← Back
Limited service hotel, often national chain
The Gorham Hotel
136 WEST 55 STREET · Midtown-Times Square · BIN 1023383
💬 Discuss this project
1929Year Built
16Stories
H3Building Class
C6-6.5Zoning
70,478 sfGross Floor Area
119Units
LL97 CoveredRent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FISP: UNSAFE
Limited service hotel, often national chain · Owner of record: B2D2 GORHAM · 5,020 sf lot · 14.04 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 6 filings · 20 docs
Floor 15p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLAKELY HOTEL907/08/2026
KINGS GROUP NY804/09/2026
B2D2 GORHAM403/22/2026
MORA HTEL CORP. N.V.103/22/2026
MORE HOTEL CORP. N.Y.103/22/2026
CHASCONA INC103/22/2026
NEW CINGULAR WIRELESS PCS, LLC203/21/2026
B202 GORHAN403/21/2026
BLAKELY503/21/2026
MORA HOTEL CORP NDD B A GORHAM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor1607/08/2026
KINGS GROUP NY CORPGeneral Contractor1508/05/2026
VEMA GROUP LLCGeneral Contractor908/11/2026
JACOBS TELECOMMUN. INCGeneral Contractor507/08/2026
4 MORI CONSTRUCTION INCGeneral Contractor407/08/2026
ALEXANDER EUGENEElectrical103/21/2026
ASE HVAC INCGeneral Contractor107/08/2026
SIMMONS, ANDREElectrical103/21/2026
SIEG DESIGN CONSTR ASSOElectrical103/21/2026
GREENE, JElectrical103/21/2026
BENJAMIN DREBINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SE INSPECTIONS7486108/31/2023
SRA INSPECTIONS3461308/31/2023
AR-TECH ENGINEERING, P.C.6659103/22/2022
SCHERER DESIGN GROUP7921112/14/2021
Building Lifecycle
All (171)Filed (21)Permit Issued (37)Signed Off (1)Facade (FISP) (13)Violation (60)Inspection (1)Objection (18)Special Inspection (20)
08/29/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/10/2026
Permit issued — Sidewalk Shed
M00980149-I1-SH
08/04/2026
Permit issued — Sidewalk Shed
M00919250-I1-SH
04/14/2026
Permit issued — Suspended Scaffold
M01042967-I1-SC
03/11/2026
Permit issued — Supported Scaffold
M01078545-I1-SF
01/22/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01078545-P1
01/20/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy.
M01042967-P3
01/20/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
01/15/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
01/05/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy.
M01042967-P2
01/02/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
12/22/2025
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00980149-P2
11/18/2025
Permit issued — Sidewalk Shed
M00919250-S1-SF
11/17/2025
Permit issued — Supported Scaffold
M00919250-S1-SH
09/18/2025
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00980149-P1
09/03/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/19/2025
Permit issued — Sidewalk Shed
M00980149-I1-SH
08/08/2025
Permit issued — Sidewalk Shed
M00919250-I1-SF
08/07/2025
Permit issued — Supported Scaffold
M00919250-I1-SH
07/31/2025
Permit issued — Protection and Mechanical Methods
M00980185-I1-PMM
06/04/2025
Violation issued (HPD, closed)
A
04/14/2025
Permit issued — Suspended Scaffold
M01042967-I1-SC
11/22/2024
Violation issued (HPD, closed)
I
11/20/2024
Permit issued — Supported Scaffold
M00919250-S1-SF
11/20/2024
Permit issued — Supported Scaffold
M00919250-S1-SH
11/19/2024
Filed — Alteration
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or ergess. work shall comply with chapter 33 of nycc.
M00919250-S1
11/15/2024
Permit issued — Suspended Scaffold
M01042967-I1-SC
11/04/2024
Permit issued — Suspended Scaffold
M01129963-I1-SC
10/22/2024
Filed — Alteration
M01129963-I1
09/17/2024
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy.
M01042967-P1
09/17/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
08/13/2024
Permit issued — Sidewalk Shed
M00919250-I1-SH
08/13/2024
Permit issued — Supported Scaffold
M00919250-I1-SF
07/29/2024
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01078545-I1
07/29/2024
Permit issued — Supported Scaffold
M01078545-I1-SF
05/08/2024
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00980149-I1
05/08/2024
Permit issued — Suspended Scaffold
M01042967-I1-SC
05/08/2024
Permit issued — Sidewalk Shed
M00980149-I1-SH
05/06/2024
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy.
M01042967-I1
04/01/2024
Violation issued (HPD, closed)
A
03/08/2024
Filed — Alteration
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00980185-I1
03/08/2024
Permit issued — Protection and Mechanical Methods
M00980185-I1-PMM
12/05/2023
Cycle 9 facade report submitted
12/05/2023
Cycle 9 facade report signed — UNSAFE
11/15/2023
Violation issued (HPD, closed)
I
11/10/2023
Cycle 9 facade inspection completed
10/26/2023
Permit issued — General Construction
M00902487-I1-GC
09/20/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00110030-I1
09/13/2023
Special inspection requirement — Final
Spencer Goroff
09/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
Adrian Figueroa
08/31/2023
Filed — Alteration
MINOR RENOVATION TO AN EXISTING RESTAURANT ON THE FIRST FLOOR. THE SCOPE OF WORK DOES NOT CHANGE USE, OCCUPANCY OR EGRESS.
M00902487-P1
08/31/2023
Filed — Alteration
MODIFICATION OF THE PLUMBING SYSTEM TO ADJUST TO A RENOVATED EATING & DRINKING ESTABLISHMENT ON 1ST FLR. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00927428-I1
08/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Adrian Figueroa
08/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
08/30/2023
Special inspection requirement — Tenant Protection Plan Compliance
Adrian Figueroa
08/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Adrian Figueroa
08/30/2023
Special inspection requirement — Post-installed Anchors
Spencer Goroff
08/29/2023
Special inspection requirement — Final
Spencer Goroff
08/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
Adrian Figueroa
08/17/2023
Filed — Alteration
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or ergess. work shall comply with chapter 33 of nycc.
M00919250-I1
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedVEMA GROUP LLC08/10/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP08/04/2026
DOB NOWSuspended ScaffoldPermit IssuedVEMA GROUP LLC04/14/2026
DOB NOWSupported ScaffoldPermit IssuedVEMA GROUP LLC03/11/2026
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP11/18/2025
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP11/17/2025
DOB NOWSidewalk ShedPermit IssuedVEMA GROUP LLC08/19/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP08/08/2025
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP08/07/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedVEMA GROUP LLC07/31/2025
DOB NOWSuspended ScaffoldPermit IssuedVEMA GROUP LLC04/14/2025
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP11/20/2024
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP11/20/2024
DOB NOWSuspended ScaffoldPermit IssuedVEMA GROUP LLC11/15/2024
DOB NOWSuspended ScaffoldPermit IssuedVERTICAL RIGGING INC11/04/2024
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP08/13/2024
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP08/13/2024
DOB NOWSupported ScaffoldPermit IssuedVEMA GROUP LLC07/29/2024
DOB NOWSuspended ScaffoldPermit IssuedVEMA GROUP LLC05/08/2024
DOB NOWSidewalk ShedPermit IssuedVEMA GROUP LLC05/08/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedVEMA GROUP LLC03/08/2024
DOB NOWGeneral ConstructionPermit IssuedASE HVAC INC10/26/2023
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP08/17/2023
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP08/17/2023
DOB NOWGeneral ConstructionPermit Issued4 MORI CONSTRUCTION INC07/28/2023
DOB NOWGeneral ConstructionPermit Issued4 MORI CONSTRUCTION INC07/28/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/27/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/02/2022
DOB NOWAntennaPermit IssuedARMENTUM DIGITAL INFRASTR02/14/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/03/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/06/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/03/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/20/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/27/2018
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/13/2018
DOB NOWAntennaPermit IssuedARMENTUM DIGITAL INFRASTR10/17/2018
DOB NOWAntennaPermit IssuedARMENTUM DIGITAL INFRASTR05/25/2018
BISOTISSUEDVEMA GROUP LLC03/23/2026
BISOTISSUEDVEMA GROUP LLC11/07/2025
BISOTISSUEDVEMA GROUP LLC02/28/2025
+ 47 more permits on file
1 project · most recent 03/22/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/22/2022——Air Conditioning Systems, Heating Systems
Cooling
Johnson Controls GAW14L60C22SA 171,500 BTU · Wshp ×1
Heating
Johnson Controls GAW14L60C22SA 54,000 BTU · Wshp ×1
1 project · most recent 08/31/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/31/2023——Gas, Water/Sanitary
6 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedBERNARDI ELECTRIC INC.General Wiring
10/17/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
09/05/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
01/09/2021CompleteGREEN APPLE ELECL SVCS LLGeneral Wiring
12/09/2020CompleteGREEN APPLE ELECL SVCS LL—
12/13/2018CompleteTOP SHELF ELECTRIC CORP—
3 projects · most recent 01/22/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
01/22/2026Permit IssuedVEMA GROUP LLCScaffold
12/22/2025Permit IssuedVEMA GROUP LLCSidewalk Shed
11/19/2024Permit IssuedKINGS GROUP NY CORPScaffold, Sidewalk Shed
1 project · most recent 01/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/20/2026Permit IssuedVEMA GROUP LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/03/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/20/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
01/15/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
01/02/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
09/17/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
09/13/2023FinalSpencer Goroffprogress
09/13/2023Tenant Protection Plan ComplianceAdrian Figueroaspecial
08/30/2023Energy Code Compliance InspectionsAdrian Figueroaprogress
08/30/2023Fire-Resistant Penetrations and JointsSpencer Goroffspecial
08/30/2023Tenant Protection Plan ComplianceAdrian Figueroaspecial
08/30/2023HVAC-R and service water piping design and insulationAdrian Figueroaenergy_progress
08/30/2023Post-installed AnchorsSpencer Goroffspecial
08/29/2023FinalSpencer Goroffprogress
08/29/2023Tenant Protection Plan ComplianceAdrian Figueroaspecial
03/22/2022Permanent certificateAlexander Zabasajjaenergy_progress
03/22/2022Maintenance informationAlexander Zabasajjaenergy_progress
03/22/2022Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
03/22/2022HVAC-R and service water heating equipmentAlexander Zabasajjaenergy_progress
03/22/2022Heating SystemsALBERTO ROMANspecial
02/25/2022Final—progress
02/25/2022Mechanical SystemsALBERTO ROMANspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Black TapRestaurant / Food Service—
Project M00687541 Alteration · Approved · 03/22/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 295 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch19
09/03/2026M00584650-I1Request digital key ↗
08/29/2026M00902487-P1Request digital key ↗
08/29/2026M00902487-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/06/2026M00110030-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026M00348895-I1Request digital key ↗
▸Applications & Permits49
▸BISWORK PERMIT APPLICATION22
03/04/2025140935086Open ↗
06/21/2023140935086Open ↗
06/02/2022140935086Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION20
05/07/2024140935086Open ↗
05/02/2024140935086Open ↗
10/06/2020140935086Open ↗
Showing 3 of 20 on file for this type
▸BISPLACE OF ASSEMBLY6
08/16/2017123352022Open ↗
08/10/2017123352022Open ↗
09/17/2014120061896Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
12/17/2013120061896Open ↗
▸Seals & Professional Certifications83
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
11/08/2019123235061Open ↗
11/08/2019123235061Open ↗
06/12/2019123902795Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/06/2026M00010883-I1Open ↗
08/29/2026M00902487-I1Open ↗
08/29/2026M00902487-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M01042967-I1Open ↗
09/02/2026M01042967-P1Open ↗
09/01/2026M00902487-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
09/14/2020140952440Open ↗
08/04/2020140935086Open ↗
06/12/2019123902795Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00902487-P1Open ↗
08/26/2026M00687541-I1Open ↗
08/26/2026M00687541-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
08/09/2018123235061Open ↗
04/30/2018123503850Open ↗
09/01/2016122635979Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/14/2020140952440Open ↗
08/04/2020140935086Open ↗
01/13/2014140151920Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/14/2020140952440Open ↗
08/04/2020140935086Open ↗
01/13/2014140151920Open ↗
▸BISProfessional and Owner Certification (POC3)2
09/01/2016122635979Open ↗
09/01/2016122635979Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/09/2018123235061Open ↗
04/30/2018123503850Open ↗
09/01/2016122635979Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/26/2017123047372Open ↗
▸BISEQUIPMENT USE PERMITS1
12/26/2017123047372Open ↗
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes8
08/09/2018123235061Open ↗
04/27/2017123047372Open ↗
11/16/2016122944485Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00348895-I1Open ↗
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
08/04/2020140935086Open ↗
06/12/2019123902795Open ↗
08/09/2018123235061Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026M00902487-I1Open ↗
08/29/2026M00902487-P1Open ↗
08/15/2026M00010883-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
11/08/2019123235061Open ↗
06/12/2019123902795Open ↗
04/30/2018123503850Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
11/08/2019123235061Open ↗
01/02/2018123047372Open ↗
07/06/2017122944485Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/14/2020140952440Open ↗
08/04/2020140935086Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/14/2020140952440Open ↗
08/04/2020140935086Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
01/13/2014140151920Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/01/2024140935086Open ↗
09/14/2020140952440Open ↗
08/04/2020140935086Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
11/08/2019123235061Open ↗
03/07/2018123047372Open ↗
02/12/2018123047372Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER4
03/04/2025140935086Open ↗
06/21/2023140935086Open ↗
06/21/2023140935086Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/02/2022140935086Open ↗
07/06/2017122944485Open ↗
01/03/2013120699119Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
05/24/2011120699119Open ↗
Showing 1 of 3 on file for this type
▸BISSHED LETTER1
01/12/2015140151920Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT22
05/01/2024140935086Open ↗
09/14/2020140952440Open ↗
08/04/2020140935086Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms25
▸BISBOROUGH INTAKE FORM10
03/04/2025140935086Open ↗
06/21/2023140935086Open ↗
06/02/2022140935086Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET9
06/12/2019123902795Open ↗
08/09/2018123235061Open ↗
04/30/2018123503850Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION3
05/07/2024140935086Open ↗
10/06/2020140935086Open ↗
10/15/2019123235061Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
09/14/2020140952440Open ↗
08/04/2020140935086Open ↗
01/13/2014140151920Open ↗
▸Other Documents11
▸DOB NOWManufacturer's Specifications4
08/13/2026M01042967-P3Open ↗
08/13/2026M01042967-I1Open ↗
08/13/2026M01042967-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026M01042967-I1Open ↗
08/13/2026M01042967-P3Open ↗
08/13/2026M01042967-P1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/16/2017123352022Open ↗
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION1
08/18/2014122044563Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01129963-I1Open ↗