← Back
Two family converted from one family
137-54 KALMIA AVENUE
QUEENS · East Flushing · BIN 4116547
💬 Discuss this project
1915Year Built
2.5Stories
B3Building Class
R3-2Zoning
1,592 sfGross Floor Area
2Units
6 Open Violations 5 unresolved · 1 paperwork only ▸
Two family converted from one family · Owner of record: CHEN & PAN GROUP LLC · 5,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Filed — no permit issued16p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHEN & PAN GROUP LLC703/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2025$1.2M—Private party → CHEN & PAN GROUP LLC$782/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.111/28/2025
MEI ARCHITECT PLLC108/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC603/21/2026
Building Lifecycle
All (39)Filed (3)Violation (9)Objection (3)Special Inspection (24)
07/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
12/09/2025
Objection resolved — Addressed
12/07/2025
Objection raised — Structural
11/28/2025
Filed — Full Demolition
FULL DEMOLITION OF AN EXISTING 2-STORY DETACHED RESIDENCE.
Q01325996-I1
09/17/2025
Objection raised — Other
08/26/2025
Filed — Full Demolition
FULL DEMOLITION OF AN EXISTING 2-STORY DETACHED RESIDENCE.
Q01257944-I1
08/11/2025
Filed — New Building
Q01263682-I1
08/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/04/2025
Special inspection requirement — Heating Systems
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
08/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
08/04/2025
Special inspection requirement — Fenestration areas
08/04/2025
Special inspection requirement — Insulation placement and R values
08/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
08/04/2025
Special inspection requirement — Permanent certificate
08/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
08/04/2025
Special inspection requirement — Ventilation and air distribution system
08/04/2025
Special inspection requirement — Air barrier — testing
08/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
08/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
08/04/2025
Special inspection requirement — Metering
08/04/2025
Special inspection requirement — Fenestration air leakage
08/04/2025
Special inspection requirement — Air barrier - visual inspection
08/04/2025
Special inspection requirement — Interior lighting power
08/04/2025
Special inspection requirement — Maintenance information
08/04/2025
Special inspection requirement — Protection of exposed foundation insulation
08/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
07/30/2025
Special inspection requirement — Final
07/30/2025
Special inspection requirement — Mechanical Systems
01/07/2025
Violation issued (ECB, closed)
Construction
01/07/2025
Violation issued (ECB, open)
Construction
12/27/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/29/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2024
Violation issued (ECB, open)
Construction
11/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2024
Violation issued (ECB, open)
Construction
07/19/2007
Violation issued (ECB, closed)
Quality of Life
03/12/1992
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDN/A04/25/1990
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/17/2026Electric vehicle service equipment requirements—energy_progress
08/04/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/04/2025Fire-Resistant Penetrations and Joints—special
08/04/2025Heating Systems—special
08/04/2025Energy Code Compliance Inspections—progress
08/04/2025Fire-Resistance Rated Construction—progress
08/04/2025Fenestration areas—energy_progress
08/04/2025Insulation placement and R values—energy_progress
08/04/2025HVAC-R and service water heating equipment—energy_progress
08/04/2025Permanent certificate—energy_progress
08/04/2025HVAC-R and service water heating system controls—energy_progress
08/04/2025Ventilation and air distribution system—energy_progress
08/04/2025Air barrier — testing —energy_progress
08/04/2025HVAC-R and service water piping design and insulation—energy_progress
08/04/2025Duct leakage testing, insulation and design—energy_progress
08/04/2025Metering—energy_progress
08/04/2025Fenestration air leakage—energy_progress
08/04/2025Air barrier - visual inspection—energy_progress
08/04/2025Interior lighting power—energy_progress
08/04/2025Maintenance information—energy_progress
08/04/2025Protection of exposed foundation insulation—energy_progress
08/04/2025Fenestration and door U-factor and product ratings—energy_progress
07/30/2025Final—progress
07/30/2025Mechanical Systems—special
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026Q01263682-I1Request digital key ↗
08/18/2026Q01325996-I1Request digital key ↗
08/14/2026Q01257944-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/21/2025421817305Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026Q01263682-I1Open ↗
08/13/2026Q01263682-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01263682-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/19/2026Q01263682-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026Q01263682-I1Open ↗
08/13/2026Q01325996-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01263682-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026Q01325996-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01325996-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01325996-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01325996-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01263682-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01325996-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01325996-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/19/2026Q01263682-I1Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/19/2026Q01263682-I1Open ↗
08/14/2026Q01257944-I1Open ↗
08/13/2026Q01325996-I1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026Q01257944-I1Open ↗
08/13/2026Q01325996-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01325996-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01263682-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01325996-I1Open ↗