1963Year Built
1Stories
K1Building Class
R3-2Zoning
16,721 sfGross Floor Area
4Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
One story retail building · Owner of record: 1361 HYLAN BOULEVARD ASSOCIATES LLC · 54,000 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1361 HYLAN BLVD ASSOCIATES10407/08/2026
CVS303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MASSA MULTIMEDIA ARCHITECTURE203/21/2026
BUILDING BROTHERS2203/21/2026
DOMINION EXPEDITING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ULTIMATE SIGNS DESIGNSScaffold1107/08/2026
ZEKI ELECTRICAL MNGMT SVCGeneral Contractor407/08/2026
JIM HALL HEATING & AIR COGeneral Contractor203/21/2026
MELITO CONSTRUCTION CORPGeneral Contractor203/21/2026
ONOFRIO LODUCA PLBG CORPPlumbing207/08/2026
GORDON, CHARLENEElectrical103/21/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
LOCAL UNION 14/14B I.U.OElectrical103/21/2026
JAMES GIORGIO, JRElectrical103/21/2026
MAGLIOLA, FElectrical103/21/2026
ULTIMATE SIGNS & ELEC CORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216112/27/2022
CHOI ENGINEERING PLLC2264308/10/2022
OBAID MIAN849102/24/2020
Building Lifecycle
All (87)Filed (18)Permit Issued (18)Signed Off (17)Violation (3)Inspection (1)Special Inspection (30)
01/17/2023
Signed off — Alteration
MAKE DIRECT REPLACEMENT OF FURNACE NO GAS PIPE ALTERATION NEEDED DISCONNECTED OLD UNIT FROM GAS UNION AFTER APPLIANCE SHUT OFF VALVE AND RECONNECTED TO NEW DIRECT REPLACEMENT FURNACE.
S00802760-I1
01/17/2023
Signed off — Alteration
IN-KIND REPLACEMENT OF 2- EXISTING 3 TON ROOF TOP HVAC UNITS ON EXISTING DUNAGE.
S08055029-I1
01/10/2023
Permit issued — Mechanical Systems
S08055029-I1-MS
01/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/04/2023
Permit issued — Plumbing
S00802760-I1-PL
12/27/2022
Filed — Alteration
MAKE DIRECT REPLACEMENT OF FURNACE NO GAS PIPE ALTERATION NEEDED DISCONNECTED OLD UNIT FROM GAS UNION AFTER APPLIANCE SHUT OFF VALVE AND RECONNECTED TO NEW DIRECT REPLACEMENT FURNACE.
S00802760-I1
12/27/2022
Filed — Alteration
IN-KIND REPLACEMENT OF 2- EXISTING 3 TON ROOF TOP HVAC UNITS ON EXISTING DUNAGE.
S08055029-I1
12/14/2022
Special inspection requirement — Final
Steven Savino
12/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
12/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
12/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
12/14/2022
Special inspection requirement — Mechanical Systems
Steven Savino
09/19/2022
Signed off — Alteration
Mechanical/lighting work filed in conjunction with General renovation of existing retail space CVS. No change to use, egress or occupancy.
S00735721-S1
08/19/2022
Signed off — Alteration
Mechanical/lighting work filed in conjunction with General renovation of existing retail space CVS. No change to use, egress or occupancy.
S00735721-I1
08/10/2022
Filed — Alteration
Mechanical/lighting work filed in conjunction with General renovation of existing retail space CVS. No change to use, egress or occupancy.
S00735721-P1
08/10/2022
Special inspection requirement — Lighting controls
Eugene Choi
08/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Eugene Choi
08/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
Eugene Choi
08/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eugene Choi
08/10/2022
Special inspection requirement — Mechanical Systems
Eugene Choi
08/10/2022
Special inspection requirement — Final
Eugene Choi
08/10/2022
Special inspection requirement — Maintenance information
Eugene Choi
08/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
Eugene Choi
08/10/2022
Special inspection requirement — Interior lighting power
Eugene Choi
07/29/2022
Special inspection requirement — Maintenance information
Eugene Choi
07/29/2022
Special inspection requirement — Interior lighting power
Eugene Choi
07/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
Eugene Choi
07/29/2022
Special inspection requirement — Mechanical Systems
Eugene Choi
07/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eugene Choi
07/29/2022
Special inspection requirement — Final
Eugene Choi
07/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Eugene Choi
07/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
Eugene Choi
07/29/2022
Special inspection requirement — Lighting controls
Eugene Choi
06/14/2022
Permit issued — Mechanical Systems
S00735721-S1-MS
06/14/2022
Permit issued — General Construction
S00735721-I1-GC
06/10/2022
Filed — Alteration
Mechanical/lighting work filed in conjunction with General renovation of existing retail space CVS. No change to use, egress or occupancy.
S00735721-S1
06/03/2022
Filed — Alteration
Mechanical/lighting work filed in conjunction with General renovation of existing retail space CVS. No change to use, egress or occupancy.
S00735721-I1
05/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Choi
05/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
Eugene Choi
05/11/2022
Special inspection requirement — Final
Eugene Choi
01/05/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2021
Violation issued (ECB, open)
Construction
08/24/2021
Signed off — Alteration
INSTALL NON-ILLUMINATED SIGN ON EXTERIOR WALL (HEALTH HUB)
S00554003-I1
08/24/2021
Signed off — Alteration
INSTALL NON-ILLUMINATED SIGN ON EXTERIOR WALL (HEALTH HUB)
S00553999-I1
07/21/2021
Permit issued — Sign
S00553999-I1-SG
07/21/2021
Permit issued — Sign
S00554003-I1-SG
07/20/2021
Filed — Alteration
INSTALL NON-ILLUMINATED SIGN ON EXTERIOR WALL (HEALTH HUB)
S00554003-I1
07/20/2021
Filed — Alteration
INSTALL NON-ILLUMINATED SIGN ON EXTERIOR WALL (HEALTH HUB)
S00553999-I1
03/26/2021
Signed off — Alteration
INSTALL NEW ELECTRIC HOT WATER HEATER, INSTALL ONE NON RESIDENTIAL SINK, RELOCATE ONE NON RESIDENTIAL SINK. NO CHANGE OF USE OCCUPANCY OR EGRESS
S00317559-I1
02/17/2021
Signed off — Alteration
Mechanical work to install new mini split unit, relocate 1 mini split unit and add new ductwork and registers. No change of use, occupancy or egress.
S00309075-I1
09/28/2020
Permit issued — Plumbing
S00317559-I1-PL
08/26/2020
Permit issued — Mechanical Systems
S00309075-I1-MS
08/25/2020
Permit issued — Plumbing
S00317559-I1-PL
02/24/2020
Filed — Alteration
INSTALL NEW ELECTRIC HOT WATER HEATER, INSTALL ONE NON RESIDENTIAL SINK, RELOCATE ONE NON RESIDENTIAL SINK. NO CHANGE OF USE OCCUPANCY OR EGRESS
S00317559-I1
02/24/2020
Filed — Alteration
Mechanical work to install new mini split unit, relocate 1 mini split unit and add new ductwork and registers. No change of use, occupancy or egress.
S00309075-I1
02/21/2020
Special inspection requirement — HVAC insulation and sealing
Obaid Mian
02/21/2020
Special inspection requirement — Maintenance information
Obaid Mian
02/21/2020
Special inspection requirement — HVAC and service water heating equipment
Obaid Mian
02/21/2020
Special inspection requirement — Maintenance information
Obaid Mian
09/17/2019
Signed off — Alteration
INSTALL NON-ILLUMINATED SIGN ON WALL (GROCERY)
S00187212-I1
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJIM HALL HEATING AIR01/10/2023
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI01/04/2023
DOB NOWMechanical SystemsSigned-offZEKI ELECTRICAL MNGMT SVC06/14/2022
DOB NOWGeneral ConstructionSigned-offZEKI ELECTRICAL MNGMT SVC06/14/2022
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/21/2021
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/21/2021
DOB NOWPlumbingSigned-offONOFRIO LODUCA PLBG CORP09/28/2020
DOB NOWMechanical SystemsSigned-offMELITO CONSTRUCTION CORP08/26/2020
DOB NOWPlumbingSigned-offONOFRIO LODUCA PLBG CORP08/25/2020
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/19/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/19/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/18/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/18/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/18/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/18/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/18/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/18/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO07/18/2019
BISOTISSUEDMELITO CONSTRUCTION CORP02/27/2020
BISMHISSUEDABCO MAINTENANCE INC07/17/2019
BISMHISSUEDABCO MAINTENANCE INC08/06/2018
BISOTISSUEDMELITO CONSTRUCTION CORP06/08/2018
BISMHISSUEDABCO MAINTENANCE INC01/18/2017
BIS—ISSUEDACTIVE SIGNS INC12/13/2016
BISOTISSUEDMELITO CONSTRUCTION CORP08/18/2016
BISOTISSUEDMELITO CONSTRUCTION CORP07/07/2016
BISOTISSUEDMELITO CONSTRUCTION CORP07/07/2016
BISOTISSUEDMELITO CONSTRUCTION CORP07/07/2016
BISSPISSUEDONOFRIO LODUCA PLBG CORP.08/21/2014
BISSPISSUEDONOFRIO LODUCA PLBG CORP.06/12/2013
BISOTISSUEDBIG A CONSTRUCTION GROUP03/21/2013
BISSPISSUEDONOFRIO LODUCA PLBG CORP.05/06/2012
BISPLISSUEDR. MCGLYNN PLUMBING CORP03/30/2012
BISOTISSUEDMENEMSHA DEV. GROUP INC03/06/2012
BISSPISSUEDONOFRIO LODUCA PLBG CORP.12/10/2010
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO11/24/2010
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO11/24/2010
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO11/24/2010
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO07/22/2010
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO07/22/2010
+ 28 more permits on file
8 projects · most recent 06/27/2022
General Wiring
FiledStatusContractorScope
06/27/2022CompleteOPTIMAL ELECTRIC, INC6 meters
10/28/2021CancelledTOP SHELF ELECTRIC CORP—
10/27/2020CompleteCOPPER-CITY ELECTRIC CORP—
07/24/2019CompleteELMHURST ELECTRIC CORPGeneral Wiring
07/19/2019CompleteULTIMATE SIGNS & ELEC COR—
07/19/2019CompleteULTIMATE SIGNS & ELEC COR—
07/19/2019CompleteULTIMATE SIGNS & ELEC COR—
03/01/2018CompleteELMHURST ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
12/14/2022FinalSteven Savinoprogress
12/14/2022HVAC-R and service water heating system controlsSteven Savinoenergy_progress
12/14/2022HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
12/14/2022HVAC-R and service water heating equipmentSteven Savinoenergy_progress
12/14/2022Mechanical SystemsSteven Savinospecial
08/10/2022Lighting controlsEugene Choienergy_progress
08/10/2022HVAC-R and service water piping design and insulationEugene Choienergy_progress
08/10/2022HVAC-R and service water heating equipmentEugene Choienergy_progress
08/10/2022Structural Stability – Alterations of existing buildingsEugene Choispecial
08/10/2022Mechanical SystemsEugene Choispecial
08/10/2022FinalEugene Choiprogress
08/10/2022Maintenance informationEugene Choienergy_progress
08/10/2022HVAC-R and service water heating system controlsEugene Choienergy_progress
08/10/2022Interior lighting powerEugene Choienergy_progress
07/29/2022Maintenance informationEugene Choienergy_progress
07/29/2022Interior lighting powerEugene Choienergy_progress
07/29/2022HVAC-R and service water heating equipmentEugene Choienergy_progress
07/29/2022Mechanical SystemsEugene Choispecial
07/29/2022Structural Stability – Alterations of existing buildingsEugene Choispecial
07/29/2022FinalEugene Choiprogress
07/29/2022HVAC-R and service water piping design and insulationEugene Choienergy_progress
07/29/2022HVAC-R and service water heating system controlsEugene Choienergy_progress
07/29/2022Lighting controlsEugene Choienergy_progress
05/11/2022Fire-Resistant Penetrations and JointsEugene Choispecial
05/11/2022Fire-Resistance Rated ConstructionEugene Choiprogress
Latest 25 of 37.
▾Documents — 423 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch - Sign9
08/26/2026S00187209-I1Request digital key ↗
08/26/2026S00187207-I1Request digital key ↗
08/26/2026S00187213-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch7
08/25/2026S00554003-I1Request digital key ↗
08/25/2026S00553999-I1Request digital key ↗
08/24/2026S00735721-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026S00309075-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026S00317559-I1Request digital key ↗
▸Applications & Permits65
▸BISWORK PERMIT APPLICATION34
02/28/2020520398276Open ↗
07/18/2019520381140Open ↗
07/18/2019520381140Open ↗
Showing 3 of 34 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION31
10/13/2021510010569Open ↗
01/30/2020520398276Open ↗
07/01/2019520381140Open ↗
Showing 3 of 31 on file for this type
▸Seals & Professional Certifications121
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION50
01/30/2020520398276Open ↗
09/27/2019520381140Open ↗
07/01/2019520381140Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026S00187209-I1Open ↗
08/26/2026S00187213-I1Open ↗
08/26/2026S00187204-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/28/2026S00735721-I1Open ↗
09/02/2026S00735721-S1Open ↗
09/02/2026S00735721-S1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
01/30/2020520398276Open ↗
07/01/2019520381140Open ↗
08/01/2018520339296Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
01/30/2020520398276Open ↗
07/01/2019520381140Open ↗
08/01/2018520339296Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
03/21/2013520126033Open ↗
03/06/2012520092676Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/28/2026S00735721-I1Open ↗
09/02/2026S00735721-S1Open ↗
08/25/2026S00735721-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment20
▸BISSELF-CERT PLUMBING NOTICE5
04/10/2012520092676Open ↗
04/10/2012520092676Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
09/27/2019520381140Open ↗
05/15/2019520339296Open ↗
01/13/2017520285334Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
03/06/2012520092676Open ↗
12/06/2010510010569Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
09/27/2019520381140Open ↗
05/15/2019520339296Open ↗
03/04/2011520030500Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/01/2019520381140Open ↗
01/13/2017520285334Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST5
01/30/2020520398276Open ↗
05/21/2018520336823Open ↗
07/08/2016520296206Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos38
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
03/06/2012520092676Open ↗
Showing 1 of 17 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/26/2026S00187209-I1Open ↗
08/26/2026S00187213-I1Open ↗
08/26/2026S00187204-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
01/30/2020520398276Open ↗
05/21/2018520336823Open ↗
12/13/2016520273695Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
01/30/2020520398276Open ↗
01/30/2020520398276Open ↗
09/27/2019520381140Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
09/27/2019520381140Open ↗
05/10/2019520339296Open ↗
09/07/2018520336823Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/26/2021520398276Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/26/2021520398276Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/06/2012520092676Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00735721-S1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00735721-S1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/26/2021520398276Open ↗
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
01/26/2021520398276Open ↗
09/27/2019520381140Open ↗
05/15/2019520339296Open ↗
Showing 3 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS25
01/30/2020520398276Open ↗
07/01/2019520381140Open ↗
08/01/2018520339296Open ↗
Showing 3 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/30/2020520398276Open ↗
05/21/2018520336823Open ↗
05/21/2018520336823Open ↗
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT45
01/30/2020520398276Open ↗
09/27/2019520381140Open ↗
07/01/2019520381140Open ↗
Showing 3 of 45 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/26/2021520398276Open ↗
▸Filing & Intake Forms33
▸BISEFILING COVER SHEET27
01/30/2020520398276Open ↗
07/01/2019520381140Open ↗
08/01/2018520339296Open ↗
Showing 3 of 27 on file for this type
▸BISBOROUGH INTAKE FORM4
09/27/2019520381140Open ↗
05/15/2019520339296Open ↗
05/10/2019520339296Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
01/13/2011520030500Open ↗
Showing 1 of 2 on file for this type