← Back
One family attached or semi-detached
136-24 64 ROAD
QUEENS · BIN 4141810
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R3-1Zoning
1,216 sfGross Floor Area
1Units
One family attached or semi-detached · 2,500 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/06/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/06/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (4)
11/12/2025
Signed off — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 15 modules, 6.45 KW
Q01221207-I1
05/07/2025
Permit issued — Solar
Q01221207-I1-SL
05/06/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 15 modules, 6.45 KW
Q01221207-I1
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/06/2025
Special inspection requirement — Final
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR05/07/2025
1 project · most recent 05/06/2025
FiledStatusContractorScope
05/06/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/06/2025Fire-Resistant Penetrations and JointsMina Makarspecial
05/06/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
05/06/2025Energy Code Compliance InspectionsMina Makarprogress
05/06/2025FinalMina Makarprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01221207-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01221207-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q01221207-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01221207-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01221207-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01221207-I1Open ↗