← Back
Walk-up apt, over six families with stores
1365 FINDLAY AVENUE
BRONX · BIN 2007199
💬 Discuss this project
1924Year Built
5Stories
C7Building Class
R7-1Zoning
30,625 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized63 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: ZEVRONE REALTY HOUSING DEVELOPMENT FUND CO., INC. · 6,500 sf lot · 4.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof12p · 1 filing · 10 docs
Floor 513p · 3 filings · 16 docs
Floor 411p · 3 filings · 16 docs
Floor 39p · 1 filing · 10 docs
Floor 210p · 1 filing · 10 docs
Floor 112p · 2 filings · 13 docs
Cellar9p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LANGSAM PROPERTY SERVICES709/12/2026
ZEVRONE REALTY HOUSING DEVELOPMENT FUND CO., INC.103/22/2026
C/O LANGSAM PROPERTY SERV303/22/2026
ZEVRONE REALTY503/22/2026
ZEVRONZ REALTY CORP103/22/2026
LANGSAM PROPERTIES203/21/2026
ZEVRONE REALTY HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AQC ARCHITECT PC206/23/2026
JOSE M. LANDAURO, P.E.305/04/2026
PAUL G. JONES, P.E.104/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIGHT WAY SERVICES NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANCHISE INTERIOR DEVELOGeneral Contractor408/16/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor309/02/2026
HERNANDEZ, LElectrical103/21/2026
JOSEPH NORIEGA, JRElectrical103/21/2026
MEJIA HECTORElectrical103/21/2026
EVANS, DWAYNEElectrical103/21/2026
RALPH RUSSOElectrical103/21/2026
RICHARD ANGELORIElectrical103/21/2026
TREVOR DUNWELLElectrical103/21/2026
M&L SIGNS INCElectrical103/21/2026
HECTOR MEJIAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AQC ARCHITECT PC9533206/23/2026
INTEGRITY CONSULTING SERV666105/04/2026
JOSE M. LANDAURO3500205/04/2026
Building Lifecycle
All (79)Filed (6)Permit Issued (7)Violation (60)Objection (4)Special Inspection (2)
09/01/2026
Permit issued — Sidewalk Shed
X01382560-I1-SH
08/14/2026
Permit issued — General Construction
X01396210-I1-GC
07/27/2026
Permit issued — General Construction
X01350013-S2-GC-CX
06/23/2026
Filed — Alteration
MINOR FIRE REHAB AT APTS A-2, D-1, E-1 AND E-2, LIMITED TO REPLACEMENT OF DAMAGED PLASTER CEILINGS AS PER PLANS. NO CHG TO EXTG APT LAYOUTS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01396210-I1
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Other
06/05/2026
Permit issued — General Construction
X01350013-S1-GC-CX
06/03/2026
Permit issued — Sidewalk Shed
X01382560-I1-SF
06/03/2026
Permit issued — Supported Scaffold
X01382560-I1-SH
05/21/2026
Permit issued — Construction Fence
X01350013-I1-FN
05/19/2026
Filed — Alteration
FIRE DAMAGE REHAB AS PER PLANS AT APTS A-1, B-1, B-2, B-6, B-7, C-1, C-6, C-7, D-6, D-7, E-6, E-7. COMM SPACE WORK REQ'D FOR VANILLA BOX & STOREFRONT REPAIR. NO CHG TO EXTG APT LAYOUTS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01396157-I1
05/04/2026
Filed — Alteration
X01350013-S2
04/06/2026
Objection raised — Other
04/06/2026
Objection resolved — Addressed
04/03/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01382560-I1
03/17/2026
Violation issued (ECB, open)
Construction
03/17/2026
Violation issued (ECB, closed)
Unknown
03/17/2026
Violation issued (ECB, open)
Unknown
02/10/2026
Filed — Alteration
X01350013-S1
02/10/2026
Filed — Alteration
X01350013-I1
01/23/2026
Violation issued (HPD, open)
I
01/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSE LANDAURO
01/22/2026
Special inspection requirement — Final
JOSE LANDAURO
01/06/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
B
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
A
01/05/2026
Violation issued (HPD, open)
B
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
B
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
A
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
B
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
B
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING09/01/2026
DOB NOWGeneral ConstructionPermit IssuedFRANCHISE INTERIOR DEVELO08/14/2026
DOB NOWGeneral ConstructionPermit IssuedFRANCHISE INTERIOR DEVELO07/27/2026
DOB NOWGeneral ConstructionPermit IssuedFRANCHISE INTERIOR DEVELO06/05/2026
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING06/03/2026
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING06/03/2026
DOB NOWConstruction FencePermit IssuedFRANCHISE INTERIOR DEVELO05/21/2026
BISOTISSUEDBEST ENERGY POWER 2015 LL05/12/2022
BISOTISSUEDBEST ENERGY POWER 2015 LL12/22/2021
BISFBISSUEDABILENE, INC07/23/2014
BISPLISSUEDBELL FUEL OIL, LLC07/23/2014
BISFSISSUEDMETROPOLITAN HT&POWER CO08/15/2013
BISFSISSUEDMETROPOLITAN HT&POWER CO01/31/2012
BISOTISSUEDRICKY & BROS CONS.CO.07/31/2007
BISEQISSUEDRICKY & BROS CONS.CO.07/31/2007
BISPLISSUEDCK PLUMBING & MECH INC05/31/2005
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/25/2005
BISOTISSUEDBORO DIVERSE CONTRACTING11/05/2004
BISEQISSUEDBORO DIVERSE CONTRACTING11/05/2004
BISBLISSUEDL & C BURNER SERVICE INC.07/10/1990
4 projects · most recent 07/20/2026
General Wiring
FiledStatusContractorScope
07/20/2026Permit IssuedJ.A. ELEC INC D/B/A MIDWAGeneral Wiring
03/27/2026Permit IssuedSOLAS ELECTRICAL CORP—
01/08/2026Permit IssuedJ.A. ELEC INC D/B/A MIDWA1 meters
09/07/2021CompleteRJ RUSSO ELECTRIC CO.1 meters, 1 new_meters
1 project · most recent 04/03/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/03/2026Permit IssuedCONSOLIDATED SCAFFOLDINGScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
01/22/2026Structural Stability – Alterations of existing buildingsJOSE LANDAUROspecial
01/22/2026FinalJOSE LANDAUROprogress
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026X01382560-I1Request digital key ↗
08/16/2026X01350013-I1Request digital key ↗
08/16/2026X01350013-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION7
12/22/2021240307208Open ↗
07/23/2014220393786Open ↗
07/23/2014220393786Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
08/12/2021240307208Open ↗
07/16/2014220393786Open ↗
02/02/2012220167600Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026X01382560-I1Open ↗
08/16/2026X01350013-S2Open ↗
08/16/2026X01396157-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/29/2016220393786Open ↗
07/16/2014220393786Open ↗
07/16/2014220393786Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/16/2014220393786Open ↗
02/02/2012220167600Open ↗
07/30/2007210007712Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/02/2012220167600Open ↗
07/30/2007210007712Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
07/30/2007210007712Open ↗
08/12/2021240307208Open ↗
▸BISPC FULL REPORT1
07/30/2007210007712Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/16/2014220393786Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/12/2021240307208Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026X01350013-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026X01350013-S1Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
02/26/2015220393786Open ↗
07/16/2014220393786Open ↗
02/02/2012220167600Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/16/2014220393786Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
07/13/2015220393786Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/13/2015220393786Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
12/22/2021240307208Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026X01350013-S2Open ↗
08/16/2026X01396210-I1Open ↗
08/13/2026X01350013-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/12/2021240307208Open ↗
07/16/2014220393786Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/30/2007210007712Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/14/2026X01396157-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/01/2022240307208Open ↗
12/22/2021240307208Open ↗
08/12/2021240307208Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/29/2016220393786Open ↗
07/16/2014220393786Open ↗
07/16/2014220393786Open ↗
▸BISTECHNICAL REPORT: ENERGY2
02/02/2012220167600Open ↗
02/02/2012220167600Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/01/2022240307208Open ↗
03/29/2016220393786Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/12/2021240307208Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/12/2021240307208Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
07/01/2022240307208Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/01/2022240307208Open ↗
12/22/2021240307208Open ↗
08/12/2021240307208Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/05/2022240307208Open ↗
03/29/2016220393786Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
02/02/2012220167600Open ↗
07/30/2007210007712Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
08/12/2021240307208Open ↗
03/29/2016220393786Open ↗
07/16/2014220393786Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/01/2022240307208Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION6
12/20/2021240307208Open ↗
11/17/2021240307208Open ↗
11/17/2021240307208Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET2
07/16/2014220393786Open ↗
02/02/2012220167600Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/12/2021240307208Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
07/05/2022240307208Open ↗