← Back
Primarily 3 family with 1 store or office
136 FRANKLIN STREET
BROOKLYN · Greenpoint · BIN 3064808
💬 Discuss this project
1855Year Built
4Stories
S3Building Class
R6AZoning
4,666 sfGross Floor Area
4Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 136 FRANKLIN OWNER LLC · 1,639 sf lot · 2.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof6p · 2 filings · 20 docs
Floor 417p · 2 filings · 20 docs
Floor 317p · 2 filings · 20 docs
Floor 220p · 2 filings · 20 docs
Floor 133p · 2 filings · 20 docs
Cellar20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FRANKLYLOFTY CONSTRUCTION407/08/2026
DAX REAL ESTATE2807/08/2026
136 FRANKLIN OWNER LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/12/2022$3.7M—Private party → 136 FRANKLIN OWNER LLC$798/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KUSHNER STUDIOS805/07/2026
MURDOCH ENGINEERING112/09/2024
ATELIERTEK ARCHITECTS309/06/2024
MEYERS+ ENGINEERS108/28/2024
HANSEN ENGINEERING, PC303/05/2024
JOEL PHAGOO P.E. PLLC112/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS1003/21/2026
VAN LEEUWEN ICE CREAM403/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANKLYLOFTY CONSTRUCTIONGeneral Contractor1707/08/2026
COYLE CONTRACTING CORPGeneral Contractor707/08/2026
GLENNS PLUMBING SVCS INCPlumbing207/08/2026
CM PLUMBING INCPlumbing107/08/2026
NATIONAL SIGN LIGHTINGScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544905/07/2026
CATALPA SPECIAL INSPECTIO2004509/06/2024
METRIC CONSULTING AND INS1803109/06/2024
BFS ARCHITECT PC7477203/05/2024
BUILDING CONSULTING ENGIN1034203/05/2024
Building Lifecycle
All (117)Filed (17)Permit Issued (14)Signed Off (11)Violation (8)Inspection (13)Objection (24)Special Inspection (30)
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
05/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
05/18/2026
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
05/07/2026
Filed — Alteration CO
STRUCTURAL AND FOUNDATION WORK RELATED TO THE 1-STORY REAR EXTENSION IN CONJUNCTION WITH THE ALTCO #B00786304-I1
B00786304-P5
04/01/2026
Signed off — Alteration
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE FOR VAN LEEUWEN ICE CREAM (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01074978-S2
10/23/2025
Signed off — Alteration
ERECT HALO-LIT WALL SIGN AND NON-ILLUMINATED D/F BLADE SIGN. SIGNS ARE ACCESSORY TO VAN LEEUWAN.
B01112158-I1
10/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/04/2025
Signed off — Alteration
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE FOR VAN LEEUWEN ICE CREAM (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01074978-S3
08/27/2025
Permit issued — Mechanical Systems
B01074978-S2-MS
08/27/2025
Permit issued — Structural
B01074978-S3-ST
08/25/2025
Signed off — Alteration
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE FOR VAN LEEUWEN ICE CREAM (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01074978-S1
08/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2025
Signed off — Alteration
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE FOR VAN LEEUWEN ICE CREAM (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01074978-I1
03/05/2025
Signed off — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENTS INCLUDING THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW KITCHEN CABINETS THROUGHOUT APARTMENTS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE OF USE,OCCUPANCY OR EGRESS
B00766219-S2
01/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/31/2024
Permit issued — Sign
B01112158-I1-SG
12/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2024
Signed off — Alteration CO
STRUCTURAL AND FOUNDATION WORK RELATED TO THE 1-STORY REAR EXTENSION IN CONJUNCTION WITH THE ALTCO #B00786304-I1
B00786304-S2
12/09/2024
Filed — Alteration
ERECT HALO-LIT WALL SIGN AND NON-ILLUMINATED D/F BLADE SIGN. SIGNS ARE ACCESSORY TO VAN LEEUWAN.
B01112158-I1
12/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/04/2024
Signed off — Alteration CO
STRUCTURAL AND FOUNDATION WORK RELATED TO THE 1-STORY REAR EXTENSION IN CONJUNCTION WITH THE ALTCO #B00786304-I1
B00786304-S1
11/22/2024
Permit issued — Plumbing
B01074978-S1-PL
11/15/2024
Permit issued — General Construction
B01074978-I1-GC
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
09/25/2024
Objection resolved — Addressed
09/16/2024
Special inspection requirement — Final
JERE MURDOCH
09/10/2024
Objection raised — Other
09/06/2024
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE FOR VAN LEEUWEN ICE CREAM (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01074978-S3
08/30/2024
Objection raised — Other
08/30/2024
Objection raised — Other
08/29/2024
Objection resolved — Addressed
08/28/2024
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE FOR VAN LEEUWEN ICE CREAM (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01074978-S2
08/28/2024
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE FOR VAN LEEUWEN ICE CREAM (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01074978-S1
08/22/2024
Objection resolved — Addressed
08/15/2024
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
08/15/2024
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
08/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
08/15/2024
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
08/15/2024
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
08/12/2024
Objection raised — Other
08/12/2024
Objection raised — Fire_Protection
08/07/2024
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF EXISTING COMMERCIAL SPACE FOR VAN LEEUWEN ICE CREAM (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01074978-I1
08/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
08/06/2024
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
07/31/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
07/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
07/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
07/01/2024
Special inspection requirement — Final
ERIC BERLENT
07/01/2024
Special inspection requirement — Mechanical Systems
ERIC BERLENT
07/01/2024
Special inspection requirement — Final
ERIC BERLENT
04/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08054836-I1
04/23/2024
Permit issued — Structural
B00786304-S2-ST
04/23/2024
Permit issued — General Construction
B00786304-S2-FO
04/10/2024
Violation issued (HPD, closed)
A
04/05/2024
Signed off — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENTS INCLUDING THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW KITCHEN CABINETS THROUGHOUT APARTMENTS AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE OF USE,OCCUPANCY OR EGRESS
B00766219-I1
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCOYLE CONTRACTING CORP08/27/2025
DOB NOWStructuralSigned-offCOYLE CONTRACTING CORP08/27/2025
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC12/31/2024
DOB NOWPlumbingSigned-offCM PLUMBING INC11/22/2024
DOB NOWGeneral ConstructionSigned-offCOYLE CONTRACTING CORP11/15/2024
DOB NOWStructuralSigned-offFRANKLYLOFTY CONSTRUCTION04/23/2024
DOB NOWGeneral ConstructionSigned-offFRANKLYLOFTY CONSTRUCTION04/23/2024
DOB NOWConstruction FenceSigned-offFRANKLYLOFTY CONSTRUCTION12/28/2023
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC10/26/2023
DOB NOWStructuralSigned-offFRANKLYLOFTY CONSTRUCTION07/06/2023
DOB NOWGeneral ConstructionPermit IssuedFRANKLYLOFTY CONSTRUCTION12/14/2022
DOB NOWConstruction FenceSigned-offFRANKLYLOFTY CONSTRUCTION12/14/2022
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC11/09/2022
DOB NOWGeneral ConstructionSigned-offFRANKLYLOFTY CONSTRUCTION09/29/2022
BISBLISSUEDBAYSIDE FUEL11/30/2004
1 project · most recent 05/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/07/2026Signed-offI & I PLUMBING CORPGas, Water/Sanitary
4 projects · most recent 05/29/2025
General Wiring
FiledStatusContractorScope
05/29/2025CompleteERNE VALLEY ELECTRICAL INGeneral Wiring
12/16/2024CompletePROFF ELECTRICAL LLC—
11/26/2023CompleteWORD OF LIGHT ELECT LLCGeneral Wiring
11/10/2022CompleteWORD OF LIGHT ELECT LLCGeneral Wiring
1 project · most recent 05/07/2026
Steel Masonry
FiledStatusContractorScope
05/07/2026Signed-offFRANKLYLOFTY CONSTRUCTIONSteel, Masonry
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
10/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
05/18/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
05/18/2026Insulation placement and R valuesEUGENE BIFULCOenergy_progress
05/18/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
09/16/2024FinalJERE MURDOCHprogress
08/15/2024Tenant Protection Plan ComplianceERIC BERLENTspecial
08/15/2024Structural Steel - WeldingSAMI HAJJAR P.Especial
08/15/2024Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
08/15/2024Post-installed AnchorsSAMI HAJJAR P.Especial
08/15/2024Structural Steel - DetailsSAMI HAJJAR P.Especial
08/06/2024Post-installed AnchorsERIC BERLENTspecial
08/06/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
08/06/2024Fire-Resistance Rated ConstructionERIC BERLENTprogress
08/06/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
07/31/2024FinalSAMI HAJJAR P.Eprogress
07/30/2024Tenant Protection Plan ComplianceERIC BERLENTspecial
07/30/2024Tenant Protection Plan ComplianceERIC BERLENTspecial
07/01/2024FinalERIC BERLENTprogress
07/01/2024Mechanical SystemsERIC BERLENTspecial
07/01/2024FinalERIC BERLENTprogress
03/13/2024Structural Steel - WeldingEUGENE BIFULCOspecial
03/13/2024Structural Steel - DetailsEUGENE BIFULCOspecial
03/13/2024Post-installed AnchorsEUGENE BIFULCOspecial
03/13/2024FinalEUGENE BIFULCOprogress
03/13/2024Construction Operations Influencing Adjacent StructuresEUGENE BIFULCOspecial
03/13/2024Subgrade InspectionsEUGENE BIFULCOspecial
Latest 25 of 69.
▾Documents — 147 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/28/2026B08054836-I1Request digital key ↗
08/24/2026B01074978-S2Request digital key ↗
08/24/2026B01074978-S3Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit16
08/13/2026B01074978-S1Open ↗
08/13/2026B01112158-I1Open ↗
08/13/2026B00786304-P1Open ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00786304-P5Open ↗
08/13/2026B00786304-I1Open ↗
08/13/2026B00786304-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/17/2026B00786304-I1Open ↗
08/17/2026B00786304-P5Open ↗
▸Seals & Professional Certifications58
▸DOB NOWSpecial Inspector Seal & Signature27
08/31/2026B00786304-P2Open ↗
08/31/2026B00786304-P2Open ↗
08/31/2026B00786304-P2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/24/2026B01074978-S3Open ↗
08/24/2026B01074978-S2Open ↗
08/24/2026B01074978-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026B00786304-P2Open ↗
08/30/2026B00766219-S2Open ↗
08/27/2026B00786304-P1Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist7
08/13/2026B00786304-P3Open ↗
08/13/2026B00786304-P5Open ↗
08/13/2026B00786304-S2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/17/2026B00786304-S2Open ↗
08/17/2026B00786304-S1Open ↗
08/17/2026B00786304-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026B01074978-S3Open ↗
08/24/2026B01074978-S2Open ↗
08/24/2026B01074978-S1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents32
▸DOB NOWSite Survey: Initial7
08/13/2026B00786304-P4Open ↗
08/13/2026B00786304-S2Open ↗
08/13/2026B00786304-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/13/2026B00786304-P4Open ↗
08/13/2026B00786304-P3Open ↗
08/13/2026B00786304-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlot Diagram7
08/13/2026B00786304-P5Open ↗
08/13/2026B00786304-P4Open ↗
08/13/2026B00786304-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProof of Historic Building6
08/13/2026B01074978-I1Open ↗
08/13/2026B00786304-P5Open ↗
08/13/2026B00766219-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026B00786304-P3Open ↗
08/17/2026B00786304-P1Open ↗
08/17/2026B00786304-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00786304-I1Open ↗