Elevator cooperative
136 EAST 79 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1043259
💬 Discuss this project
1929Year Built
14Stories
D4Building Class
R10AZoning
107,231 sfGross Floor Area
26Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 136 E 79 ST CORPC/O BHS · 9,297 sf lot · 11.53 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 2 filings · 8 docs
BulkheadUnder Construction1p · 1 filing · 10 docs
Floor 8Under Construction1 filing · 20 docs
Floor 7
Floor 6Under Construction25p · 2 filings · 20 docs
Floor 5
Floor 4Under Construction9p · 2 filings · 20 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRAT ENTERPRISES709/13/2026
BROWN HARRIS STEVENS509/13/2026
XINOS CONSTRUCTION1207/08/2026
136 E 79 ST CORP503/22/2026
136 E. 79ST CORP.103/22/2026
BHS H/C 13679203/22/2026
136 EAST 79TH CORP BHS303/22/2026
136 E 79 CORP C/O BHS203/22/2026
136 EAST 79 STREET503/22/2026
OWNER OF 132 EAST 79TH ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.403/21/2026
DOMANI CONSULTING1203/21/2026
AGOUTI CONSTRUCTION CONSULTING303/21/2026
PRAT ENTERPRISES203/21/2026
Rigid Structural Design, LLC203/21/2026
J A EXPEDITING603/21/2026
EDI CONSULTING GROUP403/21/2026
WILLIAM VITACCO ASSOCIATES603/21/2026
XINOS CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor1007/08/2026
LAWRENCE J. LEVINEFire Protection603/21/2026
BONAIRE HVAC INCGeneral Contractor603/21/2026
PAR PLUMBING CO., INCGeneral Contractor306/27/2026
VELLA INTERIORS INCGeneral Contractor307/08/2026
PRAT ENTERPRISES CORPGeneral Contractor207/29/2026
T.R. FOX CONTRACTING INCGeneral Contractor207/08/2026
PAR PLUMBING CO., INCPlumbing206/28/2026
SILVERLINING INTERIORSGeneral Contractor207/08/2026
DONATO PLUMBING, INCPlumbing107/08/2026
MASTER 2 PLBG & HTG INCPlumbing107/08/2026
METROTECH MECHANICAL CORPPlumbing107/08/2026
ABDUL AZIZElectrical103/21/2026
VELOCITY PLUMBING & HEATPlumbing109/22/2026
ABE HIMELFARBElectrical103/21/2026
AZIZ ABDULElectrical103/21/2026
BIRNBAUM, ALANElectrical103/21/2026
JOHNSON WARRENElectrical103/21/2026
NORMAN TCHERNOFFElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
ALPHACRAFT CONSTRUCTION*General Contractor107/30/2026
MCCORMACK CONTRACTING INC.General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLACK BOX ENGINEERING7196208/04/2026
H. A. BADER CONSULTANTS2332208/04/2026
KZ ENGINEERING, P.C.4665307/21/2026
OUTSOURCE SPECIAL INSPECT2827306/22/2026
HOTTENROTH & JOSEPH ARCHI1160304/22/2026
SPECIAL TESTING & CONSULT1688202/23/2026
P.A.COLLINS INSPECTIONS P2168101/30/2026
ALAN MARGOLIN & ASSOC423508/07/2025
JACK GREEN ASSOCIATES422304/18/2025
ASSURE PROFESSIONAL ENGIN6962302/18/2025
Building Lifecycle
All (244)Filed (32)Permit Issued (33)Signed Off (9)Facade (FISP) (15)Violation (46)Inspection (13)Objection (66)Special Inspection (30)
09/21/2026
Permit issued — Plumbing
M01389901-S1-PL
09/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Bueno
09/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/01/2026
Special inspection requirement — Post-installed Anchors
Howard Bader
09/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
09/01/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD SAMMONS
09/01/2026
Special inspection requirement — Lighting in dwelling units
RICHARD SAMMONS
09/01/2026
Special inspection requirement — Final
RICHARD SAMMONS
08/13/2026
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
08/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2026
Filed — Alteration
Plumbing word filing in conjunction of apartment #8A renovation
M01283037-P1
07/29/2026
Permit issued — General Construction
M01389901-I1-GC
07/29/2026
Objection raised — Other
07/29/2026
Objection resolved — Addressed
07/29/2026
Objection resolved — Addressed
07/29/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
07/29/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
07/28/2026
Permit issued — Protection and Mechanical Methods
M01428777-I1-PMM
07/27/2026
Filed — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01428777-I1
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/27/2026
Special inspection requirement — Air barrier - visual inspection
Kevin Lichten
07/27/2026
Special inspection requirement — Insulation placement and R values
Kevin Lichten
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/21/2026
Filed — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED
M01411781-P1
07/21/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
07/21/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
07/16/2026
Objection raised — Cost
07/16/2026
Objection raised — Scope
07/16/2026
Objection raised — Scope
07/16/2026
Objection raised — Scope
07/16/2026
Objection raised — Scope
07/16/2026
Objection raised — Scope
07/09/2026
Objection raised — Admin
07/09/2026
Objection raised — Other
07/09/2026
Objection raised — Scope
07/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2026
Permit issued — Mechanical Systems
M01184035-S2-MS
06/23/2026
Permit issued — Plumbing
M01184035-S1-PL
06/22/2026
Filed — Alteration
Plumbing work filed in conjunction with apartment #4B renovation.
M01389901-S1
06/22/2026
Filed — Alteration
Plumbing work filed in conjunction with apartment #4B renovation.
M01389901-S2
06/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
06/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
06/18/2026
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
06/18/2026
Special inspection requirement — Maintenance information
JONAR MADRIAGA
06/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
06/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
06/17/2026
Filed — Alteration
Exterior work modification of existing openings and one window replacement. No change to use, egress or occupancy.
M01390059-I1
06/16/2026
Permit issued — Suspended Scaffold
M01411781-I1-SC
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
06/05/2026
Permit issued — General Construction
M01184035-I1-GC
06/04/2026
Filed — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED
M01411781-I1
05/27/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01347121-P1
05/19/2026
Signed off — Alteration
Plumbing work as shown on plans for Apt 6B
M01201429-S1
Latest 60 of 244 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVELOCITY PLUMBING & HEAT09/21/2026
DOB NOWGeneral ConstructionPermit IssuedALPHACRAFT CONSTRUCTION*07/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRAT ENTERPRISES CORP07/28/2026
DOB NOWMechanical SystemsPermit IssuedPAR PLUMBING CO., INC06/23/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC06/23/2026
DOB NOWSuspended ScaffoldPermit IssuedVICHIHEL RESTORATION INC06/16/2026
DOB NOWGeneral ConstructionPermit IssuedT.R. FOX CONTRACTING INC06/05/2026
DOB NOWGeneral ConstructionSigned-offVELLA INTERIORS INC05/15/2026
DOB NOWPlumbingPermit IssuedDONATO PLUMBING, INC04/23/2026
DOB NOWMechanical SystemsPermit IssuedSILVERLINING INTERIORS04/22/2026
DOB NOWGeneral ConstructionPermit IssuedSILVERLINING INTERIORS04/21/2026
DOB NOWSidewalk ShedPermit IssuedPRAT ENTERPRISES CORP01/23/2026
DOB NOWSuspended ScaffoldPermit IssuedPRAT ENTERPRISES CORP12/19/2025
DOB NOWPlumbingSigned-offMASTER 2 PLBG & HTG INC06/12/2025
DOB NOWStructuralSigned-offVELLA INTERIORS INC06/11/2025
DOB NOWMechanical SystemsSigned-offVELLA INTERIORS INC06/10/2025
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC06/02/2025
DOB NOWMechanical SystemsPermit IssuedPAR PLUMBING CO., INC06/02/2025
DOB NOWGeneral ConstructionPermit IssuedT.R. FOX CONTRACTING INC05/28/2025
DOB NOWStructuralSigned-offBONAIRE HVAC INC06/20/2024
DOB NOWMechanical SystemsSigned-offBONAIRE HVAC INC06/17/2024
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP07/06/2022
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP03/15/2022
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP03/14/2022
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP03/09/2022
DOB NOWGeneral ConstructionSigned-offMCCORMACK CONTRACTING INC02/18/2022
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP04/21/2021
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP03/06/2021
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP03/06/2021
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/18/2021
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/11/2021
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP11/30/2020
DOB NOWSupported ScaffoldSigned-offXINOS CONSTRUCTION CORP11/30/2020
BISPLISSUEDRITE WAY PLUMBING & HEATING06/28/2018
BISOTISSUEDINS DYNAMICS INC06/28/2018
BISOTISSUEDUPGRADE CONTR. CO. INC09/22/2016
BISOTISSUEDUPGRADE CONTR. CO. INC03/23/2016
BISEQISSUEDEVEREST SCAFFOLDING INC03/14/2016
BISPLISSUEDALKLEM PLUMBING INC08/10/2015
BISFBISSUEDMARLANDE HEATING CORP08/10/2015
+ 43 more permits on file
4 projects · most recent 06/22/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2026Permit IssuedALPHACRAFT CONSTRUCTION*Air Conditioning Systems
Cooling
Task TYC021TW-19K 19,500 BTU · Condensing Unit ×1
TYC021TW-25K 23,400 BTU · Condensing Unit ×1
TYC021TW-30K 29,900 BTU · Condensing Unit ×1
04/22/2026Signed-offVELLA INTERIORS INCAir Conditioning Systems
Cooling
Carrier FMC5Z1800AL 550 CFM · Fan Coil Indoor ×2
FMC5Z3000AL 1,000 BTU · Fan Coil Indoor ×2
FT5ANXB24L08 950 CFM · Fan Coil Indoor ×2
National Comfort NCP518400A-D1 18,600 BTU · Condensing Unit ×1
NCP53004000A-D1 26,800 BTU · Condensing Unit ×1
NCP5301000A-D1 27,000 BTU · Condensing Unit ×1
Task TYC021CAV-30K-273526 29,900 BTU · Condensing Unit ×1
TYC021TW-19K-3023 19,500 BTU · Condensing Unit ×1
TYC021TW-30K-3619-A 29,900 BTU · Condensing Unit ×1
08/07/2025Permit IssuedPAR PLUMBING CO., INCAir Conditioning Systems
Cooling
Task TYC021TW-30K-3024 29,900 BTU · Condensing Unit ×4
TYC021TW-19K-3024 19,500 BTU · Condensing Unit ×2
TYC021TW-25K-3024 25,400 BTU · Condensing Unit ×2
02/18/2025Signed-offBONAIRE HVAC INCHeating and Air Conditioning Systems
Heat / Cool
Friedrich KCS16A30A-E 10,000 BTU · Ptac ×2
KHS10A10A-D 10,000 BTU · Ptac ×2
Islandaire EZ15A2RMGAS15AA 1 tons · Ptac ×2
EZPD12A1GBS46AA 1 tons · Ptac ×2
3 projects · most recent 08/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/04/2026Permit IssuedDONATO PLUMBING, INCGas, Water/Sanitary
04/22/2026Signed-offMASTER 2 PLBG & HTG INCGas, Water/Sanitary
08/07/2025Permit IssuedPAR PLUMBING CO., INCGas, Water/Sanitary
12 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedT. MCCAFFREY-T. MCGOVERNGeneral Wiring
08/17/2026Permit IssuedBANNER ELECTRIC INCGeneral Wiring
06/08/2026Permit IssuedGM-POWER ELECTRIC CORPGeneral Wiring
05/28/2026CompleteMICHAEL BROS. ELECT. CORPGeneral Wiring
05/26/2026Permit IssuedT. MCCAFFREY-T. MCGOVERNGeneral Wiring
05/21/2026CompleteJASON SALOME ELEC'L CONTGGeneral Wiring
04/23/2026Permit IssuedZIP ELECTRIC INCGeneral Wiring
03/31/2026Permit IssuedAURORA ELECL CONTG INC—
06/05/2025Permit IssuedLUME ELECTRIC INCGeneral Wiring
03/03/2021Permit IssuedROBERT CHIMENTI20 meters, 1 new_meters
12/08/2020Permit IssuedTOWER ELECTRIC INC.—
07/14/2020Permit IssuedECS ELEC'L CONTG SERV INC29 meters, 1 new_meters
4 projects · most recent 06/22/2026
Masonry
FiledStatusContractorScope
06/22/2026Permit IssuedVELOCITY PLBG&HTG LI INC1 scope_items
04/22/2026Signed-offVELLA INTERIORS INC1 scope_items
02/23/2026——Masonry
02/18/2025Signed-offBONAIRE HVAC INCMasonry
1 project · most recent 05/27/2026
Sidewalk Shed
FiledStatusContractorScope
05/27/2026Permit IssuedPRAT ENTERPRISES CORPSidewalk Shed
1 project · most recent 07/21/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/21/2026Permit IssuedPRAT ENTERPISE, CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/13/2026Pass-Final SD - Up to 9 Requested FloorsPassView ↗
08/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2026Pass-Final PL - UndergroundPassView ↗
03/31/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/29/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/13/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 104
DateRequirementInspectorRole
09/01/2026Lighting in dwelling unitsRICHARD SAMMONSenergy_progress
09/01/2026Fire-Resistant Penetrations and JointsHoward Baderspecial
09/01/2026Structural Stability – Alterations of existing buildingsDavid Buenospecial
09/01/2026Post-installed AnchorsHoward Baderspecial
09/01/2026Fire-Resistance Rated Construction—progress
09/01/2026FinalRICHARD SAMMONSprogress
09/01/2026Energy Code Compliance InspectionsRICHARD SAMMONSprogress
07/29/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
07/29/2026Post-installed AnchorsKarol Zdancewiczspecial
07/27/2026Air barrier - visual inspectionKevin Lichtenenergy_progress
07/27/2026Insulation placement and R valuesKevin Lichtenenergy_progress
07/21/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
07/21/2026Post-installed AnchorsKarol Zdancewiczspecial
06/18/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
06/18/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
06/18/2026Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
06/18/2026Energy Code Compliance InspectionsJONAR MADRIAGAprogress
06/18/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
06/18/2026Maintenance informationJONAR MADRIAGAenergy_progress
06/12/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
06/11/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
05/07/2026HVAC-R and service water heating equipmentJames Josephenergy_progress
05/07/2026Tenant Protection Plan ComplianceLAWRENCE GREENspecial
05/07/2026Maintenance informationJames Josephenergy_progress
05/07/2026HVAC-R and service water heating system controlsJames Josephenergy_progress
Latest 25 of 104.
▾Documents — 491 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch31
09/06/2026M01389901-S2Request digital key ↗
09/06/2026M01389901-S3Request digital key ↗
09/06/2026M01389901-S1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00433910-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00433910-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00452279-I1Request digital key ↗
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION36
07/31/2023102552131Open ↗
07/18/2023123758308Open ↗
02/24/2023140370587Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION32
06/28/2018123379450Open ↗
06/28/2018123379450Open ↗
04/06/2016122612583Open ↗
Showing 3 of 32 on file for this type
▸Seals & Professional Certifications174
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION47
10/08/2019123758308Open ↗
06/28/2019123758308Open ↗
12/26/2018123379450Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWProgress Inspector Seal & Signature45
09/29/2026M01283037-I1Open ↗
09/29/2026M01283037-I1Open ↗
09/29/2026M01283037-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/29/2026M01283037-I1Open ↗
09/29/2026M01283037-I1Open ↗
09/28/2026M00452279-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/06/2026M01389901-S2Open ↗
09/06/2026M01389901-S1Open ↗
09/06/2026M01389901-I1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/13/2016140469570Open ↗
08/25/2015122273770Open ↗
07/02/2015140370587Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/09/2019121683393Open ↗
08/25/2015122273770Open ↗
06/21/2013121683393Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/13/2016140469570Open ↗
07/02/2015140370587Open ↗
06/30/2015140369508Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/13/2016140469570Open ↗
07/02/2015140370587Open ↗
06/30/2015140369508Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/21/2013121683393Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment37
▸BISSCHEDULE B - PLUMBING13
04/01/2014121950567Open ↗
08/21/2013121683393Open ↗
08/21/2013121683393Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
12/11/2014121950567Open ↗
07/16/2014121950567Open ↗
05/07/2012120760042Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/28/2019123758308Open ↗
06/26/2018123379450Open ↗
08/25/2015122273770Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
04/09/2012120760042Open ↗
04/09/2012120760042Open ↗
03/28/2012120760042Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/03/2012120760042Open ↗
04/09/2012120760042Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/25/2015122273770Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
06/28/2019123758308Open ↗
06/26/2018123379450Open ↗
03/13/2016140469570Open ↗
▸Environmental & Asbestos37
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/04/2026M00452279-I1Open ↗
09/02/2026M00668447-I1Open ↗
09/02/2026M00669626-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
06/28/2019123758308Open ↗
06/26/2018123379450Open ↗
12/15/2015122612583Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/17/2026M01201429-I1Open ↗
08/17/2026M01201429-S1Open ↗
08/17/2026M01201429-S2Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
06/28/2019123758308Open ↗
12/26/2018123379450Open ↗
06/26/2018123379450Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
04/09/2012120760042Open ↗
04/03/2012120760042Open ↗
Showing 2 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
11/15/2017122612583Open ↗
03/27/2017122273770Open ↗
02/10/2015121950567Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/03/2023140370587Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/02/2015140370587Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/02/2015140370587Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
09/12/2023102552131Open ↗
08/15/2023102552131Open ↗
03/08/2023140370587Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
09/12/2023102552131Open ↗
09/12/2023102552131Open ↗
03/09/2023140370587Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
06/21/2013121683393Open ↗
Showing 1 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/27/2017122273770Open ↗
04/09/2012120760042Open ↗
Showing 2 of 4 on file for this type
▸BISFINAL1
03/03/2023140370587Open ↗
▸Cost, Insurance & Ownership32
▸BISCOST AFFIDAVIT30
09/06/2023102552131Open ↗
06/28/2019123758308Open ↗
12/26/2018123379450Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/03/2023140370587Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET14
06/28/2019123758308Open ↗
06/26/2018123379450Open ↗
12/15/2015122612583Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION10
06/28/2019123758308Open ↗
04/11/2019121683393Open ↗
10/11/2017122612583Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM4
05/09/2019121683393Open ↗
12/26/2018123379450Open ↗
11/15/2017122612583Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
03/13/2016140469570Open ↗
07/02/2015140370587Open ↗
06/30/2015140369508Open ↗
Showing 3 of 4 on file for this type
▸Other Documents10
▸DOB NOWManufacturer's Specifications3
08/16/2026M01411781-I1Open ↗
08/15/2026M01411781-P1Open ↗
08/13/2026M01335039-I1Open ↗
▸DOB NOWCalculations3
08/16/2026M01411781-I1Open ↗
08/15/2026M01411781-P1Open ↗
08/13/2026M01335039-I1Open ↗
▸BISCHIMNEYS AND VENTS1
03/03/2023140370587Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
05/09/2014121950567Open ↗
▸BIS* FIRE STOPS 27-3451
08/11/2023102552131Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
08/11/2023102552131Open ↗