Two stories - detached, small or mid-size
137-08 73 TERRACE
QUEENS · BIN 4142871
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2XZoning
1,144 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/13/2021$1.3M—Private party → Private party$1,136/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITISCAPE CONSULTING LTD211/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMINOV DESIGN ENGINEER403/21/2026
Building Lifecycle
All (32)Filed (2)Special Inspection (30)
12/04/2024
Special inspection requirement — Structural Steel - Details
12/04/2024
Special inspection requirement — Heating Systems
12/04/2024
Special inspection requirement — Concrete - Cast-In-Place
12/04/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
12/04/2024
Special inspection requirement — Structural Steel - High Strength Bolting
12/04/2024
Special inspection requirement — Underpinning
12/04/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/04/2024
Special inspection requirement — Mechanical Systems
12/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
12/04/2024
Special inspection requirement — Structural Wood Frame
12/04/2024
Special inspection requirement — Footing and Foundation
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
12/04/2024
Special inspection requirement — Final
12/04/2024
Special inspection requirement — Interior lighting power
12/04/2024
Special inspection requirement — Shutoff dampers
12/04/2024
Special inspection requirement — Insulation placement and R values
12/04/2024
Special inspection requirement — Fenestration areas
12/04/2024
Special inspection requirement — Ventilation and air distribution system
12/04/2024
Special inspection requirement — Fenestration air leakage
12/04/2024
Special inspection requirement — Air barrier — testing
12/04/2024
Special inspection requirement — Electric vehicle service equipment requirements
12/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
12/04/2024
Special inspection requirement — Metering
12/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
12/04/2024
Special inspection requirement — Maintenance information
12/04/2024
Special inspection requirement — Protection of exposed foundation insulation
12/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
12/04/2024
Special inspection requirement — Permanent certificate
11/26/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of plumbing and sprinkler system throughout as shown on plans.
Q00556668-P1
07/14/2021
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of plumbing and sprinkler system throughout as shown on plans.
Q00556668-I1
Nothing on file for this building.
1 project · most recent 11/26/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2024——Air Conditioning Systems
Cooling
Fujitsu AOU48RLXFZ 48,000 BTU · Heat Pump Outdoor ×9
1 project · most recent 11/26/2024
Steel Concrete Wood
FiledStatusContractorScope
11/26/2024——Steel, Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
12/04/2024Structural Steel - Details—special
12/04/2024Heating Systems—special
12/04/2024Concrete - Cast-In-Place—special
12/04/2024Excavations - Sheeting, Shoring, and Bracing—special
12/04/2024Structural Steel - High Strength Bolting—special
12/04/2024Underpinning—special
12/04/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
12/04/2024Fire-Resistant Penetrations and Joints—special
12/04/2024Structural Stability – Alterations of existing buildings—special
12/04/2024Mechanical Systems—special
12/04/2024Fire-Resistance Rated Construction—progress
12/04/2024Structural Wood Frame—progress
12/04/2024Footing and Foundation—progress
12/04/2024Energy Code Compliance Inspections—progress
12/04/2024Final—progress
12/04/2024Interior lighting power—energy_progress
12/04/2024Shutoff dampers—energy_progress
12/04/2024Insulation placement and R values—energy_progress
12/04/2024Fenestration areas—energy_progress
12/04/2024Ventilation and air distribution system—energy_progress
12/04/2024Fenestration air leakage—energy_progress
12/04/2024Air barrier — testing —energy_progress
12/04/2024Electric vehicle service equipment requirements—energy_progress
12/04/2024HVAC-R and service water piping design and insulation—energy_progress
12/04/2024Metering—energy_progress
Latest 25 of 32.
▾Documents — 7 on file (BIS + DOB NOW)
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
12/24/2021440695525Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/24/2021440695525Open ↗
▸Seals & Professional Certifications2
▸BISAPPLICANT OWNER SIGNATURE1
12/24/2021440695525Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/24/2021440695525Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/24/2021440695525Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/24/2021440695525Open ↗
▸Other Documents1
▸BISBPP - SUPPORTING DOCUMENTATION1
12/24/2021440695525Open ↗