ECB04/03/2009B354 5A.15.40.50A.50B.50C 50A RELIEF VALVE MUST BE REPLACED 15PSI 50B CLEAN OUT REQUIRED FOR PRESSURETROLS 50C BOILER RM MUST BE CLEANED OUT CANNOT HAVE STORAGE IN BOILER RMNothing owed — awaiting certificate of correction
Parsonage, rectory · 5,000 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.