← Back
Five to six families
1360 66 STREET
BROOKLYN · BIN 3142567
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R5BZoning
3,900 sfGross Floor Area
6Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 1360-66TH STREET CORP. · 2,000 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1360-66TH STREET CORP.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC205/29/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116205/29/2024
Building Lifecycle
All (28)Filed (2)Permit Issued (1)Signed Off (1)Violation (19)Special Inspection (5)
06/06/2025
Violation issued (HPD, closed)
A
06/03/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00999796-I1
05/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
05/31/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
05/31/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
05/31/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
05/29/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00999796-P1
02/15/2024
Permit issued — Solar
B00999796-I1-SL
02/13/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00999796-I1
02/22/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
I
04/06/2021
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
I
10/29/2019
Violation issued (HPD, closed)
I
10/15/2018
Violation issued (HPD, closed)
I
11/17/2017
Violation issued (HPD, closed)
I
11/30/2016
Violation issued (HPD, closed)
B
11/02/2016
Violation issued (HPD, closed)
I
10/29/2013
Violation issued (HPD, closed)
B
02/19/2008
Violation issued (HPD, open)
B
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/17/1990
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
08/26/1985
Violation issued (HPD, open)
B
08/26/1985
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP02/15/2024
1 project · most recent 01/31/2024
FiledStatusContractorScope
01/31/2024CompleteJSP ELECTL CNTNG CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/31/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
05/31/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
05/31/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
05/31/2024FinalVYACHESLAV NECHAYEVprogress
05/31/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00999796-I1Request digital key ↗
08/26/2026B00999796-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026B00999796-I1Open ↗
08/24/2026B00999796-I1Open ↗
08/24/2026B00999796-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00999796-P1Open ↗
08/26/2026B00999796-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B00999796-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00999796-I1Open ↗
08/26/2026B00999796-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00999796-I1Open ↗