← Back
STATEN ISLAND
136 RAMBLEWOOD AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5177390
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitecturePlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
Floor 2Under Construction15p · 1 filing · 16 docs
Floor 1Under Construction15p · 1 filing · 16 docs
BasementUnder Construction14p · 1 filing · 16 docs
Filed — no permit issued3p · 2 filings · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE308/05/2026
A TECH ENGINEERING NYC, PLLC.106/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STOUT HOMES INCGeneral Contractor110/02/2026
Building Lifecycle
All (41)Filed (4)Permit Issued (1)Objection (6)Special Inspection (30)
10/01/2026
Permit issued — General Construction
S01343166-I1-GC-CX
08/05/2026
Filed — Alteration
APPLICATION FILED FOR 9'-0" CURB CUT ALONG RAMBLEWOOD AVENUE. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01337812-I1
06/16/2026
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01409268-I1
04/28/2026
Objection resolved — Resolved
04/28/2026
Objection resolved — Resolved
03/27/2026
Filed — New Building
APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH THE CONSTRUCTION OF NEW RESIDENTIAL BUILDING. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01343166-S1
03/16/2026
Objection raised — Fire_Protection
03/04/2026
Objection resolved — Resolved
02/20/2026
Objection raised — Fire_Protection
02/20/2026
Objection raised — Admin
02/17/2026
Filed — New Building
APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH THE CONSTRUCTION OF NEW RESIDENTIAL BUILDING. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S01343166-I1
01/20/2026
Special inspection requirement — Insulation placement and R values
01/07/2026
Special inspection requirement — Concrete - Cast-In-Place
01/07/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/07/2026
Special inspection requirement — Mechanical Systems
01/07/2026
Special inspection requirement — Final
01/07/2026
Special inspection requirement — Footing and Foundation
01/07/2026
Special inspection requirement — Energy Code Compliance Inspections
01/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
01/07/2026
Special inspection requirement — Structural Wood Frame
01/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/07/2026
Special inspection requirement — Metering
01/07/2026
Special inspection requirement — Permanent certificate
01/07/2026
Special inspection requirement — Protection of exposed foundation insulation
01/07/2026
Special inspection requirement — Ventilation and air distribution system
01/07/2026
Special inspection requirement — Air barrier - visual inspection
01/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
01/07/2026
Special inspection requirement — Air barrier — testing
01/07/2026
Special inspection requirement — Electric vehicle service equipment requirements
01/07/2026
Special inspection requirement — Fenestration air leakage
01/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
01/07/2026
Special inspection requirement — Fenestration areas
01/07/2026
Special inspection requirement — Interior lighting power
01/07/2026
Special inspection requirement — Subgrade Inspections
01/07/2026
Special inspection requirement — Maintenance information
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTOUT HOMES INC10/01/2026
1 project · most recent 03/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
03/27/2026Permit IssuedSTOUT HOMES INCHeating and Air Conditioning Systems
2 projects · most recent 06/16/2026
Water/Sanitary Plumbing-Sprinkler Storm
FiledStatusContractorScope
06/16/2026——Plumbing-Sprinkler, Water/Sanitary
03/27/2026——Storm, Water/Sanitary
1 project · most recent 03/27/2026
Wood
FiledStatusContractorScope
03/27/2026Permit IssuedSTOUT HOMES INCWood
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
01/20/2026Insulation placement and R values—energy_progress
01/07/2026Concrete - Cast-In-Place—special
01/07/2026Excavations - Sheeting, Shoring, and Bracing—special
01/07/2026Exterior Insulation and Finish Systems (EIFS)—special
01/07/2026Fire-Resistant Penetrations and Joints—special
01/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/07/2026Subsurface Investigations (Borings/Test Pits)—special
01/07/2026Mechanical Systems—special
01/07/2026Final—progress
01/07/2026Footing and Foundation—progress
01/07/2026Energy Code Compliance Inspections—progress
01/07/2026Fire-Resistance Rated Construction—progress
01/07/2026Structural Wood Frame—progress
01/07/2026HVAC-R and service water heating system controls—energy_progress
01/07/2026Metering—energy_progress
01/07/2026Permanent certificate—energy_progress
01/07/2026Protection of exposed foundation insulation—energy_progress
01/07/2026Ventilation and air distribution system—energy_progress
01/07/2026Air barrier - visual inspection—energy_progress
01/07/2026Duct leakage testing, insulation and design—energy_progress
01/07/2026Air barrier — testing —energy_progress
01/07/2026Electric vehicle service equipment requirements—energy_progress
01/07/2026Fenestration air leakage—energy_progress
01/07/2026HVAC-R and service water heating equipment—energy_progress
01/07/2026HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 30.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026S01343166-I1Request digital key ↗
08/17/2026S01343166-S1Request digital key ↗
08/16/2026S01409268-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026S01343166-I1Open ↗
08/13/2026S01343166-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/17/2026S01343166-S1Open ↗
08/17/2026S01343166-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01343166-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026S01343166-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026S01343166-S1Open ↗
08/16/2026S01409268-I1Open ↗
08/16/2026S01337812-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S01343166-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026S01343166-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01343166-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026S01343166-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01343166-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01343166-I1Open ↗