← Back
Two family converted from one family
137-32 229 STREET
QUEENS · Laurelton · BIN 4283005
💬 Discuss this project
1940Year Built
2Stories
B3Building Class
R2AZoning
1,344 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/14/2015$527K—Private party → —$392/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
TRIPLE T ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/06/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/13/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01161924-I1
01/13/2025
Permit issued — Solar
Q01161924-I1-SL
01/06/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01161924-I1
01/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/02/2025
Special inspection requirement — Final
Walid Abdulla
01/02/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/13/2025
2 projects · most recent 01/06/2025
FiledStatusContractorScope
01/06/2025CompleteSUNRUN SOLAR ELECTL CORP—
02/24/2024Permit IssuedTRIPLE T ELECTRIC INC2 meters, 2 new_meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/02/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/02/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/02/2025Energy Code Compliance InspectionsWalid Abdullaprogress
01/02/2025FinalWalid Abdullaprogress
01/02/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01161924-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026Q01161924-I1Open ↗
08/31/2026Q01161924-I1Open ↗
08/31/2026Q01161924-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026Q01161924-I1Open ↗
08/31/2026Q01161924-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01161924-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01161924-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01161924-I1Open ↗