← Back
Two family converted from one family
1363 WEST 6 STREET
BROOKLYN · Bensonhurst · BIN 3173410
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R5BZoning
1,400 sfGross Floor Area
2Units
Two family converted from one family · 2,000 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction6p · 1 filing · 13 docs
Floor 1Under Construction6p · 1 filing · 13 docs
CellarUnder Construction9p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VKW DESIGN409/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VKW DESIGN INC408/18/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILD GROUPSGeneral Contractor107/25/2026
GREGG NY PLUMBING, INCPlumbing107/31/2026
Building Lifecycle
All (17)Filed (4)Permit Issued (2)Inspection (2)Special Inspection (9)
08/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2026
Special inspection requirement — Mechanical Systems
Yuxuan Liu
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yuxuan Liu
08/19/2026
Special inspection requirement — Final
Yuxuan Liu
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Yuxuan Liu
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
Yuxuan Liu
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Yuxuan Liu
08/19/2026
Special inspection requirement — Interior lighting power
Yuxuan Liu
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
Yuxuan Liu
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
Yuxuan Liu
08/18/2026
Filed — Alteration
PROPOSED PLUMBING WORK AS PER PLANS FROM CELLAR TO 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01432456-P3
08/18/2026
Filed — Alteration
PROPOSED PLUMBING WORK AS PER PLANS FROM CELLAR TO 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01432456-P2
07/30/2026
Permit issued — Plumbing
B01432456-S1-PL
07/28/2026
Filed — Alteration
PROPOSED PLUMBING WORK AS PER PLANS FROM CELLAR TO 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01432456-S1
07/23/2026
Permit issued — General Construction
B01432456-I1-GC-CX
07/20/2026
Filed — Alteration
PROPOSED PLUMBING WORK AS PER PLANS FROM CELLAR TO 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01432456-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedGREGG NY PLUMBING, INC07/30/2026
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILD GROUPS INC07/23/2026
1 project · most recent 08/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedCUBE BUILD GROUPS INCHeating and Air Conditioning Systems
Heat / Cool
Daikin 3MXM24AVJU9 24,000 BTU · Condensing Unit ×2
4MXM36AVJU9 34,600 BTU · Condensing Unit ×2
1 project · most recent 08/18/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/18/2026Permit IssuedGREGG NY PLUMBING, INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/19/2026Mechanical SystemsYuxuan Liuspecial
08/19/2026Fire-Resistant Penetrations and JointsYuxuan Liuspecial
08/19/2026FinalYuxuan Liuprogress
08/19/2026Energy Code Compliance InspectionsYuxuan Liuprogress
08/19/2026Fire-Resistance Rated ConstructionYuxuan Liuprogress
08/19/2026HVAC-R and service water piping design and insulationYuxuan Liuenergy_progress
08/19/2026Interior lighting powerYuxuan Liuenergy_progress
08/19/2026HVAC-R and service water heating equipmentYuxuan Liuenergy_progress
08/19/2026HVAC-R and service water heating system controlsYuxuan Liuenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026B01432456-I1Request digital key ↗
08/16/2026B01432456-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/20/2026B01432456-P2Open ↗
08/16/2026B01432456-S1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01432456-P2Open ↗
08/16/2026B01432456-S1Open ↗
08/16/2026B01432456-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01432456-I1Open ↗
08/23/2026B01432456-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01432456-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B01432456-P2Open ↗
08/16/2026B01432456-S1Open ↗
08/16/2026B01432456-I1Open ↗