/23/2025 | Signed-off | A.W. & S. CONSTRUCTION CO | 1 scope_items |
| 06/27/2025 | Permit Issued | A.W. & S. CONSTRUCTION CO | Steel, Concrete |
| 09/12/2024 | Permit Issued | MAUCERI SIGN SYSTEMS LLC | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/03/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 06/05/2026 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 05/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/26/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/23/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/16/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/18/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/12/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/12/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/15/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/15/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/07/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/01/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/16/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/01/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/04/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/06/2026 | Final | Tae Chong | progress |
| 04/06/2026 | Mechanical Systems | Tae Chong | special |
| 04/06/2026 | Fire-Resistant Penetrations and Joints | Tae Chong | special |
| 02/25/2026 | Mechanical Systems | Tae Chong | special |
| 02/25/2026 | Final | Tae Chong | progress |
| 02/25/2026 | Fire-Resistant Penetrations and Joints | Tae Chong | special |
| 02/11/2026 | Final | Tae Chong | progress |
| 02/11/2026 | Fire-Resistance Rated Construction | Tae Chong | progress |
| 02/11/2026 | Fire-Resistant Penetrations and Joints | Tae Chong | special |
| 12/12/2025 | Final | Tae Chong | progress |
| 12/12/2025 | Public Assembly Emergency Lighting | Tae Chong | progress |
| 12/12/2025 | Fire-Resistant Penetrations and Joints | Tae Chong | special |
| 12/12/2025 | Fire-Resistance Rated Construction | Tae Chong | progress |
| 10/02/2025 | Sprinkler Systems | Tae Chong | special |
| 10/02/2025 | Post-installed Anchors | Tae Chong | special |
| 10/02/2025 | Fire-Resistant Penetrations and Joints | Tae Chong | special |
| 09/16/2025 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 09/16/2025 | Sprinkler Systems | HATIM ELSAID | special |
| 08/26/2025 | Mechanical Systems | JOHN MCMONAGLE | special |
| 08/26/2025 | Final | JOHN MCMONAGLE | progress |
| 07/28/2025 | Sprinkler Systems | HATIM ELSAID | special |
| 06/13/2025 | Final | HATIM ELSAID | progress |
| 06/13/2025 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 06/13/2025 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 06/13/2025 | Sprinkler Systems | HATIM ELSAID | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Calzedonia USA | Retail | Floor 1 | Project M01276216 |
| Intimissimi | Retail | Floor 1 | Project M01241435 |
| Bloomsbury Publishing | Office | Floor 12 | Project M01106311 |
| Wokuni Broadway | Restaurant / Food Service | Cellar, Floor 1 | Project M01065559 Project M01065586 Project M01018534 |
| Progyny | Office | Floors 9, 19 | Project M01037370 Project M01037405 Project M00751848 Project M00751896 |
| Claim Conference | Office | — | Project M00913491 Project M00913472 |
| NYSERDA | Office | Floor 19 | Project M00896978 |
| Panera | Restaurant / Food Service | Cellar, Floor 1 | Project M00868392 Project M00872290 Project M00868632 |
| Crown Castle | Office | Floor 15 | Project M00738743 |
| Zentalis | Office | Floors 17, 18 | Project M00552434 |