← Back
BuildNYC
Condo, office space
136-40 39TH AVENUE
QUEENS · BIN 4112522
💬 Discuss this project
1984Year Built
7Stories
RBBuilding Class
C4-3Zoning
20,806 sfGross Floor Area
28Units
LL97 Covered6 Active Violations 3 unresolved · 3 paperwork only ▸FDNY Report ↗
Condo, office space · Owner of record: 39 Garden Plaza Association · 5,699 sf lot · 3.65 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof39 Garden Plaza Associates4p · 1 filing · 8 docs
Floor 4Plumbing work for suite 4021p · 1 filing · 3 docs
Floor 3
Floor 2
Floor 1Guang Fa LLCUnder Construction9p · 2 filings · 20 docs
CellarTqy Constrution CORP3p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
He's Realty Holdings1803/21/2026
TQY Constrution1103/22/2026
39 Garden Plaza Associates610/13/2026
99 College Point403/21/2026
Utopia303/21/2026
Flyfls103/22/2026
Goodwill103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kendrick Lam210/20/2026
Miele Associates409/04/2026
Zheng & Associates410/14/2021
Mehdi Ghazi, P.E212/31/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Zheng & Associates603/21/2026
Ibuild Consulting403/21/2026
Miele Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HP ServicesPlumbing307/08/2026
KJK ElectricElectrical103/22/2026
A&A Pro General ContractingGeneral Contractor109/22/2026
BG Construction NYGeneral Contractor107/09/2026
Village P & H NYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lam & Lam Designs3563210/20/2026
AA Building & Inspection1519209/04/2026
Zheng & Associates7330410/14/2021
Mehdi Ghazi, P.E7129212/31/2020
Building Lifecycle
All (101)Filed (12)Permit Issued (6)Signed Off (2)Violation (60)Objection (2)Special Inspection (19)
10/20/2026
Filed — Alteration
Interior renovation of existing commercial space into bakery store. No change in use, egress or occupancy.
Q01459031-S1
09/21/2026
Permit issued — General Construction
Q01459031-I1-GC
09/15/2026
Filed — Alteration
Interior renovation of existing commercial space into bakery store. No change in use, egress or occupancy.
Q01459031-I1
09/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Lam
09/11/2026
Special inspection requirement — Final
Kendrick Lam
09/04/2026
Filed — Alteration
Propose to remove two (2) non-functioning HVAC units on the roof terrace at the second floor. There is no proposed change in occupancy, use or egress.
Q01219336-S4
07/07/2026
Permit issued — General Construction
Q01219336-I1-GC
12/22/2025
Violation issued (ECB, open)
Construction
12/03/2025
Filed — Alteration
Propose to remove two (2) non-functioning HVAC units on the roof terrace at the second floor. There is no proposed change in occupancy, use or egress.
Q01219336-P1
10/02/2025
Filed — Alteration
Propose to remove two (2) non-functioning HVAC units on the roof terrace at the second floor. There is no proposed change in occupancy, use or egress.
Q01219336-S2
05/15/2025
Objection resolved — Addressed
05/14/2025
Objection raised — Scope
05/14/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/14/2025
Special inspection requirement — Final
NAVEEN KUMAR
05/02/2025
Filed — Alteration
Propose to remove two (2) non-functioning HVAC units on the roof terrace at the second floor. There is no proposed change in occupancy, use or egress.
Q01219336-I1
01/23/2025
Violation issued (FDNY_NOV, closed)
08/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2024
Violation issued (ECB, closed)
Unknown
06/05/2024
Violation issued (ECB, open)
Construction
03/21/2024
Violation issued (ECB, open)
Construction
03/06/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/18/2023
Violation issued (ECB, open)
Construction
11/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/01/2023
Violation issued (ECB, closed)
Construction
12/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
10/14/2021
Filed — Alteration
RELOCATE AND REPLACE EX. (7) GAS METERS AT GAS METERS ROOM AT CELLAR AS PER CONED'S REQUEST.
Q00273496-P2
10/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/20/2021
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00421984-I1
01/04/2021
Special inspection requirement — HVAC and service water heating equipment
MEHDI GHAZI
01/04/2021
Special inspection requirement — Maintenance information
MEHDI GHAZI
01/04/2021
Special inspection requirement — HVAC and service water heating system controls
MEHDI GHAZI
01/04/2021
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
01/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
01/04/2021
Special inspection requirement — HVAC insulation and sealing
MEHDI GHAZI
12/31/2020
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00421984-P1
12/31/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
12/31/2020
Special inspection requirement — HVAC and service water heating equipment
MEHDI GHAZI
12/31/2020
Special inspection requirement — HVAC insulation and sealing
MEHDI GHAZI
12/31/2020
Special inspection requirement — Maintenance information
MEHDI GHAZI
12/31/2020
Special inspection requirement — HVAC and service water heating system controls
MEHDI GHAZI
12/31/2020
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
11/12/2020
Permit issued — Plumbing
Q00421984-I1-PL
11/09/2020
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00421984-I1
09/24/2020
Signed off — Alteration
INSTALL NEW ELECTRIC HOT WATER HEATER FOR SUITE 402 AT 004. THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00382384-I1
08/12/2020
Permit issued — Plumbing
Q00382384-I1-PL
08/11/2020
Filed — Alteration
INSTALL NEW ELECTRIC HOT WATER HEATER FOR SUITE 402 AT 004. THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00382384-I1
08/11/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
03/16/2020
Permit issued — Plumbing
Q00273496-I1-PL
02/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/17/2019
Filed — Alteration
RELOCATE AND REPLACE EX. (7) GAS METERS AT GAS METERS ROOM AT CELLAR AS PER CONED'S REQUEST.
Q00273496-P1
11/30/2019
Permit issued — Plumbing
Q00273496-I1-PL
11/27/2019
Filed — Alteration
RELOCATE AND REPLACE EX. (7) GAS METERS AT GAS METERS ROOM AT CELLAR AS PER CONED'S REQUEST.
Q00273496-I1
10/18/2019
Violation issued (FDNY_NOV, closed)
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA&A Pro General Contracting09/21/2026
DOB NOWGeneral ConstructionPermit IssuedBG Construction NY07/07/2026
DOB NOWPlumbingSigned-offVillage P & H NY11/12/2020
DOB NOWPlumbingSigned-offHP Services08/12/2020
DOB NOWPlumbingPermit IssuedHP Services03/16/2020
DOB NOWPlumbingPermit IssuedHP Services11/30/2019
BISMHISSUEDH Interior Design Construction10/26/2021
BISOTISSUEDH Interior Design Construction10/26/2021
BISOTISSUEDCYC General Contracting11/06/2020
BISPLISSUEDMarquis P & H Co09/28/2020
BISPLISSUEDMPS Plumbing & Heating11/27/2019
BISPLISSUEDRRP Plumbing10/22/2019
BISSPISSUEDRRP Plumbing10/22/2019
BISMHISSUEDH Interior Design Construction06/05/2019
BISPLISSUEDHP Services06/23/2017
BISOTISSUEDBarmor Rehab03/07/2017
BISPLISSUEDBarmor Rehab03/07/2017
BISPLISSUEDBarmor Rehab08/11/2016
BISBLRE-ISSUEDBarmor Rehab08/11/2016
BISOTISSUEDKings Star Construction08/15/2012
BISPLISSUEDBarmor Rehab08/15/2012
BISMHISSUEDMichelle Kuo06/20/2012
BISPLISSUEDBargain Plumbing06/20/2012
BISOTISSUEDMichelle Kuo06/12/2012
BISEQISSUEDMichelle Kuo06/12/2012
BISOTISSUEDSin Kai Enterprises04/27/2010
BISMHISSUEDH Interior Design Construction09/29/2009
BISEQISSUEDH Interior Design Construction07/13/2009
BISMHISSUEDBroad Trade Plumbing & He02/10/2009
BISPLISSUEDChinatown Plumbing & Heating09/12/2008
BISPLISSUEDK & BH Plumbing & Heating08/29/2008
BISOTISSUED55C Construction08/18/2008
BISOTISSUEDYH Contracting08/06/2008
BISMHISSUEDBroad Trade Plumbing & Heating07/03/2008
BISPLISSUEDDC Building Services07/03/2008
BIS—ISSUEDYH Contracting07/02/2008
BISPLISSUEDDC Building Services06/24/2008
BISPLISSUEDNeptune Mechanical09/19/2005
BISOTISSUEDEmpire General Contracting06/13/2005
BISOTISSUEDShiny Construction04/05/2004
+ 16 more permits on file
1 project · most recent 09/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/04/2026Permit IssuedBG Construction NYHeating and Air Conditioning Systems
Heat / Cool
Carrier 24ABB360A520 60,000 BTU · Condensing Unit ×2
48GS048115501 46,500 BTU · Condensing Unit ×2
48GS018040301 18,000 BTU · Condensing Unit ×1
PA4SAN53600N 36,000 BTU · Condensing Unit ×1
Johnson Controls GAW14L36C23SA 36,000 BTU · Condensing Unit ×2
Mitsubishi Electric PUHY-P120TNU-A<H> 120,000 BTU · Vrf Outdoor ×1
PUHY-P96TNU-A<H> 96,000 BTU · Vrf Outdoor ×1
Cooper & Hunter Heat pump CH-36LCU/0 36,000 BTU · Heat Pump Outdoor ×1
York YC336E2511A 36,000 BTU · Condensing Unit ×1
2 projects · most recent 09/04/2026
Gas
FiledStatusContractorScope
09/04/2026——Gas
10/14/2021Permit IssuedHP ServicesGas
9 projects · most recent 10/17/2025
General Wiring
FiledStatusContractorScope
10/17/2025CompleteMangi ElectricalGeneral Wiring
10/17/2025CompleteMangi ElectricalGeneral Wiring
02/06/2025CompleteCL Electrical—
07/05/2024CompleteKJK ElectricGeneral Wiring
11/25/2020CompleteHI-Rite ElectricGeneral Wiring
11/24/2020CompleteKJK ElectricGeneral Wiring
09/13/2020CompleteNelson & Tom Maintenance Inc DBGeneral Wiring
02/11/2020CompleteR & T Electrical—
01/10/2019Permit IssuedApproved ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/12/2026Fire-Resistant Penetrations and JointsBenjamin Lamspecial
09/11/2026FinalKendrick Lamprogress
05/14/2025Mechanical SystemsYounes Abouyaalaspecial
05/14/2025FinalNAVEEN KUMARprogress
10/20/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
10/14/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
01/04/2021HVAC and service water heating equipment MEHDI GHAZIenergy_progress
01/04/2021Maintenance informationMEHDI GHAZIenergy_progress
01/04/2021HVAC and service water heating system controls MEHDI GHAZIenergy_progress
01/04/2021Energy Code Compliance InspectionsMEHDI GHAZIprogress
01/04/2021Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
01/04/2021HVAC insulation and sealing MEHDI GHAZIenergy_progress
12/31/2020Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
12/31/2020HVAC and service water heating equipment MEHDI GHAZIenergy_progress
12/31/2020HVAC insulation and sealing MEHDI GHAZIenergy_progress
12/31/2020Maintenance informationMEHDI GHAZIenergy_progress
12/31/2020HVAC and service water heating system controls MEHDI GHAZIenergy_progress
12/31/2020Energy Code Compliance InspectionsMEHDI GHAZIprogress
08/11/2020Fire-Resistant Penetrations and JointsJinfar Liuspecial
▾Documents — 444 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Plumbing6
08/28/2026Q00273496-I1Request digital key ↗
08/28/2026Q00382384-I1Request digital key ↗
08/27/2026Q00421984-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch5
10/04/2026Q01459031-I1Request digital key ↗
08/18/2026Q01219336-S2Request digital key ↗
08/18/2026Q01219336-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits95
▸BISPLAN / WORK APPROVAL APPLICATION61
04/25/2025410043527Open ↗
11/07/2024410043527Open ↗
06/13/2024410043527Open ↗
Showing 3 of 61 on file for this type
▸BISWORK PERMIT APPLICATION32
03/29/2022421740995Open ↗
11/06/2020440643644Open ↗
09/28/2020401269417Open ↗
Showing 3 of 32 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/27/2018421455552Open ↗
▸BISCERTIFICATE OF OCCUPANCY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
06/18/2019401453100Open ↗
06/10/2019401453100Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/13/2025410043527Open ↗
▸Seals & Professional Certifications93
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
11/27/2019401453100Open ↗
10/03/2019421740995Open ↗
09/25/2019421740995Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
05/04/2019421740995Open ↗
03/15/2017421455552Open ↗
08/16/2016421356927Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/30/2026Q01219336-S2Open ↗
09/01/2026Q00421984-P1Open ↗
09/01/2026Q00421984-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/23/2026Q01459031-I1Open ↗
08/28/2026Q00382384-I1Open ↗
08/27/2026Q00421984-P1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
11/02/2020440643644Open ↗
05/04/2019421740995Open ↗
05/04/2019421740995Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/30/2026Q01219336-S2Open ↗
09/01/2026Q00421984-P1Open ↗
08/29/2026Q00273496-P2Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/02/2020440643644Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/02/2020440643644Open ↗
▸Trade Schedules & Equipment39
▸BISEQUIPMENT USE APPLICATION/PERMIT11
09/17/2012420575817Open ↗
09/17/2012420575817Open ↗
09/17/2012420575817Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING9
07/27/2020421740995Open ↗
07/01/2020401269417Open ↗
Showing 2 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
10/04/2012420609602Open ↗
09/11/2012420609602Open ↗
Showing 2 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS6
09/24/2012420575817Open ↗
Showing 1 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
09/25/2019421740995Open ↗
08/06/2019421740995Open ↗
05/04/2019421740995Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/16/2016421356927Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/12/2025410043527Open ↗
▸Environmental & Asbestos19
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
11/02/2020440643644Open ↗
05/04/2019421740995Open ↗
05/04/2019421740995Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/23/2026Q01459031-I1Open ↗
08/27/2026Q00421984-I1Open ↗
08/27/2026Q00421984-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
05/04/2019421740995Open ↗
11/14/2018421455552Open ↗
03/31/2017421356927Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
01/22/2021440643644Open ↗
11/14/2018421455552Open ↗
03/31/2017421356927Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/22/2021440643644Open ↗
11/06/2020440643644Open ↗
11/02/2020440643644Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/07/2021421740995Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/02/2020440643644Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00421984-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/07/2021421740995Open ↗
03/01/2021401269417Open ↗
03/01/2021401269417Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
10/03/2019421740995Open ↗
09/03/2019421740995Open ↗
08/13/2019421740995Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
10/03/2019421740995Open ↗
09/03/2019421740995Open ↗
08/13/2019421740995Open ↗
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
01/11/2022421740995Open ↗
01/11/2022421740995Open ↗
12/10/2021421740995Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
12/08/2021421740995Open ↗
01/22/2021440643644Open ↗
10/01/2012420566480Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
11/07/2024410043527Open ↗
06/13/2024410043527Open ↗
▸BISSUPERSEDING LETTER1
12/05/2019421740995Open ↗
▸Cost, Insurance & Ownership47
▸BISCOST AFFIDAVIT39
02/25/2025410043527Open ↗
01/06/2022421740995Open ↗
12/08/2021421740995Open ↗
Showing 3 of 39 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/06/2022421740995Open ↗
▸Filing & Intake Forms33
▸BISEFILING COVER SHEET16
03/15/2017421455552Open ↗
08/15/2016421356927Open ↗
Showing 2 of 16 on file for this type
▸BISADDITIONAL INFORMATION12
01/05/2021440643644Open ↗
09/24/2020421740995Open ↗
07/15/2020401269417Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM4
03/29/2022421740995Open ↗
06/18/2019401453100Open ↗
06/17/2019401453100Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/02/2020440643644Open ↗
▸Other Documents11
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION6
05/12/2025410043527Open ↗
05/12/2025410043527Open ↗
12/13/2022401546751Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/18/2022401546751Open ↗
01/18/2022400640482Open ↗
01/18/2022401546626Open ↗
▸BISBSA1
05/12/2025410043527Open ↗
▸BISBSA VARIANCE1
06/12/2024410043527Open ↗