← Back
BuildNYC
Miscellaneous and old-style bank buildings
136 2ND AVENUE
MANHATTAN · East Village · BIN 1079104
💬 Discuss this project
1938Year Built
6Stories
O9Building Class
R7AZoning
31,940 sfGross Floor Area
34Units
Rent Stabilized96 Active Violations 92 unresolved · 4 paperwork only 2 likely answered 9 old, status unconfirmed ▸FDNY Report ↗
Miscellaneous and old-style bank buildings · Owner of record: Organization for Defense of Four Freed for Ukraine · 7,634 sf lot · 4.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Brasserie Saint Marc, Four Freedoms of Ukraine4p · 4 filings · 20 docs
CellarBrasserie Saint Marc8p · 4 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed8p · 3 filings · 20 docs
Filed — no permit issuedBrasserie Saint Marc2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Org for the Defense of 4 Freedom503/21/2026
NYC Department of Housing Preservation and Development304/09/2026
Organization for Defense of Four Freed for Ukraine103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SRA Architecture + Engineering512/10/2024
Ikra Consulting108/23/2022
Draft Master Engineering207/27/2021
Prainito Architect206/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services203/21/2026
Emmanuel Ray Basile103/21/2026
Draft Master Engineering203/21/2026
Elcherbini Architects203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Greg LebedowiczGeneral Contractor407/08/2026
Darci Plumbing CoPlumbing207/08/2026
High Quality Electric ofElectrical103/22/2026
Icon ElectricElectrical103/21/2026
Maksim WieslawElectrical103/21/2026
Denmar ElectricElectrical103/21/2026
Rennon ConstructionScaffold104/09/2026
High Quality Electric ofElectrical103/21/2026
John's Plumbing & HeatingPlumbing107/08/2026
A & S ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Inspections3461412/10/2024
SE Inspections7486107/29/2022
Draft Master Engineering701207/27/2021
Building Lifecycle
All (153)Filed (10)Permit Issued (5)Signed Off (4)Violation (60)Inspection (3)Objection (50)Special Inspection (21)
05/28/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/28/2026
Violation issued (ECB, open)
Unknown
05/28/2026
Violation issued (ECB, open)
Construction
02/12/2026
Violation issued (ECB, open)
Elevators
12/02/2025
Signed off — Alteration
M00797151-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/27/2025
Violation issued (ECB, open)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
08/27/2025
Violation issued (ECB, open)
Elevators
05/22/2025
Violation issued (ECB, open)
Elevators
05/13/2025
Signed off — Alteration
INSTALL SPLIT SYSTEM AC UNITS
M00564327-I1
03/24/2025
Signed off — Alteration
PLUMBING WORK TO INSTALL NEW GAS METER AND GAS LINE TO CONNECT DIRECTLY THE 6 EXISTING GAS KITCHEN EQUIPMENT AT 1ST FLR AND THE REMOVAL OF 4 GAS EQUIPMENT AT CELLAR AND 2 GAS EQUIPMENT AT 1ST FLR. NO CHANGE OF EGRESS, OCCUPANCY, OR USE REQUIRED.
M08002553-I1
03/18/2025
Violation issued (ECB, open)
Construction
03/05/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Adrian Figueroa
12/16/2024
Violation issued (ECB, open)
Elevators
12/11/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/11/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/11/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/10/2024
Filed — Alteration
PLUMBING WORK TO INSTALL NEW GAS METER AND GAS LINE TO CONNECT DIRECTLY THE 6 EXISTING GAS KITCHEN EQUIPMENT AT 1ST FLR AND THE REMOVAL OF 4 GAS EQUIPMENT AT CELLAR AND 2 GAS EQUIPMENT AT 1ST FLR. NO CHANGE OF EGRESS, OCCUPANCY, OR USE REQUIRED.
M08002553-P3
12/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Adrian Figueroa
11/26/2024
Filed — Alteration
PLUMBING WORK TO INSTALL NEW GAS METER AND GAS LINE TO CONNECT DIRECTLY THE 6 EXISTING GAS KITCHEN EQUIPMENT AT 1ST FLR AND THE REMOVAL OF 4 GAS EQUIPMENT AT CELLAR AND 2 GAS EQUIPMENT AT 1ST FLR. NO CHANGE OF EGRESS, OCCUPANCY, OR USE REQUIRED.
M08002553-P2
11/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2024
Violation issued (ECB, open)
Elevators
07/30/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/11/2024
Violation issued (FDNY_NOV, closed)
05/23/2024
Permit issued — Plumbing
M08002553-I1-PL
03/28/2024
Violation issued (ECB, open)
Elevators
02/28/2024
Violation issued (ECB, open)
Elevators
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/08/2023
Violation issued (ECB, closed)
Elevators
05/15/2023
Violation issued (ECB, open)
Construction
05/09/2023
Violation issued (ECB, open)
Construction
05/09/2023
Violation issued (ECB, open)
Unknown
05/03/2023
Violation issued (ECB, closed)
Construction
04/28/2023
Violation issued (ECB, closed)
Elevators
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/04/2023
Violation issued (ECB, open)
Construction
02/23/2023
Violation issued (ECB, closed)
Elevators
01/23/2023
Violation issued (ECB, open)
Construction
12/15/2022
Filed — Alteration
PLUMBING WORK TO INSTALL NEW GAS METER AND GAS LINE TO CONNECT DIRECTLY THE 6 EXISTING GAS KITCHEN EQUIPMENT AT 1ST FLR AND THE REMOVAL OF 4 GAS EQUIPMENT AT CELLAR AND 2 GAS EQUIPMENT AT 1ST FLR. NO CHANGE OF EGRESS, OCCUPANCY, OR USE REQUIRED.
M08002553-P1
12/02/2022
Permit issued — Plumbing
M08002553-I1-PL
10/26/2022
Violation issued (ECB, closed)
Construction
10/20/2022
Violation issued (ECB, closed)
Construction
10/03/2022
Permit issued — Sidewalk Shed
M00797151-I1-SH
09/13/2022
Filed — Alteration
PLUMBING WORK TO INSTALL NEW GAS METER AND GAS LINE TO CONNECT DIRECTLY THE 6 EXISTING GAS KITCHEN EQUIPMENT AT 1ST FLR AND THE REMOVAL OF 4 GAS EQUIPMENT AT CELLAR AND 2 GAS EQUIPMENT AT 1ST FLR. NO CHANGE OF EGRESS, OCCUPANCY, OR USE REQUIRED.
M08002553-I1
08/23/2022
Filed — Alteration
M00797151-I1
07/29/2022
Filed — Alteration
M00789515-I1
07/29/2022
Violation issued (ECB, closed)
Elevators
07/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDarci Plumbing Co05/23/2024
DOB NOWPlumbingSigned-offG.A. Plumbing & Heating12/02/2022
DOB NOWSidewalk ShedSigned-offRennon Construction10/03/2022
DOB NOWMechanical SystemsSigned-offGreg Lebedowicz08/06/2021
DOB NOWMechanical SystemsSigned-offGreg Lebedowicz10/10/2019
BIS—ISSUEDGreg Lebedowicz02/17/2021
BIS—ISSUEDGreg Lebedowicz09/04/2019
BISMHISSUEDMega Mechanical02/12/2019
BISPLISSUEDJohn's Plumbing & Heating02/12/2019
BIS—ISSUEDGreg Lebedowicz09/05/2018
BISPLISSUEDJohn's Plumbing & Heating10/24/2017
BISPLISSUEDJohn's Plumbing & Heating10/24/2017
BISSPISSUEDG.A. Plumbing & Heating11/23/2016
BISPLISSUEDWatson's Plumbing, Heating, & Building11/16/2016
BISMHISSUEDGreg Lebedowicz09/07/2016
BISOTISSUEDGreg Lebedowicz09/07/2016
BISPLISSUEDWatson's Plumbing, Heating, & Building08/17/2016
BISEQISSUEDGreg Lebedowicz02/09/2016
BISOTISSUEDGreg Lebedowicz11/24/2015
BISMHISSUEDGreg Lebedowicz11/19/2015
BISOTRE-ISSUEDGreg Lebedowicz11/10/2015
BIS—ISSUEDGreg Lebedowicz09/22/2015
BISPLISSUEDPremier Pipe Solutions12/07/2006
BISEQISSUEDTown Restoration Services07/13/2006
BISOTISSUEDTown Restoration Services07/13/2006
BISEQISSUEDTown Restoration Services07/13/2006
BISOTISSUEDTown Restoration Services07/13/2006
1 project · most recent 06/01/2021
FiledStatusContractorScope
06/01/2021———
3 projects · most recent 11/17/2025
General Wiring
FiledStatusContractorScope
11/17/2025Permit IssuedIcon ElectricGeneral Wiring
09/20/2022Permit IssuedHigh Quality Electric of—
07/29/2022Permit IssuedSouth Heights Electric CoGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
12/17/2024Fire-Resistant Penetrations and JointsAdrian Figueroaspecial
12/06/2024Fire-Resistant Penetrations and JointsAdrian Figueroaspecial
07/26/2021HVAC-R and service water piping design and insulationANTHONY GURBALLenergy_progress
07/26/2021Mechanical SystemsANTHONY GURBALLspecial
07/26/2021Fire-Resistant Penetrations and JointsANTHONY GURBALLspecial
07/26/2021FinalWilliam Ryanprogress
07/26/2021Energy Code Compliance InspectionsANTHONY GURBALLprogress
07/26/2021HVAC-R and service water heating system controlsANTHONY GURBALLenergy_progress
07/26/2021Maintenance informationANTHONY GURBALLenergy_progress
07/26/2021HVAC-R and service water heating equipmentANTHONY GURBALLenergy_progress
03/24/2021Fire-Resistant Penetrations and Joints—special
03/24/2021Sprinkler Systems—special
10/09/2019Public Assembly Emergency LightingSalvatore Prainitoprogress
10/01/2019HVAC and service water heating equipment ANTHONY GURBALLenergy_progress
10/01/2019HVAC and service water heating system controls ANTHONY GURBALLenergy_progress
10/01/2019Maintenance informationANTHONY GURBALLenergy_progress
10/01/2019HVAC insulation and sealing ANTHONY GURBALLenergy_progress
09/19/2019Fire-Resistant Penetrations and JointsANTHONY GURBALLspecial
09/18/2019FinalANTHONY GURBALLprogress
09/18/2019Energy Code Compliance InspectionsANTHONY GURBALLprogress
09/18/2019Mechanical SystemsANTHONY GURBALLspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brasserie Saint MarcRestaurant / Food ServiceCellar, Floor 1, Roof
Project M08002553 Alteration · LOC Issued · 09/13/2022
Project M00789515 Alteration · Approved · 07/29/2022
Four Freedoms of UkraineOtherFloor 1
Project M00491805 Alteration · Approved · 06/01/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 351 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
09/03/2026M00564327-I1Request digital key ↗
09/02/2026M00789515-I1Request digital key ↗
09/02/2026M00797151-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026M00243241-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00230219-I1Request digital key ↗
▸Applications & Permits82
▸BISPLAN / WORK APPROVAL APPLICATION61
11/09/2022122402863Open ↗
09/07/2022122402863Open ↗
10/28/2021122402863Open ↗
Showing 3 of 61 on file for this type
▸BISWORK PERMIT APPLICATION19
01/05/2022122402863Open ↗
12/16/2021122402863Open ↗
02/12/2019140824348Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/13/2018122402863Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/27/2023122402863Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/20/2020104476835Open ↗
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
07/23/2019140405381Open ↗
07/17/2019122402863Open ↗
07/17/2019122402863Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
10/01/2026M00564327-I1Open ↗
10/01/2026M00564327-I1Open ↗
10/01/2026M00564327-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00564327-I1Open ↗
09/02/2026M00789515-I1Open ↗
09/01/2026M08002553-P3Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
12/27/2018140824348Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/01/2026M00564327-I1Open ↗
09/01/2026M08002553-P3Open ↗
08/26/2026M08002553-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/27/2018140824348Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/27/2018140824348Open ↗
Showing 1 of 4 on file for this type
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
05/21/2019140824348Open ↗
06/25/2018122920116Open ↗
06/21/2018122920116Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING3
12/27/2018140824348Open ↗
Showing 1 of 3 on file for this type
▸Safety & Tenant Protection9
▸BISTENANT PROTECTION PLAN AND NOTES4
12/27/2018140824348Open ↗
Showing 1 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00230219-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00564327-I1Open ↗
09/01/2026M08002553-P2Open ↗
09/01/2026M08002553-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/27/2018140824348Open ↗
Showing 1 of 5 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
07/23/2019140405381Open ↗
07/17/2019122402863Open ↗
07/17/2019122402863Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
04/21/2021140405381Open ↗
04/21/2021140405381Open ↗
12/27/2018140824348Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/04/2019122402863Open ↗
07/10/2019140405274Open ↗
06/04/2019140824348Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/27/2018140824348Open ↗
Showing 1 of 3 on file for this type
▸BISENERGY CODE ANALYSIS INCOMPLETE1
08/28/2018122920116Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00564327-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY9
04/21/2021140405381Open ↗
04/21/2021140405381Open ↗
04/21/2021140405381Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
01/28/2019140405274Open ↗
09/11/2018122402863Open ↗
09/11/2018122402863Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs38
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
04/21/2021140405381Open ↗
03/06/2020122402863Open ↗
11/07/2019122402863Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
10/12/2021122402863Open ↗
06/23/2020122402863Open ↗
06/19/2020122402863Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER4
12/24/2018140405274Open ↗
Showing 1 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/28/2023122402863Open ↗
04/28/2023122402863Open ↗
07/17/2019122402863Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
05/03/2018140568936Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
07/10/2019140405274Open ↗
06/04/2019140824348Open ↗
12/27/2018140824348Open ↗
Showing 3 of 10 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
02/11/2019140824348Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/07/2018122402863Open ↗
▸Filing & Intake Forms69
▸BISBOROUGH INTAKE FORM43
04/20/2020104476835Open ↗
03/06/2020122402863Open ↗
11/07/2019122402863Open ↗
Showing 3 of 43 on file for this type
▸BISADDITIONAL INFORMATION19
02/14/2023122402863Open ↗
10/28/2021122402863Open ↗
06/02/2021122402863Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/27/2018140824348Open ↗
Showing 1 of 4 on file for this type
▸BISEFILING COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents1
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type