← Back
Two family frame
137 BAY 31 STREET
BROOKLYN · BIN 3168050
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R5Zoning
2,720 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,223 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 14 docs
Cellar1p · 1 filing · 14 docs
2 jobs · most recent 11/30/2023
General Wiring
FiledStatusContractorScope
11/30/2023CompleteKWONG MING ELECTRIC INC3 meters, 3 new_meters
09/21/2023CompleteKWONG MING ELECTRIC INCGeneral Wiring
Building Lifecycle
All (33)Filed (6)Permit Issued (5)Signed Off (2)Violation (4)Inspection (3)Special Inspection (13)
12/03/2025
Signed off — Alteration
INTERIOR RENOVATION AT CELLAR AND 1ST FL FOR EXISTING 2 FAMILY, PARTITON WALL WORK AND PLUMBING WORKING WILL BE FILING SEPARATE APPLICATION .NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY.
B00828569-I1
11/03/2025
Signed off — Alteration
PLUMBING WORK ON EXIST. RESIDENTIAL HOUSE WITH, CAP/REMOVE/NEW GAS COMBINATION UNIT(HEAT & HW COIL), KITCHEN AND BATHROOM PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00834067-I1
09/18/2025
Permit issued — Plumbing
B00834067-I1-PL
08/21/2025
Filed — Alteration
PLUMBING WORK ON EXIST. RESIDENTIAL HOUSE WITH, CAP/REMOVE/NEW GAS COMBINATION UNIT(HEAT & HW COIL), KITCHEN AND BATHROOM PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00834067-P2
01/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
01/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Chun Feng
01/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Chun Feng
01/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Chun Feng
04/11/2024
Permit issued — General Construction
B00828569-I1-GC
04/11/2024
Permit issued — Plumbing
B00834067-I1-PL
01/04/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/04/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/23/2023
Filed — Alteration
PLUMBING WORK ON EXIST. RESIDENTIAL HOUSE WITH, CAP/REMOVE/NEW GAS COMBINATION UNIT(HEAT & HW COIL), KITCHEN AND BATHROOM PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00834067-P1
12/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
ALLEN SHINFELD
12/12/2023
Special inspection requirement — Energy Code Compliance Inspections
ALLEN SHINFELD
12/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALLEN SHINFELD
12/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
ALLEN SHINFELD
09/27/2023
Filed — Alteration
INTERIOR RENOVATION AT CELLAR AND 1ST FL FOR EXISTING 2 FAMILY, PARTITON WALL WORK AND PLUMBING WORKING WILL BE FILING SEPARATE APPLICATION .NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY.
B00828569-P2
09/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLEN SHINFELD
09/25/2023
Special inspection requirement — Concrete - Cast-In-Place
ALLEN SHINFELD
09/25/2023
Special inspection requirement — Lighting in dwelling units
ALLEN SHINFELD
09/25/2023
Special inspection requirement — Final
ALLEN SHINFELD
09/25/2023
Special inspection requirement — Energy Code Compliance Inspections
ALLEN SHINFELD
08/17/2023
Filed — Alteration
INTERIOR RENOVATION AT CELLAR AND 1ST FL FOR EXISTING 2 FAMILY, PARTITON WALL WORK AND PLUMBING WORKING WILL BE FILING SEPARATE APPLICATION .NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY.
B00828569-P1
07/24/2023
Violation issued (ECB, closed)
Construction
07/24/2023
Violation issued (ECB, closed)
Construction
07/24/2023
Violation issued (ECB, closed)
Construction
03/08/2023
Permit issued — General Construction
B00828569-I1-GC
03/08/2023
Permit issued — Plumbing
B00834067-I1-PL
02/24/2023
Filed — Alteration
INTERIOR RENOVATION AT CELLAR AND 1ST FL FOR EXISTING 2 FAMILY, PARTITON WALL WORK AND PLUMBING WORKING WILL BE FILING SEPARATE APPLICATION .NO CHANGE IN MEANS OF USE,EGRESS OR OCCUPANCY.
B00828569-I1
02/24/2023
Filed — Alteration
PLUMBING WORK ON EXIST. RESIDENTIAL HOUSE WITH, CAP/REMOVE/NEW GAS COMBINATION UNIT(HEAT & HW COIL), KITCHEN AND BATHROOM PLUMBING FIXTURES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00834067-I1
03/14/2011
Violation issued (ECB, closed)
Zoning
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WANG LONG 86 SUPERMARKET1107/08/2026
HIGH QUALITY CONSTRUCTION303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/13/2016$1.1M—Private party → Private party$404/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT308/21/2025
ALLEN SHINFELD, P.E. PLLC312/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE603/21/2026
HIGH QUALITY 338403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing307/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALLEN SHINFELD, P.E. PLLC1305209/27/2023
NKM ENGINEERING PLLC6244102/24/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/18/2025
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION04/11/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.04/11/2024
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION03/08/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/08/2023
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
01/24/2025Energy Code Compliance InspectionsChun Fengprogress
01/24/2025HVAC-R and service water piping design and insulationChun Fengenergy_progress
01/24/2025HVAC-R and service water heating equipmentChun Fengenergy_progress
01/24/2025HVAC-R and service water heating system controlsChun Fengenergy_progress
12/12/2023HVAC-R and service water heating equipmentALLEN SHINFELDenergy_progress
12/12/2023Energy Code Compliance InspectionsALLEN SHINFELDprogress
12/12/2023HVAC-R and service water piping design and insulationALLEN SHINFELDenergy_progress
12/12/2023HVAC-R and service water heating system controlsALLEN SHINFELDenergy_progress
09/25/2023Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
09/25/2023Concrete - Cast-In-PlaceALLEN SHINFELDspecial
09/25/2023Lighting in dwelling unitsALLEN SHINFELDenergy_progress
09/25/2023FinalALLEN SHINFELDprogress
09/25/2023Energy Code Compliance InspectionsALLEN SHINFELDprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00828569-I1Request digital key ↗
08/27/2026B00828569-P2Request digital key ↗
08/27/2026B00828569-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature11
08/28/2026B00834067-P2Open ↗
08/28/2026B00834067-P2Open ↗
08/28/2026B00834067-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026B00828569-P2Open ↗
08/27/2026B00828569-P1Open ↗
08/27/2026B00828569-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026B00828569-P2Open ↗
08/24/2026B00828569-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B00828569-P2Open ↗
08/27/2026B00828569-P1Open ↗
08/27/2026B00828569-I1Open ↗
Showing 3 of 6 on file for this type