← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
136 WEST 22 STREET
MANHATTAN · BIN 1014778
💬 Discuss this project
1908Year Built
10Stories
RMBuilding Class
C6-3AZoning
27,467 sfGross Floor Area
9Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 4,115 sf lot · 6.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof17p · 1 filing · 20 docs
Floor 1019p · 1 filing · 20 docs
Floor 915p · 1 filing · 20 docs
Floor 8
Floor 7
Floor 61p · 1 filing · 11 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL INDUSTRIES203/22/2026
DASANTI CONSTRUCTION103/22/2026
OWNER OF 136 W 22 ST103/22/2026
136 W. 22 ST CORP103/22/2026
136 WEST 22ND ST703/21/2026
136 WEST 22ND STREET CONDOMINIUM103/21/2026
136 W 22 ST CONDO203/21/2026
136 WEST 2103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors1003/21/2026
AGOUTI CONSTRUCTION CONSULTING203/21/2026
WILLIAM VITACCO ASSOCIATES103/21/2026
EFG CONSULTING203/21/2026
PROCESS WERKSHOP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION BROOKLYN INCGeneral Contractor407/08/2026
BEHIND THE WALLS GEN CONTGeneral Contractor303/21/2026
R.J.C. MECHANICAL CORPFire Protection207/08/2026
KALINIC CONSTRUCTION INCGeneral Contractor203/21/2026
R.J.C. MECHANICAL CORPPlumbing207/08/2026
EMPIRE PLUMBING INCPlumbing107/08/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
WILLIAM C. GERAKARIS P&HPlumbing107/08/2026
HOWARD WEISSElectrical103/21/2026
ZORAN VUJICICElectrical103/21/2026
PIPING & PLUMBING SOLUTIOFire Protection107/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STUDIO DB LLC75331103/25/2026
CATALPA SPECIAL INSPECTIO2004703/25/2026
JOSEPH K. BLUM CO. LLP1741103/24/2025
MEP INSPECTIONS, INC1102208/28/2024
MICHAEL PATINO ARCHITECTU8170202/06/2023
URBAN PIONEERING ARCHITEC6521101/11/2022
ANZ CONSULTING ENGINEERIN3946111/13/2020
Building Lifecycle
All (199)Filed (20)Permit Issued (12)Signed Off (7)Facade (FISP) (12)Violation (33)Inspection (7)Objection (78)Special Inspection (30)
05/19/2026
Filed — Alteration
IRA to assist with Condition Assessment
M01404648-I1
03/25/2026
Filed — Alteration
Additions/Modifications to existing sprinkler system. No change to use, egress, or occupancy.
M00900492-P8
03/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAMIAN ZUNINO
01/30/2026
Permit issued — Sprinklers
M00900492-S3-EW-SP
01/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/14/2026
Signed off — Alteration
Additions/Modifications to existing sprinkler system. No change to use, egress, or occupancy.
M00900492-I1
01/12/2026
Signed off — Alteration
Additions/Modifications to existing sprinkler system. No change to use, egress, or occupancy.
M00900492-S1
12/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/15/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
09/05/2025
Permit issued — Plumbing
M00900492-S2-PL
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAMIAN ZUNINO
08/15/2025
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
08/15/2025
Special inspection requirement — Post-installed Anchors
Nicolas Crosetto
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/31/2025
Special inspection requirement — Energy Code Compliance Inspections
DAMIAN ZUNINO
07/31/2025
Special inspection requirement — Final
DAMIAN ZUNINO
07/31/2025
Special inspection requirement — Lighting in dwelling units
DAMIAN ZUNINO
07/31/2025
Special inspection requirement — Fenestration air leakage
DAMIAN ZUNINO
07/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DAMIAN ZUNINO
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAMIAN ZUNINO
07/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
DAMIAN ZUNINO
07/31/2025
Special inspection requirement — Lighting controls
DAMIAN ZUNINO
07/28/2025
Objection resolved — Addressed
07/25/2025
Objection raised — Scope
07/15/2025
Objection resolved — Addressed
07/15/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/23/2025
Objection resolved — Addressed
04/01/2025
Objection raised — Admin
04/01/2025
Objection raised — Scope
04/01/2025
Objection raised — Structural
04/01/2025
Objection raised — Admin
03/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIC BERLENT
03/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
ERIC BERLENT
03/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
ERIC BERLENT
03/28/2025
Special inspection requirement — Final
ERIC BERLENT
03/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
03/28/2025
Special inspection requirement — Mechanical Systems
ERIC BERLENT
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAMIAN ZUNINO
03/28/2025
Special inspection requirement — Heating Systems
ERIC BERLENT
03/24/2025
Filed — Alteration
Additions/Modifications to existing sprinkler system. No change to use, egress, or occupancy.
M00900492-S5
03/14/2025
Filed — Alteration
Additions/Modifications to existing sprinkler system. No change to use, egress, or occupancy.
M00900492-P7
03/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
03/10/2025
Special inspection requirement — Final
ERIC BERLENT
03/10/2025
Special inspection requirement — Mechanical Systems
ERIC BERLENT
03/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIC BERLENT
03/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
ERIC BERLENT
03/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAMIAN ZUNINO
03/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
ERIC BERLENT
03/10/2025
Special inspection requirement — Heating Systems
ERIC BERLENT
01/30/2025
Objection resolved — Addressed
11/12/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offR.J.C. MECHANICAL CORP01/30/2026
DOB NOWPlumbingPermit IssuedR.J.C. MECHANICAL CORP09/05/2025
DOB NOWPlumbingPermit IssuedR.J.C. MECHANICAL CORP02/06/2024
DOB NOWMechanical SystemsSigned-offCONSTRUCTION BROOKLYN INC01/26/2024
DOB NOWSprinklersSigned-offR.J.C. MECHANICAL CORP01/22/2024
DOB NOWPlumbingPermit IssuedWILLIAM C. GERAKARIS P&H10/10/2023
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION BROOKLYN INC09/14/2023
DOB NOWGeneral ConstructionSigned-offBEHIND THE WALLS GEN CONT08/29/2022
DOB NOWGeneral ConstructionSigned-offKALINIC CONSTRUCTION INC02/10/2022
DOB NOWSprinklersSigned-offEMPIRE PLUMBING INC11/25/2020
DOB NOWPlumbingSigned-offEMPIRE PLUMBING INC11/25/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC08/04/2020
BISOTISSUEDDASANTI CONSTRUCTION LLC04/19/2021
BISOTISSUEDDASANTI CONSTRUCTION LLC11/17/2020
BISOTISSUEDBOLSTER.US,INC11/13/2020
BISOTISSUEDALPINE CONSTRUCTION SVC07/21/2020
BISOTISSUEDDASANTI CONSTRUCTION LLC04/10/2019
BISPLISSUEDEMPIRE PLUMBING INC03/04/2019
BISOTISSUEDDASANTI CONSTRUCTION LLC02/25/2019
BISOTISSUEDFRANJO RESTORATION COSTRU06/09/2017
BISEQISSUEDFRANJO RESTORATION COSTRU12/08/2016
BISOTISSUEDFRANJO RESTORATION COSTRU12/08/2016
BISPLISSUEDPREMIER PIPE SOLUTIONS01/20/2015
BISSPISSUEDDC BUILDING SERVICES INC04/04/2014
BISEQISSUEDORION CONSTRUCTION & PAINTING04/01/2014
BISMHISSUEDORION CONSTRUCTION & PAINTING02/04/2014
BIS—ISSUEDORION CONSTRUCTION & PAINTING01/31/2014
BISPLISSUEDPREMIER PIPE SOLUTIONS01/08/2014
BISMHISSUEDORION CONSTRUCTION & PAINTING12/27/2013
BIS—ISSUEDORION CONSTRUCTION & PAINTING12/27/2013
BIS—ISSUEDORION CONSTRUCTION & PAINTING12/26/2013
BISPLISSUEDFORTE EXPRESS P & H INC07/22/2013
BISMHISSUEDSIGNATURE INTERIOR DEMOLI05/03/2013
BISOTISSUEDSIGNATURE INTERIOR DEMOLI05/03/2013
BISPLISSUEDGENESIS PLBG AND HTG CORP03/21/2012
BISOTISSUEDJLS DESIGNS ARCHITECTURE03/19/2012
BISEQISSUEDJLS DESIGNS ARCHITECTURE03/19/2012
BISEQISSUEDLAKHI GENERAL CONTRACTOR10/07/2011
BISOTISSUEDSINGH WELDING LLC09/27/2011
BISEQISSUEDSTEEL INDUSTRIES, INC09/20/2011
+ 13 more permits on file
1 project · most recent 03/25/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026Signed-offCONSTRUCTION BROOKLYN INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZSM36NAMHZ 42,000 BTU · Heat Pump Outdoor ×6
PEFY-P24NMAU-E4 27,000 BTU · Vrf Indoor ×4
MXZSM48NAMHZ 54,000 BTU · Heat Pump Outdoor ×3
PEFY-P12NMAU-E4 13,500 BTU · Vrf Indoor ×2
PEFY-P18NMAU-E4 20,000 BTU · Vrf Indoor ×2
PEFY-P30NMAU-E4 34,000 BTU · Vrf Indoor ×2
Ventilation
Renewaire EVPREMIUM M 225 CFM · Erv ×2
1 project · most recent 03/25/2026
Sprinkler System
FiledStatusContractorScope
03/25/2026Signed-offR.J.C. MECHANICAL CORPSprinkler System
1 project · most recent 03/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/25/2026Permit IssuedR.J.C. MECHANICAL CORPGas, Water/Sanitary
6 projects · most recent 02/24/2025
General Wiring
FiledStatusContractorScope
02/24/2025CompleteCRESCO ELECTRICAL CORPGeneral Wiring
05/23/2022CompleteCRESCO ELECTRICAL CORPGeneral Wiring
01/05/2022CompleteLINA ELECTRIC, CORPGeneral Wiring
11/18/2020CompleteGSA ELECTRIC CORP.General Wiring
07/30/2020CompleteBOROWIDE ELECT'L CONTR'S—
02/28/2019CompleteGSA ELECTRIC CORP.—
1 project · most recent 03/25/2026
FiledStatusContractorScope
03/25/2026Signed-offR.J.C. MECHANICAL CORP1 scope_items
1 project · most recent 05/19/2026
FiledStatusContractorScope
05/19/2026———
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/15/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/11/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
03/09/2026Fire-Resistant Penetrations and JointsDAMIAN ZUNINOspecial
03/09/2026Tenant Protection Plan ComplianceERIC BERLENTspecial
08/15/2025Sprinkler SystemsNicolas Crosettospecial
08/15/2025Fire-Resistant Penetrations and JointsDAMIAN ZUNINOspecial
08/15/2025Post-installed AnchorsNicolas Crosettospecial
07/31/2025Fenestration and door U-factor and product ratingsDAMIAN ZUNINOenergy_progress
07/31/2025Lighting in dwelling unitsDAMIAN ZUNINOenergy_progress
07/31/2025FinalDAMIAN ZUNINOprogress
07/31/2025Fire-Resistant Penetrations and JointsDAMIAN ZUNINOspecial
07/31/2025Energy Code Compliance InspectionsDAMIAN ZUNINOprogress
07/31/2025Fire-Resistance Rated ConstructionDAMIAN ZUNINOprogress
07/31/2025Fenestration air leakageDAMIAN ZUNINOenergy_progress
07/31/2025Lighting controlsDAMIAN ZUNINOenergy_progress
03/28/2025HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
03/28/2025HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
03/28/2025Heating SystemsERIC BERLENTspecial
03/28/2025Fire-Resistant Penetrations and JointsDAMIAN ZUNINOspecial
03/28/2025Mechanical SystemsERIC BERLENTspecial
03/28/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
03/28/2025FinalERIC BERLENTprogress
03/28/2025HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
03/10/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
03/10/2025Fire-Resistant Penetrations and JointsDAMIAN ZUNINOspecial
03/10/2025HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
03/10/2025HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
Latest 25 of 62.
▾Documents — 399 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch16
09/03/2026M00658012-I1Request digital key ↗
09/02/2026M00778262-I1Request digital key ↗
09/02/2026M00778262-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00417451-I1Request digital key ↗
08/15/2026M00417451-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00378143-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00423430-I1Request digital key ↗
▸Applications & Permits59
▸BISWORK PERMIT APPLICATION31
04/20/2021140974621Open ↗
11/18/2020140974621Open ↗
11/13/2020140974621Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION27
04/13/2021123842869Open ↗
01/21/2021140974621Open ↗
01/20/2021140974621Open ↗
Showing 3 of 27 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/09/2014121839109Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/23/2018121839109Open ↗
▸Seals & Professional Certifications122
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
02/27/2020123842869Open ↗
11/13/2019123533453Open ↗
11/13/2019123533453Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/27/2026M00900492-P3Open ↗
09/27/2026M00900492-P3Open ↗
08/31/2026M00900492-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/02/2026M00778262-I1Open ↗
09/02/2026M00778262-P1Open ↗
08/18/2026M00900492-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/27/2026M00900492-P3Open ↗
09/27/2026M00900492-P3Open ↗
08/31/2026M00900492-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
04/03/2014121952486Open ↗
11/22/2013121839109Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/06/2020140974621Open ↗
04/03/2014121952486Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/06/2020140974621Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/06/2020140974621Open ↗
▸Trade Schedules & Equipment19
▸BISSELF-CERT PLUMBING NOTICE7
03/06/2015121819461Open ↗
02/04/2015121819461Open ↗
01/05/2015121844576Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING4
11/27/2013121819461Open ↗
11/27/2013121844576Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
03/23/2016121819461Open ↗
02/09/2016121819461Open ↗
02/09/2016121819461Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/23/2016121819461Open ↗
02/09/2016121819461Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/08/2018123533453Open ↗
09/24/2015121839109Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
06/05/2014121844576Open ↗
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes4
02/27/2020123842869Open ↗
08/08/2018123533453Open ↗
01/21/2021140974621Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00378143-I1Open ↗
08/13/2026M00417451-P1Open ↗
08/13/2026M00423430-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
09/04/2015122496860Open ↗
12/26/2013121839109Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos34
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/02/2026M00778262-I1Open ↗
09/02/2026M00778262-P1Open ↗
08/18/2026M00900492-P8Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
11/06/2020140974621Open ↗
02/27/2020123842869Open ↗
08/08/2018123533453Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
02/27/2020123842869Open ↗
09/25/2018123533453Open ↗
12/08/2016122496860Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
09/08/2021140974621Open ↗
09/08/2021140974621Open ↗
04/15/2021123842869Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
09/08/2021140974621Open ↗
11/13/2019123533453Open ↗
05/23/2018121839109Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/15/2021123842869Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/06/2020140974621Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00778262-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
09/08/2021140974621Open ↗
09/08/2021140974621Open ↗
04/15/2021123842869Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
09/08/2021140974621Open ↗
04/15/2021123842869Open ↗
11/13/2019123533453Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
04/14/2016121839109Open ↗
09/29/2015121839109Open ↗
09/29/2015121839109Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/19/2014121844576Open ↗
Showing 1 of 3 on file for this type
▸BISSUPERSEDING LETTER1
11/18/2020140974621Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT26
11/06/2020140974621Open ↗
02/27/2020123842869Open ↗
11/13/2019123533453Open ↗
Showing 3 of 26 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/15/2021123842869Open ↗
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET15
02/27/2020123842869Open ↗
08/08/2018123533453Open ↗
09/04/2015122496860Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM9
04/20/2021140974621Open ↗
11/13/2019123533453Open ↗
07/24/2018121839109Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION3
04/15/2021123842869Open ↗
01/21/2021140974621Open ↗
12/13/2016122496860Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/06/2020140974621Open ↗
Showing 1 of 2 on file for this type
▸Other Documents5
▸BISPLOT DIAGRAM3
11/22/2013121839109Open ↗
11/22/2013121839109Open ↗
12/18/2013121839109Open ↗
▸BISLOFT BOARD CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/17/2026M01404648-I1Open ↗