← Back
BuildNYC
Public elementary, junior or senior high
Bronx Center for Science and Mathematics
1365 FULTON AVENUE · BIN 2009617
💬 Discuss this project
1956Year Built
3Stories
W1Building Class
R7-1Zoning
80,700 sfGross Floor Area
1Units
LL97 Covered19 Active Violations 0 unresolved · 19 paperwork only 6 likely answered ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 56,800 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEximius College Preparatory Academy: A College Board SchoolUnder Construction10p · 2 filings · 19 docs
Floor 1Eximius College Preparatory Academy: A College Board School15p · 3 filings · 17 docs
Sub-BasementRooftop photovoltaic solar array installationUnder Construction1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority10507/08/2026
NYC Department of Education403/22/2026
STV203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Homerun Solar108/31/2026
Savin Engineers408/28/2025
Eme Consulting Engineering Group207/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Savin Engineers P C203/21/2026
Angela Rivera303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Burrowes ConstructionGeneral Contractor507/08/2026
Bayside Refrigerationspecialty_contractor207/08/2026
Jte Electrical ServicesElectrical103/21/2026
Falcon Electrical ContractingElectrical103/21/2026
Jamcob ElectricElectrical103/21/2026
Sunkeeper Solar Electricspecialty_contractor109/02/2026
MNBC ElectricalElectrical103/21/2026
A & A Plumbing SystemsPlumbing107/08/2026
Pulsar ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Homerun Solar8772108/31/2026
MP Engineers & Architects1438101/25/2024
Tectonic Engineering Cons106101/24/2024
JPC Logistics Dba JPCL EN351207/11/2022
Building Lifecycle
All (100)Filed (7)Permit Issued (7)Violation (60)Inspection (1)Objection (8)Special Inspection (17)
09/01/2026
Permit issued — Solar
X01435918-I1-SL
08/31/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGETO USE, EGRESS OR OCCUPANCY.
X01435918-I1
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAYMOND PANCHARI
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND PANCHARI
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
RAYMOND PANCHARI
07/24/2026
Special inspection requirement — Final
RAYMOND PANCHARI
07/24/2026
Special inspection requirement — Air barrier - visual inspection
RAYMOND PANCHARI
07/07/2026
Violation issued (ECB, open)
Construction
07/07/2026
Violation issued (ECB, open)
Construction
07/07/2026
Violation issued (ECB, open)
Construction
07/07/2026
Violation issued (ECB, open)
Construction
03/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/03/2025
Permit issued — General Construction
X00994378-I1-GC
09/29/2025
Special inspection requirement — Lighting controls
09/29/2025
Special inspection requirement — Energy Code Compliance Inspections
09/29/2025
Special inspection requirement — Interior lighting power
09/09/2025
Violation issued (ECB, open)
Construction
09/09/2025
Violation issued (ECB, open)
Construction
09/09/2025
Violation issued (ECB, open)
Construction
09/09/2025
Violation issued (ECB, open)
Construction
08/29/2025
Permit issued — General Construction
X00994378-I1-GC
08/28/2025
Filed — Alteration
X01277585-I1
08/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/22/2025
Permit issued — Mechanical Systems
X00994378-S1-MS
08/22/2025
Violation issued (ECB, closed)
Construction
03/06/2025
Permit issued — Mechanical Systems
X00994378-S1-MS
02/18/2025
Permit issued — Plumbing
X00994378-S2-PL
01/13/2025
Permit issued — General Construction
X00994378-I1-GC
08/30/2024
Violation issued (ECB, closed)
Construction
08/30/2024
Violation issued (ECB, closed)
Construction
08/30/2024
Violation issued (ECB, closed)
Construction
08/30/2024
Violation issued (ECB, open)
Construction
08/30/2024
Violation issued (ECB, open)
Construction
08/30/2024
Violation issued (ECB, open)
Construction
08/30/2024
Violation issued (ECB, closed)
Construction
03/14/2024
Objection resolved — Addressed
03/14/2024
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
03/13/2024
Objection resolved — Addressed
03/13/2024
Objection resolved — Addressed
03/13/2024
Special inspection requirement — Maintenance information
JAMES WILSON
03/13/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
03/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
JAMES WILSON
03/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES WILSON
01/31/2024
Objection raised — Other
01/31/2024
Objection raised — Other
01/31/2024
Objection raised — Other
01/25/2024
Filed — Alteration
Installation of new floor drain and associated piping
X00994378-S1
01/25/2024
Filed — Alteration
Installation of new floor drain and associated piping
X00994378-S2
01/24/2024
Filed — Alteration
Installation of new floor drain and associated piping
X00994378-I1
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/23/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
01/23/2024
Special inspection requirement — Mechanical Systems
JAMES WILSON
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/15/2023
Violation issued (ECB, open)
Construction
02/15/2023
Violation issued (ECB, open)
Construction
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunkeeper Solar Electric09/01/2026
DOB NOWGeneral ConstructionPermit IssuedBurrowes Construction10/03/2025
DOB NOWGeneral ConstructionPermit IssuedBurrowes Construction08/29/2025
DOB NOWMechanical SystemsPermit IssuedBayside Refrigeration08/22/2025
DOB NOWMechanical SystemsPermit IssuedBayside Refrigeration03/06/2025
DOB NOWPlumbingPermit IssuedA & A Plumbing Systems02/18/2025
DOB NOWGeneral ConstructionPermit IssuedBurrowes Construction01/13/2025
BISOTISSUEDClear It Out Contracting12/02/2025
BISOTISSUEDCentral Mechanical Systems04/23/2025
BISMHISSUEDCentral Mechanical Systems04/23/2025
BISMHISSUEDCentral Mechanical Systems04/23/2025
BISEQISSUEDCentral Mechanical Systems04/23/2025
BISOTISSUEDCentral Mechanical Systems04/23/2025
BISMHISSUEDCentral Mechanical Systems03/28/2024
BISEQISSUEDCentral Mechanical Systems03/28/2024
BISOTISSUEDCentral Mechanical Systems03/28/2024
BISOTISSUEDCentral Mechanical Systems03/28/2024
BISMHISSUEDCentral Mechanical Systems03/28/2024
BISMHISSUEDCentral Mechanical Systems03/31/2023
BISOTISSUEDCentral Mechanical Systems03/31/2023
BISOTISSUEDCentral Mechanical Systems03/31/2023
BISOTISSUEDCentral Mechanical Systems03/31/2023
BISEQISSUEDCentral Mechanical Systems03/17/2023
BISMHISSUEDCentral Mechanical Systems03/17/2023
BISOTISSUEDCentral Mechanical Systems03/17/2023
BISMHISSUEDCentral Mechanical Systems03/17/2023
BISOTISSUEDCentral Mechanical Systems03/17/2023
BISPLISSUEDV. C. Vitanza Sons03/08/2023
BISOTISSUEDCentral Mechanical Systems03/16/2022
BISOTISSUEDCentral Mechanical Systems03/16/2022
BISOTISSUEDCentral Mechanical Systems03/16/2022
BISEQISSUEDCentral Mechanical Systems03/16/2022
BISMHISSUEDCentral Mechanical Systems03/16/2022
BISPLISSUEDV. C. Vitanza Sons03/10/2022
BISOTISSUEDCentral Mechanical Systems03/28/2021
BISOTISSUEDCentral Mechanical Systems03/28/2021
BISMHISSUEDCentral Mechanical Systems03/28/2021
BISMHISSUEDCentral Mechanical Systems03/28/2021
BISEQISSUEDCentral Mechanical Systems03/28/2021
BISPLISSUEDV. C. Vitanza Sons03/16/2021
+ 17 more permits on file
1 project · most recent 01/25/2024
Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
01/25/2024Permit IssuedBurrowes ConstructionRefrigeration Systems
Refrigeration
__Junk__ BEL0130 11,900 BTU ×2
ZF13K4W/ZF13K4E 23,800 BTU · Condensing Unit ×2
1 project · most recent 01/25/2024
Water/Sanitary
FiledStatusContractorScope
01/25/2024Permit IssuedA & A Plumbing SystemsWater/Sanitary
13 projects · most recent 09/29/2026
General Wiring Lighting
FiledStatusContractorScope
09/29/2026CompleteA & S Electric—
08/21/2026Permit IssuedKanta ElectricGeneral Wiring
07/21/2026Permit IssuedSunkeeper Solar Electric—
06/29/2026Permit IssuedUrban ElectricalGeneral Wiring
04/15/2026CompleteDNR ElectricGeneral Wiring
02/27/2026CompleteCandela Systems Corp DbaLighting
07/25/2025CompleteAnco Electl Contctng—
02/11/2025Permit IssuedMNBC ElectricalGeneral Wiring
12/03/2023CompleteJte Electrical ServicesGeneral Wiring
08/03/2021CompleteJamcob ElectricGeneral Wiring
02/07/2020CompleteFalcon Electrical Contracting—
07/26/2019CompleteCharan Electrical Enterp's—
08/23/2018CompleteFalcon Electrical Contracting—
1 project · most recent 08/31/2026
FiledStatusContractorScope
08/31/2026Permit IssuedSunkeeper Solar Electric266 panels, 160.93 kw, 6,650 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
07/24/2026Structural Stability – Alterations of existing buildingsRAYMOND PANCHARIspecial
07/24/2026Fire-Resistant Penetrations and JointsRAYMOND PANCHARIspecial
07/24/2026Energy Code Compliance InspectionsRAYMOND PANCHARIprogress
07/24/2026FinalRAYMOND PANCHARIprogress
07/24/2026Air barrier - visual inspectionRAYMOND PANCHARIenergy_progress
09/29/2025Lighting controls—energy_progress
09/29/2025Energy Code Compliance Inspections—progress
09/29/2025Interior lighting power—energy_progress
08/28/2025Fire-Resistant Penetrations and Joints—special
03/14/2024Energy Code Compliance InspectionsJAMES WILSONprogress
03/13/2024Maintenance informationJAMES WILSONenergy_progress
03/13/2024FinalGEORGE GHEBRYALprogress
03/13/2024HVAC-R and service water heating equipmentJAMES WILSONenergy_progress
03/13/2024HVAC-R and service water piping design and insulationJAMES WILSONenergy_progress
01/24/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/23/2024FinalGEORGE GHEBRYALprogress
01/23/2024Mechanical SystemsJAMES WILSONspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Eximius College Preparatory Academy: A College Board SchoolEducationFloor 1, Roof
Project X01277585 Alteration · Approved · 08/28/2025
Project X00994378 Alteration · Permit Entire · 01/24/2024
Project X00683932 Alteration · Approved · 02/18/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
10/13/2026X01435918-I1Request digital key ↗
08/24/2026X00683932-P1Request digital key ↗
08/21/2026X00994378-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/10/2026X01435918-I1Open ↗
08/24/2026X00683932-P1Open ↗
08/24/2026X00683932-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X00994378-I1Open ↗
08/24/2026X00994378-S1Open ↗
08/24/2026X00994378-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X00994378-I1Open ↗
08/24/2026X00994378-S1Open ↗
▸Trade Schedules & Equipment1
▸BISSELF-CERT PLUMBING NOTICE1
08/20/2008201015748Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/10/2026X01435918-I1Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/10/2026X01435918-I1Open ↗
08/24/2026X00683932-P1Open ↗
08/15/2026X00683932-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
08/13/2026X00994378-I1Open ↗
08/13/2026X00683932-P1Open ↗
08/13/2026X00683932-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026X00994378-S1Open ↗
08/13/2026X00994378-S2Open ↗
08/13/2026X00994378-I1Open ↗
▸Other Documents6
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal6
08/13/2026X00683932-P1Open ↗
08/13/2026X00994378-S2Open ↗
08/13/2026X00994378-I1Open ↗
Showing 3 of 6 on file for this type