DOB01/11/2022THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER NB APPLICATION # 320625454 DUE TO THE CONTRACTOR WITHDRAWAL.
DOB01/11/2022THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER NB APPLICATION # 320625454 DUE TO THE CONTRACTOR WITHDRAWAL.
DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/15/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/15/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/15/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/15/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB07/08/2021BC3303.11 STAIRS DURING CONST OR DEMO NOTE:ATOI@NEW 5STYBLDG ACTIVE JOBSITE CURRENTLY@3STY I OBSERVED EXTERIOR LADDER GOING FROM 2-3STY NOT PROPERLY MAINTAIN 1LADDER SHOULD EXTEND 3' ABOVE LANDING&SHOULD BE PRO$2K due
ECB07/08/2021STANDING WATER ATOI OF 5STYNB ACTIVE JOBSITE CUURENTLY@3STY I OBSERVEDAPPROX3" OF WATER IN ELEVATOR SHAFT@BSMT LEVEL.THIS CONDITION CREATES HEALTH HAZARD AS BREEDING GRND FOR MOSQUITOES&OTHER TYPES OF FLIES.PRO$2K due
ECB07/08/2021BC3305.2.2 FIELD CONNECTIONS.NOTED:ATOI@NEW 5STYBLDG ACTIVE JOBSITE CURRENTLY@3STY I OBSERVED WORKER MAKING FIELD CONNECTIONS ONSITE.FIELD CONNECTIONS SHALL MEET ALL REQUIREMENTS FOR CORRESPONDING TYPES OF SHOP$2K due
ECB07/08/2021BC3301.2 FAILURE TO MAINTAIN STAIR INFILLS.NOTE:ATOI@NEW 5STYBLDG ACTIVE JOBSITE CURRENTLY@3STY I OBSERVED STAIR INFILLS NOT PROPERLY MAINTAINED CAUSING POTENTIAL TRIP&FALL HAZARD TO WORKERS&PERSONS ACCESSING J$2K due
ECB07/08/2021BC3309.10 ROOF PROTECTION NOTE:ATOI@NEW 5STYBLDG ACTIVE JOBSITE CURRENTLY@3STY I OBSERVED NO ROOF PROTECTION PROVIDED FOR ADJ PROPERTY@EXP2.FAILURE TO PROVIDE ROOF PROTECTION CREATES POTENTIAL HAZARD/PROPERTY D$2K due
ECB07/08/2021HOUSEKEEPING NOTE:ATOI@5STYNB ACTIVE JOBSITE CURRENTLY@3STY I OBSERVEDLARGE AMT OF CONST DEBRIS CONSISTING OF WOOD STORED IN REARYD AGAINST WOOD FENCE@EXP3.THIS CONDITION CREATES HAZARD OF POTENTIAL FIRE EFFECT$2K due
ECB07/08/2021FAILURE TO INSTITUTE&MAINTAIN SAFETY OPERATION NO GUARDRAILS.NOTE:ATOI@NEW 5STYBLDG ACTIVE JOBSITE CURRENTLY@3STY I OBSERVED PERIMETER EDGE@EXPS3&4 MISSING GUARDRAILS.FAILURE TO PROVIDE GUARDRAILS CREATES HAZAR$5K due
ECB06/23/2021FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO GUARDRAILS.NOTE AT TIME OF INSPECTION OF A 5 STORY NEW BUILDING CURRENTLY AT 3RD FLOOR LEVEL WORK IN PROGRESS,I OBSERVED ON 2$5K due
ECB06/23/20213314.1 SCAFFOLDS FAILURE TO MAINTAIN OR PROVIDE GUARDRAILS,MUDSILLS,TOE BOARD.NOTE AT TIME OF INSPECTION OF A 5 STORY NEW BUILDING CURRENTLYAT 3RD FLOOR LEVEL WORK IN PROGRESS,I OBSERVED SCAFFOLD ON 2ND FLOOR L$2K due
ECB06/23/20213307.4 WARNING SIGNS,PERSONNEL,AND BARRIERS.NOTE AT TIME OF INSPECTIONOF 5 STORY NEW BUILDING CURRENTLY AT 3RD FLOOR LEVEL WORK IN PROGRESS,I OBSERVED TRUCK ON EXP1 STREET AREA UNLOADING MATERIALS TO CONSTRUCTI$2K due
ECB06/23/2021FAILURE TO SAFEGUARD PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS-OVERHEAD PROTECTION.NOTE AT THE TIME OF INSPECTION OF A 5 STORY NEW BUILDING CURRENTLY AT 3RD FLOOR LEVEL WORK IN PROGRESS,I OBSERVE$5K due
ECB06/23/2021SIDEWALK SHED WHERE REQUIRED.NOTE AT TIME OF INSPECTION OF A 5 STORY NEW BUILDING(50FT)AT 3RD FLOOR LEVEL APPROX 20FT IN HEIGHT AND APPROX 8FT BACK FROM PEDESTRIAN SIDEWALK,I OBSERVED THAT THERE WERE NO SIDEWAL$10K due