← Back
Predominantly retail with other uses
1361 61 STREET
BROOKLYN · BIN 3141324
💬 Discuss this project
1931Year Built
3Stories
K4Building Class
M1-1Zoning
4,080 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: SWL INTERNATIONAL CO · 2,000 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof2p · 1 filing · 20 docs
Floor 34p · 2 filings · 20 docs
Floor 21p · 1 filing · 10 docs
Floor 12p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SWL INT'L CORP803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LU ENGINEERING SERVICE PC412/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H&Z BUILDING CONSULTING IGeneral Contractor403/21/2026
TRI STATE PLBG & HTG INCPlumbing207/08/2026
KJK ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LU ENGINEERING SERVICE PC6575412/02/2021
Building Lifecycle
All (52)Filed (4)Permit Issued (4)Signed Off (2)Violation (6)Inspection (6)Special Inspection (30)
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2022
Signed off — Alteration
PROPOSED RENOVATION ON CEL, 1ST, 2ND & 3RD FLOOR AND OSP. REPAIRING PARTITION, FLOORING, CEILING. STORE FRONT, AND INSTALL AC UNITS AS PER PLAN. BOILER & PLUMBING WORK FILE SEPARATE JOB#B00510961. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00510824-I1
04/22/2022
Signed off — Alteration
SUBMIT PLUMBING WORK AND CAP/REMOVE 1- COM. BOILER(#110980) PEERLESS MOD:61-08-STD-S. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION #B00510824.
B00510961-I1
03/22/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/03/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/03/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/25/2022
Permit issued — Plumbing
B00510961-I1-PL
12/04/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
DONGSHENG LU
12/04/2021
Special inspection requirement — Fire-Resistance Rated Construction
DONGSHENG LU
12/04/2021
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
12/04/2021
Special inspection requirement — Final
DONGSHENG LU
12/04/2021
Special inspection requirement — Insulation placement and R values
DONGSHENG LU
12/04/2021
Special inspection requirement — Maintenance information
DONGSHENG LU
12/04/2021
Special inspection requirement — HVAC-R and service water heating system controls
DONGSHENG LU
12/04/2021
Special inspection requirement — Fenestration areas
DONGSHENG LU
12/04/2021
Special inspection requirement — Interior lighting power
DONGSHENG LU
12/04/2021
Special inspection requirement — HVAC-R and service water heating equipment
DONGSHENG LU
12/04/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
DONGSHENG LU
12/04/2021
Special inspection requirement — Fenestration air leakage
DONGSHENG LU
12/04/2021
Special inspection requirement — Air barrier - visual inspection
DONGSHENG LU
12/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
12/04/2021
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
12/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
12/04/2021
Special inspection requirement — Mechanical Systems
DONGSHENG LU
12/02/2021
Filed — Alteration
SUBMIT PLUMBING WORK AND CAP/REMOVE 1- COM. BOILER(#110980) PEERLESS MOD:61-08-STD-S. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION #B00510824.
B00510961-P1
12/02/2021
Filed — Alteration
PROPOSED RENOVATION ON CEL, 1ST, 2ND & 3RD FLOOR AND OSP. REPAIRING PARTITION, FLOORING, CEILING. STORE FRONT, AND INSTALL AC UNITS AS PER PLAN. BOILER & PLUMBING WORK FILE SEPARATE JOB#B00510961. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00510824-P1
12/01/2021
Special inspection requirement — Mechanical Systems
DONGSHENG LU
12/01/2021
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
12/01/2021
Special inspection requirement — Final
DONGSHENG LU
12/01/2021
Special inspection requirement — Fire-Resistance Rated Construction
DONGSHENG LU
12/01/2021
Special inspection requirement — Insulation placement and R values
DONGSHENG LU
12/01/2021
Special inspection requirement — Air barrier - visual inspection
DONGSHENG LU
12/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
DONGSHENG LU
12/01/2021
Special inspection requirement — Interior lighting power
DONGSHENG LU
12/01/2021
Special inspection requirement — Fenestration air leakage
DONGSHENG LU
12/01/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
DONGSHENG LU
12/01/2021
Special inspection requirement — Maintenance information
DONGSHENG LU
12/01/2021
Special inspection requirement — HVAC-R and service water heating system controls
DONGSHENG LU
12/01/2021
Special inspection requirement — Fenestration areas
DONGSHENG LU
08/17/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/11/2021
Permit issued — Plumbing
B00510961-I1-PL
05/11/2021
Permit issued — Mechanical Systems
B00510824-I1-GC
05/11/2021
Permit issued — General Construction
B00510824-I1-MS
04/27/2021
Filed — Alteration
PROPOSED RENOVATION ON CEL, 1ST, 2ND & 3RD FLOOR AND OSP. REPAIRING PARTITION, FLOORING, CEILING. STORE FRONT, AND INSTALL AC UNITS AS PER PLAN. BOILER & PLUMBING WORK FILE SEPARATE JOB#B00510961. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00510824-I1
04/27/2021
Filed — Alteration
SUBMIT PLUMBING WORK AND CAP/REMOVE 1- COM. BOILER(#110980) PEERLESS MOD:61-08-STD-S. NO CHANGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION #B00510824.
B00510961-I1
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC01/25/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC08/11/2021
DOB NOWMechanical SystemsSigned-offH&Z BUILDING CONSULTING I05/11/2021
DOB NOWGeneral ConstructionSigned-offH&Z BUILDING CONSULTING I05/11/2021
BISOTISSUEDWILLIAM JAMES BUSHELL COR04/12/2023
BISPLISSUEDWAGNER ZIV PLBG & HTG CORP03/22/2005
BISOTISSUEDYUNG FONG CONSTRUCTION03/21/2005
BISBLISSUEDNAT'L MECH. SVCS PLBG LLC11/24/2000
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC11/24/2000
BISOTISSUEDSTUART ISER INC11/22/2000
2 projects · most recent 07/10/2023
General Wiring
FiledStatusContractorScope
07/10/2023CompleteS&R ELECTRICAL & MECHANIC—
07/14/2022CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/03/2022Fail-Final General Construction Non-Directive 14FailView ↗
02/03/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/04/2021HVAC-R and service water piping design and insulationDONGSHENG LUenergy_progress
12/04/2021Fire-Resistance Rated ConstructionDONGSHENG LUprogress
12/04/2021Energy Code Compliance InspectionsDONGSHENG LUprogress
12/04/2021FinalDONGSHENG LUprogress
12/04/2021Insulation placement and R valuesDONGSHENG LUenergy_progress
12/04/2021Maintenance informationDONGSHENG LUenergy_progress
12/04/2021HVAC-R and service water heating system controlsDONGSHENG LUenergy_progress
12/04/2021Fenestration areasDONGSHENG LUenergy_progress
12/04/2021Interior lighting powerDONGSHENG LUenergy_progress
12/04/2021HVAC-R and service water heating equipmentDONGSHENG LUenergy_progress
12/04/2021Fenestration and door U-factor and product ratingsDONGSHENG LUenergy_progress
12/04/2021Fenestration air leakageDONGSHENG LUenergy_progress
12/04/2021Air barrier - visual inspectionDONGSHENG LUenergy_progress
12/04/2021Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
12/04/2021Energy Code Compliance InspectionsDONGSHENG LUprogress
12/04/2021Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
12/04/2021Mechanical SystemsDONGSHENG LUspecial
12/01/2021Mechanical SystemsDONGSHENG LUspecial
12/01/2021Energy Code Compliance InspectionsDONGSHENG LUprogress
12/01/2021FinalDONGSHENG LUprogress
12/01/2021Fire-Resistance Rated ConstructionDONGSHENG LUprogress
12/01/2021Insulation placement and R valuesDONGSHENG LUenergy_progress
12/01/2021Air barrier - visual inspectionDONGSHENG LUenergy_progress
12/01/2021HVAC-R and service water heating equipmentDONGSHENG LUenergy_progress
12/01/2021Interior lighting powerDONGSHENG LUenergy_progress
Latest 25 of 31.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00510824-I1Request digital key ↗
09/01/2026B00510824-P1Request digital key ↗
09/01/2026B00510961-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/11/2023340885242Open ↗
▸BISWORK PERMIT APPLICATION1
04/12/2023340885242Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature26
08/31/2026B00510824-P1Open ↗
08/31/2026B00510824-P1Open ↗
08/31/2026B00510824-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026B00510824-P1Open ↗
08/31/2026B00510824-P1Open ↗
08/31/2026B00510961-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00510824-I1Open ↗
09/01/2026B00510824-P1Open ↗
09/01/2026B00510961-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/11/2023340885242Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/11/2023340885242Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/11/2023340885242Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
04/12/2023340885242Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00510824-I1Open ↗
09/01/2026B00510824-P1Open ↗
09/01/2026B00510961-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/11/2023340885242Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/27/2023340885242Open ↗
10/27/2023340885242Open ↗
04/12/2023340885242Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00510824-I1Open ↗
08/13/2026B00510961-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/11/2023340885242Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/27/2023340885242Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/11/2023340885242Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
10/27/2023340885242Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/27/2023340885242Open ↗
10/27/2023340885242Open ↗
04/12/2023340885242Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/30/2023340885242Open ↗
10/30/2023340885242Open ↗
10/30/2023340885242Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/30/2023340885242Open ↗
▸BISFINAL1
10/27/2023340885242Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
10/27/2023340885242Open ↗
▸BISCOST AFFIDAVIT1
04/11/2023340885242Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/11/2023340885242Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
10/30/2023340885242Open ↗
10/30/2023340885242Open ↗