← Back
Factory, industrial, semi-fireproof
1365 SENECA AVENUE
BRONX · Hunts Point · BIN 2094385
💬 Discuss this project
1952Year Built
1Stories
F4Building Class
M1-2Zoning
5,000 sfGross Floor Area
1Units
0 Open Violations
Factory, industrial, semi-fireproof · Owner of record: EDGEWHIT LLC · 5,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
Roof1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY507/08/2026
PERDOMO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC104/29/2025
ADROIT ENGINEERING PLLC301/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PERDOMO OF NY LLCGeneral Contractor507/08/2026
COSTELLO CONSTRUCTION GROGeneral Contractor307/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETI CONSULTANTS LLC7694111/21/2024
Building Lifecycle
All (19)Filed (4)Permit Issued (10)Signed Off (2)Violation (1)Special Inspection (2)
04/29/2026
Permit issued — Construction Fence
X01216599-I1-FN
06/11/2025
Signed off — Alteration
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01156408-I1
06/10/2025
Signed off — Full Demolition
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT ON GRADE AT THE TIME OF DEMOLITION
X01134888-I1
05/20/2025
Permit issued — Protection and Mechanical Methods
X01134888-S1-PMM
05/20/2025
Permit issued — Construction Fence
X01156408-I1-FN
05/20/2025
Permit issued — Full Demolition
X01134888-I1-FD
05/15/2025
Permit issued — Full Demolition
X01134888-I1-FD
05/13/2025
Permit issued — Protection and Mechanical Methods
X01134888-S1-PMM
04/30/2025
Permit issued — Construction Fence
X01216599-I1-FN
04/29/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01216599-I1
04/04/2025
Violation issued (ECB, closed)
Construction
03/21/2025
Permit issued — Full Demolition
X01134888-I1-FD
03/13/2025
Permit issued — Protection and Mechanical Methods
X01134888-S1-PMM
01/21/2025
Filed — Full Demolition
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT ON GRADE AT THE TIME OF DEMOLITION
X01134888-S1
01/15/2025
Permit issued — Construction Fence
X01156408-I1-FN
12/20/2024
Filed — Alteration
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01156408-I1
11/21/2024
Filed — Full Demolition
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT ON GRADE AT THE TIME OF DEMOLITION
X01134888-I1
11/19/2024
Special inspection requirement — Demolition
ANTHONY MUSUMECI
11/19/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
ANTHONY MUSUMECI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPLATINUM SERVICES NY LLC04/29/2026
DOB NOWProtection and Mechanical MethodsSigned-offCOSTELLO CONSTRUCTION GRO05/20/2025
DOB NOWConstruction FenceSigned-offCOSTELLO CONSTRUCTION GRO05/20/2025
DOB NOWFull DemolitionSigned-offCOSTELLO CONSTRUCTION GRO05/20/2025
DOB NOWFull DemolitionSigned-offPERDOMO OF NY LLC05/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offPERDOMO OF NY LLC05/13/2025
DOB NOWConstruction FencePermit IssuedPLATINUM SERVICES NY LLC04/30/2025
DOB NOWFull DemolitionSigned-offPERDOMO OF NY LLC03/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offPERDOMO OF NY LLC03/13/2025
DOB NOWConstruction FenceSigned-offPERDOMO OF NY LLC01/15/2025
1 project · most recent 04/29/2025
Fence
FiledStatusContractorScope
04/29/2025Permit IssuedPLATINUM SERVICES NY LLCFence
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/19/2024DemolitionANTHONY MUSUMECIspecial
11/19/2024Structural Stability – Alterations of existing BuildingsANTHONY MUSUMECIspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026X01134888-I1Request digital key ↗
08/20/2026X01134888-S1Request digital key ↗
08/20/2026X01156408-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026X01134888-I1Open ↗
08/13/2026X01134888-S1Open ↗
08/13/2026X01156408-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026X01134888-I1Open ↗
08/25/2026X01134888-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026X01134888-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01134888-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01134888-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01134888-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01134888-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01134888-I1Open ↗
▸Other Documents4
▸DOB NOWCommunity Board Notification1
08/13/2026X01134888-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026X01134888-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01134888-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01134888-I1Open ↗