← Back
One story - permanent living quarter
136-11 62 AVENUE
QUEENS · BIN 4139772
💬 Discuss this project
1945Year Built
1.67Stories
A2Building Class
R3XZoning
1,328 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2023$900K—Private party → Private party$678/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC104/10/2026
Building Lifecycle
All (30)Filed (1)Objection (8)Special Inspection (21)
07/08/2026
Objection raised — Energy
06/11/2026
Objection resolved — Addressed
06/11/2026
Objection resolved — Addressed
06/11/2026
Objection resolved — Addressed
04/20/2026
Objection raised — Cost
04/20/2026
Objection raised — Zoning
04/20/2026
Objection raised — Zoning
04/20/2026
Objection raised — Zoning
04/10/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL EXTENSION OF AN EXISTING 1 STORY BUILDING W/ ATTIC AND CELLAR WITH GENERAL CONSTRUCTION & MECHANICAL WORK AS PER PLAN. CONVERT ONE FAMILY & 1 STORY TO TWO FAMILY & 2-STORY. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q01382874-I1
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
04/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/06/2026
Special inspection requirement — Air barrier — testing
04/06/2026
Special inspection requirement — Permanent certificate
04/06/2026
Special inspection requirement — Ventilation and air distribution system
04/06/2026
Special inspection requirement — Air barrier - visual inspection
04/06/2026
Special inspection requirement — Electric vehicle service equipment requirements
04/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/06/2026
Special inspection requirement — Fenestration air leakage
04/06/2026
Special inspection requirement — Interior lighting power
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/06/2026
Special inspection requirement — Insulation placement and R values
04/06/2026
Special inspection requirement — Maintenance information
04/06/2026
Special inspection requirement — Metering
04/06/2026
Special inspection requirement — Fenestration areas
04/03/2026
Special inspection requirement — Mechanical Systems
04/03/2026
Special inspection requirement — Final
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/06/2026HVAC-R and service water heating equipment—energy_progress
04/06/2026Fire-Resistant Penetrations and Joints—special
04/06/2026HVAC-R and service water heating system controls—energy_progress
04/06/2026Structural Stability – Alterations of existing buildings—special
04/06/2026Energy Code Compliance Inspections—progress
04/06/2026Fire-Resistance Rated Construction—progress
04/06/2026Air barrier — testing —energy_progress
04/06/2026Permanent certificate—energy_progress
04/06/2026Ventilation and air distribution system—energy_progress
04/06/2026Air barrier - visual inspection—energy_progress
04/06/2026Electric vehicle service equipment requirements—energy_progress
04/06/2026Fenestration and door U-factor and product ratings—energy_progress
04/06/2026Fenestration air leakage—energy_progress
04/06/2026Interior lighting power—energy_progress
04/06/2026HVAC-R and service water piping design and insulation—energy_progress
04/06/2026Insulation placement and R values—energy_progress
04/06/2026Maintenance information—energy_progress
04/06/2026Metering—energy_progress
04/06/2026Fenestration areas—energy_progress
04/03/2026Mechanical Systems—special
04/03/2026Final—progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026Q01382874-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01382874-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01382874-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01382874-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01382874-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01382874-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01382874-I1Open ↗