← Back
Two family frame
137-17 MULBERRY AVENUE
QUEENS · East Flushing · BIN 4622999
💬 Discuss this project
2019Year Built
2Stories
B2Building Class
R3-2Zoning
—Gross Floor Area
2Units
0 Open Violations
Two family frame · 0.69 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (1)Violation (1)
10/04/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDTRI STATE PLBG & HTG INC01/05/2022
BIS—ISSUEDPAN LINK CONSTRUCTION INC11/22/2021
BIS—ISSUEDSAFETY PRO CONSTRUCTION10/08/2020
BISPLISSUEDTRI STATE PLBG & HTG INC01/21/2020
BIS—ISSUEDYX CONSTRUCTION INC08/07/2019
2 projects · most recent 11/12/2020
General Wiring
FiledStatusContractorScope
11/12/2020CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
11/12/2020CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
Nothing on file for this building.
▾Documents — 121 on file (BIS + DOB NOW)
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION17
11/10/2022421643476Open ↗
10/31/2022421643476Open ↗
10/12/2022421643476Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION4
01/10/2022421643476Open ↗
10/01/2020421643476Open ↗
01/28/2020421643476Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
07/20/2022421643476Open ↗
02/04/2022421643476Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/03/2021421923896Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
11/03/2022421643476Open ↗
▸BISVERIFY TAX LOT1
05/17/2022421643476Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/15/2022421643476Open ↗
▸BISZONING DIAGRAM1
08/06/2019421643476Open ↗
▸Seals & Professional Certifications6
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
08/10/2019421643476Open ↗
08/02/2019421643476Open ↗
08/02/2019421643476Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/30/2019421643476Open ↗
06/13/2018421643476Open ↗
▸BISSCHEDULE B - PLUMBING2
03/05/2021421643476Open ↗
02/24/2021421643476Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/17/2022421643476Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/17/2022421643476Open ↗
▸BISSPRINKLER SYSTEMS1
05/17/2022421643476Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/04/2022421643476Open ↗
▸BISHEATING SYSTEMS1
05/17/2022421643476Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
06/13/2018421643476Open ↗
▸BISSTREET TREES SITE PLAN1
07/19/2022421643476Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
05/17/2022421643476Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/10/2019421643476Open ↗
06/13/2018421643476Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/17/2022421643476Open ↗
▸BISINTERIOR LIGHTING POWER1
05/17/2022421643476Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/17/2022421643476Open ↗
▸BISFENESTRATION AREAS1
05/17/2022421643476Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
05/17/2022421643476Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/17/2022421643476Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/17/2022421643476Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/12/2022421643476Open ↗
▸BISLIGHTING CONTROLS1
05/17/2022421643476Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/17/2022421643476Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
05/17/2022421643476Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/17/2022421643476Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: SOIL INSPECTION2
08/02/2019421643476Open ↗
01/10/2019421643476Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/15/2022421643476Open ↗
08/10/2022421643476Open ↗
▸BISSOIL PERC. TEST-STORM WATER SYSTEM (DRYWELL)2
09/15/2022421643476Open ↗
09/15/2022421643476Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/17/2022421643476Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/17/2022421643476Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/17/2022421643476Open ↗
▸BISMASONRY1
05/17/2022421643476Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
05/17/2022421643476Open ↗
▸BISHYDRO FLOW TEST LETTER1
01/10/2019421643476Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
05/17/2022421643476Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
08/08/2019421643476Open ↗
▸BISMECHANICAL SYSTEMS1
05/17/2022421643476Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/08/2019421643476Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
05/17/2022421643476Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE7
11/10/2022421643476Open ↗
05/28/2021421643476Open ↗
05/24/2021421643476Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/10/2019421643476Open ↗
01/10/2019421643476Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/08/2019421643476Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION16
09/15/2022421643476Open ↗
09/15/2022421643476Open ↗
09/15/2022421643476Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM3
01/10/2022421643476Open ↗
10/01/2020421643476Open ↗
09/27/2019421643476Open ↗
▸BISEFILING COVER SHEET2
11/30/2018421923896Open ↗
06/13/2018421643476Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/14/2018421923896Open ↗
▸Other Documents8
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
05/17/2022421643476Open ↗
05/17/2022421643476Open ↗
▸BISCHIMNEYS1
05/17/2022421643476Open ↗
▸BISWOOD - INSTALLATION OF METAL-PLATE-CONNECTED TRUSSES1
05/17/2022421643476Open ↗
▸BISMAINTENANCE INFORMATION1
05/17/2022421643476Open ↗
▸BISPERMANENT CERTIFICATE1
05/17/2022421643476Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
05/17/2022421643476Open ↗
▸BISPLOT DIAGRAM1
06/13/2018421643476Open ↗