Two family brick
137-23 KALMIA AVENUE
QUEENS · East Flushing · BIN 4624531
💬 Discuss this project
2023Year Built
—Stories
B1Building Class
R3-2Zoning
2,528 sfGross Floor Area
2Units
2 Open Violations ▸
Two family brick · Owner of record: 137 KALMIA AVE LLC · 3,750 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction19p · 1 filing · 20 docs
Floor 2Under Construction19p · 1 filing · 20 docs
Floor 1Under Construction20p · 1 filing · 20 docs
CellarUnder Construction20p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
137 KALMIA AVE1709/01/2026
LXC CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/04/2022$1.9M—Private party → 137 KALMIA AVE LLC— not available
07/15/2022$1.8M—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC806/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor507/08/2026
XH&RC PLBG AND HTG INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010506/23/2026
Building Lifecycle
All (99)Filed (8)Permit Issued (6)Violation (1)Inspection (11)Objection (43)Special Inspection (30)
09/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
08/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
08/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
08/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
07/20/2026
Objection resolved — Resolved
07/20/2026
Objection resolved — Resolved
07/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/23/2026
Filed — New Building
HERE WITH TO FILE THE APPLICATION FOR PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH THE NEW BUILDING Q08036501. AS PER PLAN, NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
Q08036501-P4
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
06/18/2026
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
06/18/2026
Special inspection requirement — Masonry
XIUCHENG LI
06/18/2026
Special inspection requirement — Subgrade Inspections
XIUCHENG LI
06/18/2026
Special inspection requirement — Chimneys and vents
XIUCHENG LI
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/18/2026
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
06/18/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIUCHENG LI
06/18/2026
Special inspection requirement — Wood – Seismic Resistance
XIUCHENG LI
06/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
06/18/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
06/18/2026
Special inspection requirement — Permanent certificate
XIUCHENG LI
06/18/2026
Special inspection requirement — Air barrier — testing
XIUCHENG LI
06/18/2026
Special inspection requirement — Interior lighting power
XIUCHENG LI
06/18/2026
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
06/18/2026
Special inspection requirement — Metering
XIUCHENG LI
06/18/2026
Special inspection requirement — Electric vehicle service equipment requirements
XIUCHENG LI
06/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIUCHENG LI
06/18/2026
Special inspection requirement — Maintenance information
XIUCHENG LI
06/18/2026
Special inspection requirement — Fenestration air leakage
XIUCHENG LI
06/18/2026
Special inspection requirement — Fenestration areas
XIUCHENG LI
04/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2026
Objection resolved — Resolved
03/26/2026
Permit issued — Plumbing
Q08036501-S2-PL
03/02/2026
Permit issued — General Construction
Q08036501-I1-GC
12/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/26/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/18/2025
Objection raised — Energy
11/13/2025
Objection raised — Scope
11/13/2025
Objection raised — Scope
10/30/2025
Filed — New Building
HERE WITH TO FILE THE APPLICATION FOR PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH THE NEW BUILDING Q08036501. AS PER PLAN, NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
Q08036501-S4
10/22/2025
Filed — New Building
HERE WITH TO FILE THE APPLICATION FOR PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH THE NEW BUILDING Q08036501. AS PER PLAN, NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
Q08036501-S5
09/25/2025
Objection raised — Zoning
09/15/2025
Objection resolved — Addressed
09/12/2025
Objection raised — Admin
09/05/2025
Filed — New Building
HERE WITH TO FILE THE APPLICATION FOR PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH THE NEW BUILDING Q08036501. AS PER PLAN, NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
Q08036501-P1
09/05/2025
Filed — New Building
HERE WITH TO FILE THE APPLICATION FOR PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH THE NEW BUILDING Q08036501. AS PER PLAN, NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
Q08036501-P2
06/05/2025
Violation issued (ECB, open)
Construction
02/14/2025
Permit issued — Plumbing
Q08036501-S2-PL
02/12/2025
Permit issued — General Construction
Q08036501-I1-GC
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC03/26/2026
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC03/02/2026
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC02/14/2025
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC02/12/2025
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC12/15/2023
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC08/24/2023
1 project · most recent 06/23/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2026Permit IssuedLXC CONSTRUCTION INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Gree ×13
1 project · most recent 06/23/2026
Sprinkler System
FiledStatusContractorScope
06/23/2026——Sprinkler System
1 project · most recent 06/23/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
06/23/2026Permit IssuedXH&RC PLBG AND HTG INCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 06/03/2024
General Wiring
FiledStatusContractorScope
06/03/2024Permit IssuedPROJECT ONE ELECTRIC INCGeneral Wiring
1 project · most recent 06/23/2026
Steel Masonry Wood
FiledStatusContractorScope
06/23/2026Permit IssuedXH&RC PLBG AND HTG INCSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
08/14/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
08/14/2026HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
08/14/2026HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
08/14/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
08/14/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
06/22/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/22/2026HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
06/22/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
06/22/2026HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
06/22/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
06/18/2026Air barrier - visual inspectionXIUCHENG LIenergy_progress
06/18/2026MasonryXIUCHENG LIspecial
06/18/2026Subgrade InspectionsXIUCHENG LIspecial
06/18/2026Chimneys and ventsXIUCHENG LIspecial
06/18/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/18/2026Concrete - Cast-In-PlaceXIUCHENG LIspecial
06/18/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIUCHENG LIspecial
06/18/2026Wood – Seismic ResistanceXIUCHENG LIspecial
06/18/2026Fire-Resistance Rated ConstructionXIUCHENG LIprogress
06/18/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
06/18/2026Permanent certificateXIUCHENG LIenergy_progress
06/18/2026Air barrier — testing XIUCHENG LIenergy_progress
06/18/2026Interior lighting powerXIUCHENG LIenergy_progress
06/18/2026Insulation placement and R valuesXIUCHENG LIenergy_progress
06/18/2026MeteringXIUCHENG LIenergy_progress
Latest 25 of 54.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/15/2026Q08036501-P4Request digital key ↗
08/15/2026Q08036501-S2Request digital key ↗
08/15/2026Q08036501-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/15/2026Q08036501-P1Open ↗
08/14/2026Q08036501-I1Open ↗
08/13/2026Q08036501-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08036501-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026Q08036501-S1Open ↗
08/18/2026Q08036501-P4Open ↗
08/18/2026Q08036501-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q08036501-P4Open ↗
09/01/2026Q08036501-P4Open ↗
08/29/2026Q08036501-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q08036501-P4Open ↗
08/29/2026Q08036501-S2Open ↗
08/27/2026Q08036501-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q08036501-I1Open ↗
08/13/2026Q08036501-P1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q08036501-P1Open ↗
08/13/2026Q08036501-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08036501-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial3
08/13/2026Q08036501-P1Open ↗
08/13/2026Q08036501-I1Open ↗
08/13/2026Q08036501-S1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q08036501-I1Open ↗
08/13/2026Q08036501-P1Open ↗
08/13/2026Q08036501-S1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026Q08036501-P1Open ↗
08/14/2026Q08036501-I1Open ↗