Two family converted from one family
136-24 241 STREET
QUEENS · BIN 4284380
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R2Zoning
2,575 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 6,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 23p · 1 filing · 20 docs
Floor 1
Cellar4p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSTSCAPE505/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOL SON CONTRACTOR ASSOCIATE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
N G A CONTRACTOR INCGeneral Contractor303/21/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RE ARCHITECTURE,PLLC DBA8647305/21/2025
Building Lifecycle
All (45)Filed (5)Permit Issued (2)Signed Off (2)Violation (11)Inspection (8)Objection (10)Special Inspection (7)
08/19/2025
Violation issued (ECB, closed)
Construction
07/15/2025
Signed off — Alteration
FILED TO REMOVE DOB VIOL. # V030619AEUHAZ101246, ECB VIOL.# 35242784R. REMOVE A SHOWER. RELOCATE THE LAVATORY & TOILET. LEGALIZE UTILITY SINK. REMOVE & CAP THE GAS LINE AT THE CELL LEVEL. NO CHANGE IN EGRESS. NO CHANGE TO OTHER PARTS OF THE BUILDING.
Q01133815-I1
06/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/18/2025
Special inspection requirement — Mechanical Systems
Roxana Escobar
06/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roxana Escobar
06/18/2025
Special inspection requirement — Final
Roxana Escobar
06/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
06/18/2025
Special inspection requirement — Maintenance information
Roxana Escobar
06/18/2025
Special inspection requirement — Fenestration areas
Roxana Escobar
06/13/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Admin
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Scope
05/22/2025
Objection raised — Admin
05/21/2025
Filed — Alteration
FILED TO REMOVE DOB VIOL. # V030619AEUHAZ101246, ECB VIOL.# 35242784R. REMOVE A SHOWER. RELOCATE THE LAVATORY & TOILET. LEGALIZE UTILITY SINK. REMOVE & CAP THE GAS LINE AT THE CELL LEVEL. NO CHANGE IN EGRESS. NO CHANGE TO OTHER PARTS OF THE BUILDING.
Q01133815-P3
05/12/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/30/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/21/2025
Signed off — Alteration
FILED TO REMOVE DOB VIOL. # V030619AEUHAZ101246, ECB VIOL.# 35242784R. REMOVE A SHOWER. RELOCATE THE LAVATORY & TOILET. LEGALIZE UTILITY SINK. REMOVE & CAP THE GAS LINE AT THE CELL LEVEL. NO CHANGE IN EGRESS. NO CHANGE TO OTHER PARTS OF THE BUILDING.
Q01133815-S1
04/11/2025
Filed — Alteration
FILED TO REMOVE DOB VIOL. # V030619AEUHAZ101246, ECB VIOL.# 35242784R. REMOVE A SHOWER. RELOCATE THE LAVATORY & TOILET. LEGALIZE UTILITY SINK. REMOVE & CAP THE GAS LINE AT THE CELL LEVEL. NO CHANGE IN EGRESS. NO CHANGE TO OTHER PARTS OF THE BUILDING.
Q01133815-P2
04/02/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/27/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/18/2025
Objection resolved — Addressed
02/12/2025
Objection raised — Other
02/07/2025
Permit issued — Plumbing
Q01133815-S1-PL
01/31/2025
Filed — Alteration
FILED TO REMOVE DOB VIOL. # V030619AEUHAZ101246, ECB VIOL.# 35242784R. REMOVE A SHOWER. RELOCATE THE LAVATORY & TOILET. LEGALIZE UTILITY SINK. REMOVE & CAP THE GAS LINE AT THE CELL LEVEL. NO CHANGE IN EGRESS. NO CHANGE TO OTHER PARTS OF THE BUILDING.
Q01133815-P1
01/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Roxana Escobar
01/22/2025
Permit issued — Mechanical Systems
Q01133815-I1-GC-CX
11/23/2024
Filed — Alteration
FILED TO REMOVE DOB VIOL. # V030619AEUHAZ101246, ECB VIOL.# 35242784R. REMOVE A SHOWER. RELOCATE THE LAVATORY & TOILET. LEGALIZE UTILITY SINK. REMOVE & CAP THE GAS LINE AT THE CELL LEVEL. NO CHANGE IN EGRESS. NO CHANGE TO OTHER PARTS OF THE BUILDING.
Q01133815-I1
11/23/2024
Filed — Alteration
FILED TO REMOVE DOB VIOL. # V030619AEUHAZ101246, ECB VIOL.# 35242784R. REMOVE A SHOWER. RELOCATE THE LAVATORY & TOILET. LEGALIZE UTILITY SINK. REMOVE & CAP THE GAS LINE AT THE CELL LEVEL. NO CHANGE IN EGRESS. NO CHANGE TO OTHER PARTS OF THE BUILDING.
Q01133815-S1
10/25/2024
Violation issued (HPD, closed)
I
10/18/2024
Violation issued (HPD, closed)
B
10/18/2024
Violation issued (HPD, closed)
B
10/18/2024
Violation issued (HPD, closed)
B
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2018
Violation issued (ECB, closed)
Construction
07/16/2018
Violation issued (HPD, closed)
I
07/02/2018
Violation issued (HPD, closed)
B
07/02/2018
Violation issued (HPD, closed)
B
07/02/2018
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK02/07/2025
DOB NOWMechanical SystemsSigned-offN G A CONTRACTOR INC01/22/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/30/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/02/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/27/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/18/2025Mechanical SystemsRoxana Escobarspecial
06/18/2025Fire-Resistant Penetrations and JointsRoxana Escobarspecial
06/18/2025FinalRoxana Escobarprogress
06/18/2025Energy Code Compliance InspectionsRoxana Escobarprogress
06/18/2025Maintenance informationRoxana Escobarenergy_progress
06/18/2025Fenestration areasRoxana Escobarenergy_progress
01/30/2025Energy Code Compliance InspectionsRoxana Escobarprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01133815-S1Request digital key ↗
08/21/2026Q01133815-P3Request digital key ↗
08/21/2026Q01133815-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01133815-P2Open ↗
08/21/2026Q01133815-S1Open ↗
08/21/2026Q01133815-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q01133815-I1Open ↗
09/23/2026Q01133815-I1Open ↗
08/27/2026Q01133815-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q01133815-I1Open ↗
09/23/2026Q01133815-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q01133815-P2Open ↗
08/21/2026Q01133815-S1Open ↗
08/21/2026Q01133815-I1Open ↗
Showing 3 of 5 on file for this type