← Back
QUEENS
137-21GAR KALMIA AVENUE
QUEENS · East Flushing · BIN 4624737
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
137 KALMIA AVE403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC107/20/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010107/20/2023
Building Lifecycle
All (26)Filed (1)Permit Issued (1)Violation (1)Inspection (7)Objection (4)Special Inspection (12)
04/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/03/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/25/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/06/2025
Permit issued — General Construction
Q00903819-I1-GC-CX
06/05/2025
Violation issued (ECB, closed)
Construction
05/29/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/29/2024
Inspection — Certified Gas-Gas-Piping-Underground
Certified
View inspection ↗
05/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/18/2023
Objection resolved — Addressed
08/10/2023
Objection raised — Scope
07/27/2023
Objection raised — Admin
07/27/2023
Objection resolved — Addressed
07/20/2023
Filed — New Building
PROPOSED NEW GARAGE AT REAR YARD.
Q00903819-I1
07/18/2023
Special inspection requirement — Masonry
XIUCHENG LI
07/18/2023
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
07/18/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
XIUCHENG LI
07/18/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIUCHENG LI
07/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
07/18/2023
Special inspection requirement — Subgrade Inspections
XIUCHENG LI
07/18/2023
Special inspection requirement — Interior lighting power
XIUCHENG LI
07/18/2023
Special inspection requirement — Electric vehicle service equipment requirements
XIUCHENG LI
07/18/2023
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
07/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
07/13/2023
Special inspection requirement — Final
XIUCHENG LI
07/13/2023
Special inspection requirement — Footing and Foundation
XIUCHENG LI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC06/06/2025
1 project · most recent 11/13/2025
General Wiring
FiledStatusContractorScope
11/13/2025Permit IssuedPROJECT ONE ELECTRIC INCGeneral Wiring
1 project · most recent 07/20/2023
Masonry Wood
FiledStatusContractorScope
07/20/2023Permit IssuedLXC CONSTRUCTION INCMasonry, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/03/2026Fail-Final CND-Occupancy InspectionFailView ↗
06/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/29/2024Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/18/2023MasonryXIUCHENG LIspecial
07/18/2023Concrete - Cast-In-PlaceXIUCHENG LIspecial
07/18/2023Subsurface Investigations (Borings/Test Pits)XIUCHENG LIspecial
07/18/2023Excavations - Sheeting, Shoring, and BracingXIUCHENG LIspecial
07/18/2023Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
07/18/2023Subgrade InspectionsXIUCHENG LIspecial
07/18/2023Interior lighting powerXIUCHENG LIenergy_progress
07/18/2023Electric vehicle service equipment requirementsXIUCHENG LIenergy_progress
07/18/2023Energy Code Compliance InspectionsXIUCHENG LIprogress
07/18/2023Fire-Resistance Rated ConstructionXIUCHENG LIprogress
07/13/2023FinalXIUCHENG LIprogress
07/13/2023Footing and FoundationXIUCHENG LIprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026Q00903819-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00903819-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026Q00903819-I1Open ↗
08/30/2026Q00903819-I1Open ↗
08/30/2026Q00903819-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026Q00903819-I1Open ↗
08/30/2026Q00903819-I1Open ↗
08/30/2026Q00903819-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/24/2026Q00903819-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00903819-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00903819-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00903819-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00903819-I1Open ↗
▸Other Documents4
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00903819-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/24/2026Q00903819-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00903819-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00903819-I1Open ↗