← Back
Two stories - detached, small or mid-size
136-24 CARLTON STREET
QUEENS · Flushing-Willets Point · BIN 4112173
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R6Zoning
864 sfGross Floor Area
1Units
33 Open Violations 13 unresolved · 20 paperwork only ▸
Two stories - detached, small or mid-size · Owner of record: ELITE POINT MANAGEMENT LLC · 1,450 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof3p · 1 filing · 4 docs
Floor 23p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
Site & exterior6p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELITE POINT MANAGEMENT LLC1703/22/2026
CENTURY DEVELOPMENT GROUP507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/18/2023$621K—Private party → —$719/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XC ENGINEERING PC501/30/2024
FL&M ENGINEERING DESIGN &INSPECTION205/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G DESIGN DRAFTING803/21/2026
Rigid Structural Design, LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRESTIGE TEAM WORK INCGeneral Contractor603/21/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor407/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
XC ENGINEERING PC6692501/30/2024
Building Lifecycle
All (100)Filed (7)Permit Issued (5)Signed Off (3)Violation (59)Inspection (4)Special Inspection (22)
05/09/2024
Signed off — Alteration
Q00997975-I1
02/23/2024
Permit issued — Structural
Q00997975-I1-ST
01/30/2024
Filed — Alteration
Q00997975-I1
09/05/2023
Signed off — Alteration
REMOVE ILLEGAL 3PC BATHROOM & BEDROOM AT CELLAR, REMOVE ILLEGAL 3PC BATHROOM, WASHER & DRYER AT REAR OF 1ST FLOOR. IN CONJUNCTION WITH GC JOB#Q00829012. REMEDY ECB VIOLATIONS # 35292593J, 34777372P, 34719534N, 5292597R AND OTHER (49) RELATED VIOLATIONS.
Q00829028-I1
08/16/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/31/2023
Signed off — Alteration
Q00829012-I1
07/28/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
06/22/2023
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
06/22/2023
Special inspection requirement — Lighting controls
XIU CHEN
06/22/2023
Special inspection requirement — Interior lighting power
XIU CHEN
06/22/2023
Special inspection requirement — Maintenance information
XIU CHEN
06/21/2023
Filed — Alteration
Q00829012-P1
06/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
06/21/2023
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
06/21/2023
Special inspection requirement — Maintenance information
XIU CHEN
06/21/2023
Special inspection requirement — Lighting controls
XIU CHEN
06/21/2023
Special inspection requirement — Interior lighting power
XIU CHEN
04/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
04/17/2023
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
04/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIU CHEN
04/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIU CHEN
04/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIU CHEN
04/17/2023
Special inspection requirement — Maintenance information
XIU CHEN
04/14/2023
Filed — Alteration
REMOVE ILLEGAL 3PC BATHROOM & BEDROOM AT CELLAR, REMOVE ILLEGAL 3PC BATHROOM, WASHER & DRYER AT REAR OF 1ST FLOOR. IN CONJUNCTION WITH GC JOB#Q00829012. REMEDY ECB VIOLATIONS # 35292593J, 34777372P, 34719534N, 5292597R AND OTHER (49) RELATED VIOLATIONS.
Q00829028-P1
04/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIU CHEN
04/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
04/03/2023
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
04/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIU CHEN
04/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIU CHEN
04/03/2023
Special inspection requirement — Maintenance information
XIU CHEN
03/28/2023
Permit issued — Protection and Mechanical Methods
Q00667631-I1-PM
03/13/2023
Permit issued — General Construction
Q00829012-I1-GC
03/02/2023
Permit issued — Plumbing
Q00829028-I1-PL
02/17/2023
Filed — Alteration
REMOVE ILLEGAL 3PC BATHROOM & BEDROOM AT CELLAR, REMOVE ILLEGAL 3PC BATHROOM, WASHER & DRYER AT REAR OF 1ST FLOOR. IN CONJUNCTION WITH GC JOB#Q00829012. REMEDY ECB VIOLATIONS # 35292593J, 34777372P, 34719534N, 5292597R AND OTHER (49) RELATED VIOLATIONS.
Q00829028-I1
02/17/2023
Filed — Alteration
Q00829012-I1
05/18/2022
Filed — Alteration
Installation of a temporarily roof protection as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00667631-P1
03/15/2022
Permit issued — Protection and Mechanical Methods
Q00667631-I1-PM
02/22/2022
Filed — Alteration
Installation of a temporarily roof protection as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00667631-I1
02/07/2022
Violation issued (ECB, closed)
Construction
07/01/2021
Violation issued (ECB, closed)
Construction
04/05/2021
Violation issued (ECB, closed)
Construction
02/04/2021
Violation issued (ECB, closed)
Construction
01/15/2021
Violation issued (ECB, closed)
Construction
11/05/2020
Violation issued (ECB, closed)
Construction
11/05/2020
Violation issued (ECB, closed)
Construction
10/28/2020
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/12/2020
Violation issued (ECB, open)
Construction
01/11/2020
Violation issued (ECB, open)
Construction
11/22/2019
Violation issued (ECB, closed)
Construction
09/26/2019
Violation issued (ECB, closed)
Construction
06/26/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/24/2019
Violation issued (ECB, closed)
Construction
04/17/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/17/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2019
Violation issued (ECB, open)
Signs
03/23/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPRESTIGE TEAM WORK INC02/23/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedTRI BOROUGH SCAFFOLDING03/28/2023
DOB NOWGeneral ConstructionSigned-offPRESTIGE TEAM WORK INC03/13/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/02/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedTRI BOROUGH SCAFFOLDING03/15/2022
1 project · most recent 04/03/2023
General Wiring
FiledStatusContractorScope
04/03/2023Permit IssuedKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/28/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
06/22/2023Fire-Resistant Penetrations and JointsXIU CHENspecial
06/22/2023Energy Code Compliance InspectionsXIU CHENprogress
06/22/2023Lighting controlsXIU CHENenergy_progress
06/22/2023Interior lighting powerXIU CHENenergy_progress
06/22/2023Maintenance informationXIU CHENenergy_progress
06/21/2023Fire-Resistant Penetrations and JointsXIU CHENspecial
06/21/2023Energy Code Compliance InspectionsXIU CHENprogress
06/21/2023Maintenance informationXIU CHENenergy_progress
06/21/2023Lighting controlsXIU CHENenergy_progress
06/21/2023Interior lighting powerXIU CHENenergy_progress
04/17/2023Fire-Resistant Penetrations and JointsXIU CHENspecial
04/17/2023Energy Code Compliance InspectionsXIU CHENprogress
04/17/2023HVAC-R and service water piping design and insulationXIU CHENenergy_progress
04/17/2023HVAC-R and service water heating system controlsXIU CHENenergy_progress
04/17/2023HVAC-R and service water heating equipmentXIU CHENenergy_progress
04/17/2023Maintenance informationXIU CHENenergy_progress
04/03/2023HVAC-R and service water heating system controlsXIU CHENenergy_progress
04/03/2023Fire-Resistant Penetrations and JointsXIU CHENspecial
04/03/2023Energy Code Compliance InspectionsXIU CHENprogress
04/03/2023HVAC-R and service water heating equipmentXIU CHENenergy_progress
04/03/2023HVAC-R and service water piping design and insulationXIU CHENenergy_progress
04/03/2023Maintenance informationXIU CHENenergy_progress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00667631-P1Request digital key ↗
08/26/2026Q00667631-I1Request digital key ↗
08/25/2026Q00829012-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
12/01/2018421684485Open ↗
11/21/2018421684485Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature8
08/30/2026Q00829012-I1Open ↗
08/30/2026Q00829012-I1Open ↗
08/28/2026Q00829012-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q00829012-I1Open ↗
08/25/2026Q00829012-P1Open ↗
08/24/2026Q00829028-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026Q00829012-I1Open ↗
08/28/2026Q00829012-P1Open ↗
08/23/2026Q00829028-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/19/2018421684485Open ↗
10/22/2018421684485Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/22/2018421684485Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q00829012-I1Open ↗
08/25/2026Q00829012-P1Open ↗
08/24/2026Q00829028-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/19/2018421684485Open ↗
10/22/2018421684485Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/19/2018421684485Open ↗
10/22/2018421684485Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/19/2020421684485Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/22/2018421684485Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/22/2018421684485Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00997975-I1Open ↗