Stand-alone food establishment
136-61 ROOSEVELT AVENUE
QUEENS · BIN 4112509
💬 Discuss this project
1946Year Built
1Stories
K5Building Class
C4-3Zoning
2,500 sfGross Floor Area
1Units
Stand-alone food establishment · Owner of record: 136-61 ROOSEVELT LLC · 2,500 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof6p · 2 filings · 6 docs
Floor 133p · 4 filings · 20 docs
Cellar31p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BENIDER COMPANY4007/08/2026
MCDONALD'S103/21/2026
MCDONALDS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ ENGINEERING, P.C106/08/2021
NATIONAL ENGINEERING, LTD205/28/2021
KSI PROFESSIONAL ENGINEERS105/27/2021
HBC ARCHITECTS105/13/2021
HC ARCHITECT, PC404/28/2021
JOHN SCHIMENTI, P.C. ARCHITECT203/31/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING803/21/2026
JP EXPEDITE803/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
MARY TERESA DIPAOLI203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUSTOM COMMERCIAL CONSTRUCTIONGeneral Contractor407/08/2026
SIGNS CADScaffold407/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
M&G PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WALTER T. GORMAN, P.E., P268405/28/2021
Building Lifecycle
All (51)Filed (11)Permit Issued (9)Signed Off (5)Inspection (6)Objection (2)Special Inspection (18)
11/24/2021
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
11/05/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/22/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/07/2021
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00529455-I1
09/21/2021
Signed off — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A @ROOSEVELT AVE ELEVATION, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00501117-I1
09/21/2021
Signed off — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-B @LIPPMANN PLZ ELEVATION, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00501119-I1
09/21/2021
Signed off — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS D/F MEDALLION WINDOW SIGN-C @LIPPMANN PLZ ELEVATION, INSIDE OF STOREFRONT WINDOW, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00501148-I1
09/21/2021
Signed off — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS D/F BLADE WALL SIGN-D @ROOSEVELT AVE ELEVATION, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00501173-I1
09/21/2021
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/21/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/09/2021
Permit issued — Construction Fence
Q00529455-I1-FN
06/09/2021
Permit issued — Plumbing
Q00497730-I1-PL
06/08/2021
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00529455-I1
06/03/2021
Permit issued — General Construction
Q00520303-I1-GC
06/03/2021
Permit issued — Structural
Q00497723-I1-ST
06/03/2021
Permit issued — Mechanical Systems
Q00497726-I1-MS
06/03/2021
Special inspection requirement — Final
Karol Zdancewicz
05/28/2021
Filed — Alteration
Q00497730-I1
05/28/2021
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE EGRESS OR OCCUPANCY
Q00497726-I1
05/27/2021
Filed — Alteration
HEREBY FILING FOR STRUCTURAL WORK IN CONJUNCTION WITH TENANT FIT OUT. NO CHANGE TO USE, EGRESS, OCCUPANCY .
Q00497723-I1
05/13/2021
Filed — Alteration CO
HEREBY FILING FOR TENANT FIT OUT. NO CHANGE TO USE EGRESS OR OCCUPANCY,
Q00520303-I1
05/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Abbas Family
05/11/2021
Special inspection requirement — Energy Code Compliance Inspections
Abbas Family
05/11/2021
Special inspection requirement — Fire-Resistance Rated Construction
Abbas Family
05/11/2021
Special inspection requirement — Exterior lighting power
Abbas Family
05/11/2021
Special inspection requirement — Lighting controls
Abbas Family
05/11/2021
Special inspection requirement — Electrical motors and elevators
Abbas Family
05/11/2021
Special inspection requirement — Interior lighting power
Abbas Family
04/28/2021
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A @ROOSEVELT AVE ELEVATION, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00501117-I1
04/28/2021
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-B @LIPPMANN PLZ ELEVATION, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00501119-I1
04/28/2021
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS D/F MEDALLION WINDOW SIGN-C @LIPPMANN PLZ ELEVATION, INSIDE OF STOREFRONT WINDOW, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00501148-I1
04/28/2021
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS D/F BLADE WALL SIGN-D @ROOSEVELT AVE ELEVATION, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00501173-I1
04/28/2021
Permit issued — Sign
Q00501119-I1-SG
04/28/2021
Permit issued — Sign
Q00501148-I1-SG
04/28/2021
Permit issued — Sign
Q00501173-I1-SG
04/28/2021
Permit issued — Sign
Q00501117-I1-SG
04/09/2021
Special inspection requirement — Final
Hackjong Choi
04/09/2021
Special inspection requirement — Final
Hackjong Choi
04/09/2021
Special inspection requirement — Final
Hackjong Choi
04/02/2021
Special inspection requirement — HVAC-R and service water heating system controls
Abbas Family
04/02/2021
Special inspection requirement — Energy Code Compliance Inspections
Abbas Family
04/02/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Abbas Family
04/02/2021
Special inspection requirement — Final
Abbas Family
04/02/2021
Special inspection requirement — Mechanical Systems
Abbas Family
04/15/2020
Special inspection requirement — HVAC insulation and sealing
John Schimenti
04/10/2020
Objection resolved — Addressed
04/08/2020
Objection raised — Other
03/31/2020
Filed — Alteration
FILING PLUMBING WORK TO INSTALL NEW WATER SERVICE TO BUILDING AS PER PLANS
Q00331805-P1
03/31/2020
Special inspection requirement — HVAC insulation and sealing
John Schimenti
03/18/2020
Filed — Alteration
FILING PLUMBING WORK TO INSTALL NEW WATER SERVICE TO BUILDING AS PER PLANS
Q00331805-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC06/09/2021
DOB NOWPlumbingPermit IssuedM&G PLUMBING AND HEATING06/09/2021
DOB NOWGeneral ConstructionPermit IssuedCUSTOM COMMERCIAL CONSTRU06/03/2021
DOB NOWStructuralSigned-offCUSTOM COMMERCIAL CONSTRU06/03/2021
DOB NOWMechanical SystemsPermit IssuedCUSTOM COMMERCIAL CONSTRU06/03/2021
DOB NOWSignSigned-offSIGNS CAD CORP04/28/2021
DOB NOWSignSigned-offSIGNS CAD CORP04/28/2021
DOB NOWSignSigned-offSIGNS CAD CORP04/28/2021
DOB NOWSignSigned-offSIGNS CAD CORP04/28/2021
BISOTISSUEDVARDARO CONSTRUCTION CORP.09/01/2020
BISOTISSUEDVARDARO CONSTRUCTION CORP.03/10/2020
BIS—ISSUEDNORTH SHORE NEON SIGN01/21/2000
BIS—ISSUEDNORTH SHORE NEON SIGN01/21/2000
BIS—ISSUEDNORTH SHORE NEON SIGN01/21/2000
BISFPISSUEDSAFETY CONSULTANS ,INC10/27/1999
BISPLISSUEDD & G MECHANICAL INC09/10/1999
BIS—ISSUEDFULL SERVICE CONTRACTING INC08/16/1999
BISEQRE-ISSUEDFULL SERVICE CONTRACTING INC08/12/1999
BISMHISSUEDMEBCO MASTER ENFIROMENTAL BUSI10/18/1993
1 project · most recent 05/28/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2021Permit IssuedCUSTOM COMMERCIAL CONSTRUAir Conditioning Systems
Cooling
York ZJ090 3,000 CFM · Rooftop Unit ×4
ZJ102 3,400 CFM · Rooftop Unit ×4
Captiveaire A1-D.250-G10 1,950 CFM · Makeup Air ×4
1 project · most recent 03/31/2020
Water/Sanitary
FiledStatusContractorScope
03/31/2020——Water/Sanitary
5 projects · most recent 10/21/2021
General Wiring
FiledStatusContractorScope
10/21/2021CompleteHANISON ELECTRIC INCGeneral Wiring
07/09/2021CompleteSIGNS CAD CORP—
07/09/2021CompleteSIGNS CAD CORP—
07/09/2021CompleteSIGNS CAD CORP—
03/10/2020Permit IssuedBRANDL ELECTRIC INC.—
1 project · most recent 05/27/2021
Steel
FiledStatusContractorScope
05/27/2021Signed-offCUSTOM COMMERCIAL CONSTRUSteel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/24/2021No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
11/05/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/22/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/20/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2021Pass-Final CND-Occupancy InspectionPassView ↗
07/21/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/03/2021FinalKarol Zdancewiczprogress
05/11/2021Fire-Resistant Penetrations and JointsAbbas Familyspecial
05/11/2021Energy Code Compliance InspectionsAbbas Familyprogress
05/11/2021Fire-Resistance Rated ConstructionAbbas Familyprogress
05/11/2021Exterior lighting powerAbbas Familyenergy_progress
05/11/2021Lighting controlsAbbas Familyenergy_progress
05/11/2021Electrical motors and elevatorsAbbas Familyenergy_progress
05/11/2021Interior lighting powerAbbas Familyenergy_progress
04/09/2021FinalHackjong Choiprogress
04/09/2021FinalHackjong Choiprogress
04/09/2021FinalHackjong Choiprogress
04/02/2021HVAC-R and service water heating system controlsAbbas Familyenergy_progress
04/02/2021Energy Code Compliance InspectionsAbbas Familyprogress
04/02/2021HVAC-R and service water piping design and insulationAbbas Familyenergy_progress
04/02/2021FinalAbbas Familyprogress
04/02/2021Mechanical SystemsAbbas Familyspecial
04/15/2020HVAC insulation and sealing John Schimentienergy_progress
03/31/2020HVAC insulation and sealing John Schimentienergy_progress
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
08/27/2026Q00501173-I1Request digital key ↗
08/27/2026Q00501119-I1Request digital key ↗
08/27/2026Q00501117-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00331805-I1Request digital key ↗
08/15/2026Q00331805-P1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
09/18/2020421687240Open ↗
08/21/2020421687240Open ↗
08/10/2020421687240Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
11/04/2020421687240Open ↗
03/16/2020421687240Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026Q00520303-I1Open ↗
08/31/2026Q00520303-I1Open ↗
08/31/2026Q00520303-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026Q00331805-I1Open ↗
08/28/2026Q00331805-P1Open ↗
08/27/2026Q00501173-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026Q00520303-I1Open ↗
08/26/2026Q00497726-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/09/2020421687240Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/09/2020421687240Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/09/2020421687240Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00520303-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00520303-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026Q00497726-I1Open ↗
08/27/2026Q00497730-I1Open ↗
08/13/2026Q00497723-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/09/2020421687240Open ↗
03/09/2020421687240Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00331805-I1Open ↗
08/15/2026Q00331805-P1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/16/2020421687240Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/10/2021421687240Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/09/2020421687240Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/10/2021421687240Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00520303-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/10/2021421687240Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/24/2021421687240Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/09/2020421687240Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/24/2021421687240Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
11/05/2020421687240Open ↗
07/22/2020421687240Open ↗
▸BISEFILING COVER SHEET1
03/09/2020421687240Open ↗
▸BISBOROUGH INTAKE FORM1
11/04/2020421687240Open ↗